CSLB #472017, C-7 Low Voltage Systems

Services

Low Voltage Services for Commercial Buildings in California

Our own technicians install everything that runs on a building's low voltage cabling. They build it to the specification, then test, label and document it. We work in commercial and institutional buildings across California.

License
CSLB #472017
Classification
C-7 Low Voltage Systems

No obligation. If the work is outside our license, we'll tell you.

All services

Low voltage services by system type

We've grouped the services by what each system does. Every page explains what's included and what isn't, the standards we install to, what tends to drive cost, and where our work stops and another trade's starts.

After the project closes

Moves, adds and changes, troubleshooting, device replacement and service agreements, whether we installed the system or not.

1service

Platforms

Platforms we work with every week

These are the systems we install and configure most often, but we aren't tied to any of them. If your spec calls for something else, we'll install to the spec.

  • Cisco MerakiCloud-managed switching, wireless, security appliances and cameras
  • YealinkIP desk phones, cordless and conference phones for hosted VoIP
  • ButterflyMXVideo intercom and smart access for multifamily and senior housing
  • DoorKingTelephone entry, gate and vehicular access control

FAQ

Questions about our services

Do your own technicians do the installation?

Yes. Our own employees handle the installation for the services on this page, under our C-7 license. We coordinate door hardware and line voltage with the trades that hold those scopes, and our bids spell that out.

Link to this answer
Can one contractor really handle all of Division 27 and Division 28?

For the communications and electronic security sections on this page, yes. That's what the C-7 classification covers, and it's how our crews are trained.

Link to this answer
Which parts of California do you work in?

We bid commercial and institutional work across California. Recent projects include Los Angeles, San Diego, Vallejo and Sacramento, and mobilization is built into the proposal, so you can see it up front.

Link to this answer
What do we get at the end of the job?

You get certified test results for the cable and fiber links, labeled as-built drawings, an equipment list with serial numbers, warranty paperwork and configuration exports for any platform we set up. It all comes together in a binder your IT team will keep using.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid

Reviews

What clients have said

Here are a few excerpts from reviews our clients have left for us on Google.

  • These guys handled my phone and phone system move along with wire our new office from top to bottom. When all others failed, such as AT&T, Telelink was there to pick up the pieces. Most important out of all the great things I could say, they took all my calls and emails, no matter what time of day or night, even on the weekend and holidays. They know what they are doing and get it done right the first time.

    U.S. Certified SignersOffice move: phone system relocation and a full office cabling installation
  • I had an issue with my cameras and called for help. He was able to get me on the schedule within the week. They came out, diagnosed the problem, and fixed everything within a couple hours. Very professional, affordable, and fast.

    Evan KorisService call on an existing camera system
  • After switching telephone and internet from ATT to Comcast, I needed to have some phone and data lines moved. I called Telelink and immediately received a professional response. An appointment was efficiently scheduled to coordinate with Comcast. The technicians were friendly, capable, and extremely helpful in working through some glitches. After the service, I received an invoice which was honest and very reasonable.

    Glick OfficeMoves and changes on phone and data lines, coordinated with the carrier

Each review appears as the client wrote it. Where we shortened one, you'll see an ellipsis. Have we worked for you? Tell us how it went.

TelelinkBusiness Services, home

Have a project coming up? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.