Emergency Responder Radio Coverage Systems (ERRCS) in California

For general contractors, owners and design teams facing a public safety radio coverage requirement under California Fire Code Section 510. We test coverage, design the donor, amplifier and distribution, and work the approvals with the fire code official and the public safety license holder before anything is ordered.

License
CSLB #472017
Installed by
Our own technicians
Service area
All of California

No obligation, and we will say so if the work is outside our license.

CSLB #472017 · Licensed C-7 contractor Portable two way radios on a charging rack with spare batteries and speaker microphones
Equipment we install for this system
  • Comba Telecom
  • ADRF
  • Bird Technologies
  • Fiplex

We are not tied to any brand. If your drawings call for something else, we install to the specification.

What California Fire Code Section 510 requires#

California Fire Code Section 510 requires a building to provide adequate radio coverage for emergency responders inside it. The practical test is whether a firefighter’s portable radio works in the basement, in an interior exit stair and on the top floor while talking to the dispatch system outside. Where the building does not deliver that on its own, the owner installs a system that does: an emergency responder radio coverage system, ERRCS for short, often named after its main component, the bidirectional amplifier or BDA.

Two things about Section 510 catch project teams out. It reaches existing buildings and not only new construction, so a renovation or a change of occupancy can bring the requirement with it. And it leaves the specifics to the local fire code official, so the answer to “what does the code require” is always “what has this jurisdiction adopted.”

A commercial cellular DAS is a different system: it carries carrier frequencies for phones and is approved by the carriers. An ERRCS carries public safety frequencies, is approved by the fire code official and by the agency holding the FCC license for the radio system, and uses equipment listed for that purpose. The two can share riser pathway and head end space and nothing else.

Thresholds and coverage criteria are set locally#

Section 510 does not set one statewide trigger. The fire code official decides which buildings need a system and what coverage they have to deliver, and jurisdictions publish those decisions in local amendments and fire prevention standards. On government and public works projects the requirement is often written into the specification; on private work it usually arrives from the fire district during plan review.

The criteria below are commonly adopted in California. Confirm each one against the standard your jurisdiction has actually adopted before you budget against it.

ItemCriterion commonly adopted in California
Building heightVaries by jurisdiction: some adopt two or more stories above grade, others three or more
Building areaAdopted triggers run from about 10,000 to 30,000 square feet
Basement area5,000 square feet or more
Below grade levelsCaught by the basement or below grade trigger, written differently in each jurisdiction
General coverage90 or 95 percent of each floor area, depending on the standard
Critical areas99 percent coverage
Typical critical areasFire command center, fire pump room, interior exit stairs

Even the definition of a critical area moves between jurisdictions: some add elevator lobbies, elevator machine rooms or areas of refuge, and some write a separate criterion for the underground garage. Ask the fire code official in writing, early, and keep the reply.

The grid test and how a deficiency surfaces late#

Coverage is demonstrated by testing, not by argument. Each floor is divided into a grid of equal test areas, and a radio on the relevant public safety frequencies measures inbound and outbound signal in each area. The adopted standard sets the minimum signal level, the share of grid areas that must pass, and in many jurisdictions a delivered audio quality criterion, because a signal that meets a level and still sounds unintelligible does not help the person holding the radio.

Here is the sequence that puts projects in trouble. The building is designed, permitted and built. Nobody scoped ERRCS because the drawings did not show it. Late in the job the fire district requires a coverage test as a condition of the certificate of occupancy. The test fails, usually in the basement, the interior stairs and the core. Now the owner needs a designed system, an approved design, written consent from the FCC license holder, ordered equipment with real lead times, riser pathway in a finished building, and a retest, all standing between them and occupancy. That sequence is the most expensive way to buy an ERRCS.

Testing early costs a fraction of it. An existing building can be tested before the drawings are final on a renovation, or before close of escrow on an acquisition. New construction can be tested once the structure is enclosed and the skin is on, late enough to be accurate and early enough to act on.

Donor antenna, amplifier and distribution design#

The architecture resembles a cellular DAS and the details differ at every step.

Donor antenna. A directional antenna on the roof aimed at the public safety radio site serving the area. Its aim, its isolation from the indoor antennas and the loss on the run down to the amplifier are calculated, not estimated. Roof penetrations and mounting are coordinated with the general contractor and the structural scope.

Bidirectional amplifier. Takes the donor signal, amplifies it in both directions and feeds the distribution. Amplifiers are either band selective, passing a whole public safety band, or channelized, passing only the specific channels the license holder authorizes. Many license holders require channelized filtering so the system cannot amplify or interfere with a neighboring agency’s channels, which is one more reason the license holder’s review comes before the purchase order.

Distribution. Coax with splitters, couplers and taps in smaller buildings, fiber to remote units in larger ones, pulled and tested the same way as any other fiber backbone. The loss budget is worked run by run.

Antennas. Placed to cover the grid the acceptance test will use, with interior exit stairs, elevator hoistways, the fire command center and every below grade level designed deliberately rather than picked up by spillover; we design and locate the hoistway and cab antennas, and any installation inside the hoistway or the car is performed by the elevator contractor’s Certified Competent Conveyance Mechanic.

Survivability. Adopted standards commonly require pathway and components in defined areas to be protected so the system keeps working during a fire. The requirement and the accepted method come from the standard the jurisdiction adopted, and the design is built to that.

Comba Telecom, ADRF, Bird Technologies and Fiplex turn up regularly on the California ERRCS submittals we bid, and the amplifier we install is whichever one the fire code official and the license holder have approved for the project.

Listing, secondary power, ongoing testing and the fire alarm interface#

The model regulation requires bidirectional amplifiers and related equipment to be certified to UL 2524 by a nationally recognized testing laboratory. No California standard we reviewed adds a separate California State Fire Marshal listing on top of that. Confirm the listing basis with the fire code official before equipment is ordered, because changing amplifiers after a submittal costs a resubmittal plus lead time.

Secondary power keeps the system running when the building loses power. Adopted standards set a duration the backup has to carry and require the battery and charger to be monitored. We size and install the batteries to the duration the adopted standard requires and show the calculation on the submittal.

Once accepted, an ERRCS becomes a maintained system. Inspection and testing on a recurring schedule is standard in adopted regulations, with records the fire code official can ask for at any time. That work fits under our service and maintenance scope, and an owner who lets it lapse learns about it at the next inspection.

The fire alarm interface belongs to the fire alarm contractor. Adopted standards require the ERRCS to report trouble conditions to the building fire alarm system: antenna failure, amplifier failure, loss of normal power, battery failure. Those connections are fire alarm work performed by a licensed C-10 fire alarm contractor, who programs the fire alarm control panel and installs the monitor modules. We provide the dry contacts, land our side, agree the point list and test the interface together.

Who is qualified to install ERRCS in your jurisdiction#

Settle this before anyone bids.

California’s model ERRCS regulation and Sacramento Metropolitan Fire District Fire Prevention Standard 32 both identify a valid C-7 or C-10 California contractor’s license as the minimum qualification for the ERRCS installing entity. Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017.

Minimum is not the whole answer, and requirements vary meaningfully by jurisdiction. San Francisco routes these systems through its fire alarm and signaling systems submittal bulletin rather than a standalone ERRCS standard, which changes the submittal path without settling the licensing question. Most California ERRCS regulations require the designer and the lead installer to hold an FCC General Radiotelephone Operator License, and many add manufacturer training and NICET credentials on top of the contractor’s license. We read the adopted standard for the project’s jurisdiction and confirm those credentialing requirements against it before we contract the scope. Where a standard calls for a credential the team has to source elsewhere, we say so at bid time, and the scope goes either to a contractor who holds it or to us for the portion we are qualified to perform.

Approval by the license holder sits outside all of that. All ERRCS work is subject to prior design approval and the express written consent of the FCC public safety license holder. In Sacramento County that is the Sacramento Regional Radio Communications System, SRRCS. Other counties and cities have their own radio system operators with their own submittal processes. Telelink is based in Sacramento, which puts most of our regional work inside the SRRCS service area; elsewhere we confirm that operator’s process before committing to a date. See Sacramento and Central Valley.

Getting ahead of it instead of finding out at occupancy#

An order of operations that keeps this scope off the critical path:

  1. Ask the fire code official, in writing, whether the project triggers a coverage requirement and which standard applies. Do it at design development, not at permit.
  2. Test coverage in the existing building, or in the new structure once it is enclosed. Results before interior finishes go in are cheap and actionable.
  3. If a system is required, submit the design to the fire code official and the FCC license holder at the same time. Two approvals, two review cycles, run in parallel.
  4. Get riser pathway and head end space secured while the walls are still open.
  5. Order equipment only after the design is approved and the listing question is settled in writing.
  6. Test, correct, retest with the fire district present, and turn over the records.

Run in that order, an ERRCS is one more permitted system with a review cycle. Left to the end, it holds up occupancy. Our Division 27 and Division 28 spec checklist covers where scopes like this get lost between bid packages, and for general contractors has our prequalification information.

Next step#

Send the address, the occupancy, the story count and the square footage, and tell us which fire jurisdiction the project sits in, through request a bid. We will confirm the applicable standard with the fire code official, scope a coverage test, and tell you plainly whether we can hold the whole scope in that jurisdiction or only part of it.

FAQ

Questions about public safety radio (errcs)

Does our building need an ERRCS?

The fire code official decides. California Fire Code Section 510 requires adequate emergency responder radio coverage, and each jurisdiction sets the thresholds and coverage criteria it enforces. Adopted criteria vary. Across the California standards we work to, area triggers run from roughly 10,000 to 30,000 square feet and general area coverage is set at 90 or 95 percent. Below grade levels are picked up by the basement or below grade trigger rather than by a separate parking rule, and that trigger is written differently in every jurisdiction. Ask the fire district in writing during design and keep the answer in the project record.

Link to this answer
Is a cellular DAS the same thing?

They are two different systems. A commercial cellular DAS improves carrier coverage for phones and tablets and is approved by the carriers. An ERRCS operates on public safety frequencies, is approved by the fire code official and the FCC public safety license holder, and uses equipment listed for that purpose. A cellular system does not satisfy a Section 510 requirement, and the two are submitted and tested separately even when they share riser pathway.

Link to this answer
Who has to approve the design?

At minimum the fire code official and the holder of the FCC license for the public safety radio system. In Sacramento County that is the Sacramento Regional Radio Communications System, SRRCS. Both reviews happen before installation, and the license holder's consent has to be express and in writing. Run the two reviews in parallel and start them early, because approvals rather than installation set the schedule on this scope.

Link to this answer
Does the equipment need a California State Fire Marshal listing?

The model regulation requires bidirectional amplifiers and related equipment to be certified to UL 2524 by a nationally recognized testing laboratory. None of the California standards we reviewed adds a separate California State Fire Marshal listing on top of that, and a CSFM listing is not a statewide legal requirement for this equipment. Confirm the listing basis with the fire code official before ordering, because changing amplifiers after a submittal is a resubmittal plus a lead time.

Link to this answer
Do you connect the system to the fire alarm panel?

The trouble reporting and monitoring connections between an ERRCS and the fire alarm system are fire alarm work, performed by a licensed C-10 fire alarm contractor as a coordinated scope. That contractor programs the fire alarm control panel and installs the monitor modules. We provide the dry contacts, land our side, agree the point list with them and test the interface together.

Link to this answer

Question not answered here? Ask a person who does this work.

Call (916) 340-7503Email usOr send drawings to bid

Reviews

What clients have said

Excerpts from reviews clients left on Google over roughly the last ten years. Most of them describe phone, cabling, camera and service work rather than large construction projects, which is a fair picture of who was writing reviews at the time.

  • These guys handled my phone and phone system move along with wire our new office from top to bottom. When all others failed, such as AT&T, Telelink was there to pick up the pieces. Most important out of all the great things I could say, they took all my calls and emails, no matter what time of day or night, even on the weekend and holidays. They know what they are doing and get it done right the first time.

    U.S. Certified SignersOffice move: phone system relocation and a full office cabling installation
  • I had an issue with my cameras and called for help. He was able to get me on the schedule within the week. They came out, diagnosed the problem, and fixed everything within a couple hours. Very professional, affordable, and fast.

    Evan KorisService call on an existing camera system
  • After switching telephone and internet from ATT to Comcast, I needed to have some phone and data lines moved. I called Telelink and immediately received a professional response. An appointment was efficiently scheduled to coordinate with Comcast. The technicians were friendly, capable, and extremely helpful in working through some glitches. After the service, I received an invoice which was honest and very reasonable.

    Glick OfficeMoves and changes on phone and data lines, coordinated with the carrier

Reviews are reproduced as written, trimmed only where an excerpt is marked with an ellipsis. Have we worked for you? Tell us how it went.

TELELINKBusiness Services

Planning a public safety radio (errcs) project? Let’s talk.

Send over a drawing set or just describe what you need. We will tell you what we can take on, what to plan for, and how soon we can be there.