- Directors of engineering and chief engineers
- Regional facilities and IT directors at management companies
- Owners and asset managers funding a property improvement plan
- GCs on ground up and full renovation hotel projects
- Guest room cabling, one home run per room
- High speed internet access and property wide Wi-Fi
- In-room entertainment and video distribution
- Staff safety device infrastructure
- Surveillance in public areas and back of house
- Meeting and banquet AV, paging and digital signage
- Labor Code 6403.7, added by AB 1761, guest room panic buttons
- PCI DSS: physical separation, labeling and documented pathways
- ADA guest room communication features and assistive listening
- BSIS Alarm Company Operator license for monitored alarm devices
| Typical scope | Guest room cabling, HSIA, cameras, AV, signage |
|---|---|
| Phasing | Floor by floor around occupied rooms |
| Guest room drops | AP home run plus TV, lock, thermostat, safe |
| Staff safety | Network attached devices on the property network |
| Adjacent proof | Little Tokyo Towers, Horton House |
| License | CSLB #472017, C-7 Low Voltage Systems |
Hotel renovation: occupied building work on a tight schedule
A hotel renovation is occupied building work. The scope repeats room by room, it’s phased floor by floor on a hard schedule, and the owner is counting every displaced room night. We phase occupied apartment and senior housing buildings a floor at a time without displacing the people living in them. A hotel works the same way, but with a tighter schedule and a revenue number on every night a room is out of service.
Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We haven’t published a hotel project yet, but two of our occupied renovations are a close match. At Little Tokyo Towers and Horton House, one multifamily and one senior housing building, we self-performed the same cabling, wireless, video, camera and access control scope to the ANSI/TIA standards this page bids to, certified drop by drop. A guest room floor has the same conditions as an occupied multifamily rehab: closed walls, live risers, a corridor in use, one scheduled visit per room, and a floor that has to be handed back clean on schedule. Here, though, the operator is selling rooms behind us, so we measure the job in rooms per crew per day.
What we self-perform, and how our occupied phasing carries over
We self-perform guest room and back-of-house cabling, riser and pathway work in occupied buildings, wireless design from an on site survey, video distribution, cameras, access control field devices and head ends, meeting space AV and digital signage. We build to ANSI/TIA-568, TIA-569, TIA-606 labeling and TIA-607 bonding. Permanent links are certified with a calibrated tester rated for the category installed (Level III for Cat6 and Level IIIe for Cat6A). Fiber is tested to Tier 1, and we add Tier 2 OTDR traces where the specification calls for them.
Little Tokyo Towers in Los Angeles was an occupied multifamily renovation: property wide Wi-Fi, CATV distribution, cameras and access control, installed around people who stayed in the building. Horton House in San Diego added nurse call, phased around care schedules. Guest room floors get the same phasing.
Guest room cabling, priced and phased by the room
We price hotel work by the room, then sequence the floors. A current guest room prototype carries a home run per room for the in-room access point, plus drops for the television, the door lock gateway, the thermostat or energy management controller, and the safe.
| Guest room device | Drop | Note |
|---|---|---|
| In-room access point | Cat6A home run to the floor IDF | PoE, per room coverage |
| Television | Cat6 or coax to the head end | IPTV or RF |
| Door lock gateway | Cat6 to the floor IDF | Reporting path |
| Thermostat or energy management | Cat6 or a gateway drop per floor | Platform dependent |
| In-room safe | Cat6 where the safe reports centrally | Often standalone |
A classic hotel failure is corridor only access point coverage. It passes a walk test in an empty hallway, then tends to struggle at eight in the evening when the doors are shut, the rooms are full and everyone is streaming through a demising wall. Guest room design has been moving toward an access point in every room, or every other room with the layout verified by survey. That choice drives the drop count, the IDF count, the switch ports and the PoE budget, so it belongs in design rather than a change order. Our wireless networks page covers the survey.
The per room price depends on the drop count in the prototype, the riser distance to the head end, whether the room gets its own gateway, and whether the head end is being replaced.
HSIA, entertainment and the property management system
The head end is where a hotel network stops looking like an office network. High speed internet access runs through a bandwidth manager that shapes traffic per device and per room, and a captive portal that authenticates the guest. It also needs a property management system interface so the portal can check the guest against the folio for room charge and loyalty authentication. We list that as an interface point in the bid, because it involves the PMS vendor, the gateway vendor and the brand program at once.
In-room entertainment goes one of two ways. An RF head end distributes over coax, and it’s still the practical choice where the existing coax plant is sound. IPTV distributes over the data network and needs multicast handled correctly, switch capacity sized for it, and content protection the programmer will accept. Casting needs per room isolation so one guest can’t see or cast to another guest’s device. That isolation is configuration on infrastructure we install, so it belongs in design rather than commissioning week.
Staff safety devices and the infrastructure behind them
California Labor Code Section 6403.7, added by AB 1761, requires hotel employers to provide employees who work alone in a guest room with a panic button at no cost to the employee, along with response protocols. Local ordinances add another layer in the city of Los Angeles, Los Angeles County, Long Beach, Santa Monica and Oakland, and the local ordinance is frequently the stricter one.
A few infrastructure questions decide whether the system works:
- Device density and repeater placement. If a device can’t reach a receiver from the bathroom of a corner room, that’s a coverage gap.
- Floor to floor location accuracy, which is hard in a stacked concrete building where a signal from the ninth floor can read as the eighth.
- Whether the system rides the property network or a standalone mesh, which decides the cabling, PoE load, head end location and who owns the system after turnover.
- Coverage in stairwells, service corridors, laundry and the back-of-house routes housekeeping crosses alone.
We survey for those answers and install the infrastructure. Which trade installs the device itself depends on what the device is. A network attached device reporting to a front desk console or a software client is low voltage infrastructure, and that’s our work. A monitored alarm device (one that signals a central station or is sold and serviced as an alarm system) is alarm work under a BSIS Alarm Company Operator license, and a licensed alarm company carries it. Before the bid, we’ll tell you which side of that line a specified product falls on.
Back of house, meeting space and parking
A lot of the drop count is in the back of house. Point of sale needs a terminal drop at every outlet, plus a spare wherever a station will grow. Kitchen display drops run in a hot, wet environment, so the jacket, enclosure rating and routing away from hood and dish areas get specified rather than assumed. Timeclocks, receiving and housekeeping need ports too.
Meeting and banquet space is a scope of its own. Divisible rooms need a DSP with room combining logic tied to the air wall configuration, ceiling microphones and speakers zoned to match, and a control interface a banquet captain can run without much training. Floor boxes have to be coordinated before the slab is cored. Digital signage at the meeting room doors and sound masking near guest room corridors use the same pathways.
Surveillance covers public areas, cash handling points, receiving, back-of-house corridors and the parking and valet areas. A garage camera has a different optical problem than a corridor camera, with sunlit entrances, dark decks and vehicles moving between the two. Our security camera page covers dynamic range, low light and NDAA Section 889 documentation.
Code, PCI and the brand standard cycle
Three California requirements affect a hotel low voltage bid, each with its own authority and trade boundary.
| Requirement | What it means on the bid | Who carries it |
|---|---|---|
| Labor Code 6403.7, added by AB 1761 | A panic button for employees working alone in a guest room, plus response protocols. Ordinances in Los Angeles city and county, Long Beach, Santa Monica and Oakland layer on top | Employer sets policy. Telelink installs the network attached device infrastructure |
| ADA | Guest room communication features and assistive listening in meeting spaces | Design team sets counts. Telelink installs and tests |
| BSIS Alarm Company Operator license | A device that signals a central station is monitored alarm work rather than low voltage infrastructure | A licensed alarm company. Telelink installs the network attached device infrastructure |
PCI DSS isn’t a California requirement. It’s a card brand contractual standard, but it still affects the bid, so here’s what it asks of a cabling contractor. PCI segmentation is network engineering: VLANs, firewall rules, access control lists and a scope boundary a qualified security assessor signs off on. The cabling contractor’s part is physical: separate patch fields for the cardholder data environment, distinctly colored and labeled cardholder cabling, documented pathways, and lockable cabinet space. We deliver and document that part so the assessor can see it.
Hotels also spend on a schedule of their own, set by brand standards and the property improvement plan cycle. A franchised property is on a PIP cycle whether or not anything new is being built. The brand revises its network, guest room technology and entertainment requirements periodically, which forces upgrades unrelated to new construction. The governing bandwidth and device figures are in that standard, which the brand controls, so they should come from the current document rather than a web page. Our process is to get the current standard, read it against the existing plant, list what conforms and what doesn’t, and price the difference with section numbers cited.
Next step
Send us the guest room floor plans, the room count by type, the brand standard sections and the phasing plan through our request a bid page. We’ll price the job per room by type and sequence the floors against the operator’s inventory plan. The bid also lists the PMS and head end interface points and the scope lines with the alarm company, door hardware and electrical trades. General contractors can see how we bid on our general contractor page.