CSLB #472017, C-7 Low Voltage Systems

Areas we serve

Low Voltage Contractor Serving Sacramento and the Central Valley

We work with general contractors, state agency facilities staff, property owners and IT directors across Sacramento, the foothills, Yolo and eastern Solano, and the northern San Joaquin Valley. The State Controller's Office project shows the kind of work we deliver.

Delivered here
State Controller's Office, Sacramento

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor Tower Bridge and the Sacramento skyline
Working in this region
In the regionSince 1983
PermittingCity, county and state building review paths
Prevailing wageDIR county determinations, certified payroll
LaborPLA and union requirements addressed at bid
ProofState Controller's Office tenant improvement
LicenseCSLB #472017, C-7 Low Voltage Systems

Working the Sacramento region since 1983

We’ve worked in the Sacramento region since 1983. A site walk in Rancho Cordova or Roseville is done by the estimator who’ll price the job. Punch list items downtown are handled by our own technicians, usually the crew that did the work. And our project managers know the loading dock hours and garage clearances downtown.

AreaHow it’s staffed and priced
Sacramento core and downtownOur own technicians for install, punch and service
Roseville, Rocklin, Folsom, Elk Grove, DavisNo mobilization premium
Vacaville, Fairfield, DixonBid as part of this region
Stockton, Lodi, Tracy, Manteca, Modesto, TurlockNo separate mobilization line; I-5 and Highway 99 traffic planned into the day
Vallejo and BeniciaCovered on the Bay Area page, not this one

As we define it, the region runs from the Sacramento core out to Placer and El Dorado counties on the east, Yolo on the west, the Vacaville and Fairfield side of Solano County, and south through San Joaquin and Stanislaus counties. Western Solano is more like the Bay Area in traffic, labor market and building departments, so we bid it there.

Most of our work here is commercial and institutional: state agency tenant improvements, office TI for private landlords, K-12 and community college campuses, clinics, multifamily rehabs and distribution buildings along the I-5 and Highway 99 corridors. We do not do residential work in any region, including this one.

Permitting paths: city, county and state-owned buildings

In this region, low voltage permitting depends on the address. Two projects ten minutes apart can fall under two different jurisdictions.

JurisdictionPermitting authorityPath for the low voltage scope
City of SacramentoCommunity Development DepartmentOnline submittal and permit tracking through an Accela-based citizen portal
Unincorporated Sacramento CountyCounty Building Permits and Inspection DivisionA separate office with its own plan checkers, inspectors and scheduling
Elk Grove, Folsom, Rancho Cordova, Citrus Heights, Roseville, RocklinEach city’s own building divisionOwn counters, portals and inspection scheduling
Davis, Woodland, West Sacramento, Stockton, ModestoEach city’s own building divisionOwn counters, portals and inspection scheduling
State-owned buildingsNot permitted at the city counterState Fire Marshal and DSA review, with DGS controlling the floor
Community college and K-12Division of the State ArchitectDSA plan review with a DSA inspector of record
Sacramento State and UC DavisThe campus is its own building officialState Fire Marshal review, campus inspection

On most commercial low voltage scopes, the cabling, camera and access control work is permitted under the project’s building permit or an electrical permit pulled by the GC or the electrical contractor. Our work is then inspected alongside the rest of the electrical rough-in and finish. Where a jurisdiction wants a separate low voltage or electrical permit for our scope, we pull it under CSLB #472017. We confirm which path applies during bid review and write it into the scope letter, because an unpulled permit can stall the final inspection.

Inspectors here look for the same things everywhere: firestopping at rated penetrations, plenum-rated cable where the ceiling is a return air plenum, support and pathway fill, and separation from line voltage. We plan for those expectations from the first pull.

Working in state office buildings

Sacramento is the state capital, and a lot of the tenant improvement work here happens inside state-owned or state-leased office buildings. These projects don’t run like a private office TI. Four separate authorities have a hand in the low voltage scope.

Review or controlWho holds itWhat it governs
Fire and life safety plan reviewOffice of the State Fire MarshalPenetrations, rated assemblies, plan approval
Accessibility reviewDivision of the State ArchitectDevice heights, path of travel, mounting locations
Floor access and building operationsDepartment of General Services, which manages the buildingsBadging for every worker, loading dock reservations, freight elevator windows, after-hours HVAC, and when noise-producing work is allowed near occupied cubicles
Cable color, labeling, rack elevations, network room accessThe tenant agency’s IT groupThe agency standard, which typically takes precedence over the generic spec

We ask for the agency IT standard before submittals go out. Our State Controller’s Office project was this kind of job: a working agency floor with staff at their desks, where we delivered network cabling and an IT network room buildout in sequence with the rest of the TI, plus surveillance.

Background checks and badging for agency work take time to process, so we put them on the schedule at kickoff, well ahead of mobilization.

Prevailing wage and labor requirements in the Sacramento region

Public work in the region is prevailing wage work under Labor Code 1720 and following, whether it’s a state building, a county facility, a school district or a city project. The Department of Industrial Relations publishes general prevailing wage determinations by county and classification twice a year.

Where the work isWage determination pricedIBEW jurisdiction
Sacramento, Placer, El Dorado and Yolo countiesCommunications and Systems Installer and Technician for low voltage scopeLocal 340
Eastern Solano, including Vacaville, Fairfield and DixonCommunications and Systems Installer and TechnicianLocal 180, the Vallejo local, which covers Solano County
San Joaquin and Stanislaus countiesEach county’s own determination, read on the bid dateOther locals, confirmed at bid
Any county, scope crossing into electricalInside WiremanSame as the county

Rates, fringe amounts and predetermined increases differ by county, so we price each bid against the determination in force for the project location and bid date. Public projects also require DIR contractor registration under Labor Code 1725.5, certified payroll submitted through DIR’s electronic system, and apprenticeship compliance under Labor Code 1777.5. Registration and current certificates are in the prequalification packet.

Some public projects, and a few private ones, carry project labor agreements or other labor requirements. We address those at bid time, in writing in the scope letter, so our position is on paper before award.

Access, parking and staging around the Capitol and on campuses

Downtown Sacramento has a small footprint and a lot of state employees. Near Capitol Mall, the R Street corridor and the state office buildings east of the Capitol, contractor parking means a garage or metered street parking. The building manager will tell you which lot, if any, the project can use. Loading docks are shared with the building’s daily deliveries, and freight elevators get reserved in advance. On a state floor, materials come up in the window the building manager gives you, and material isn’t staged in corridors.

Campus work comes with its own access rules. Sacramento State, UC Davis, the Los Rios community colleges and the K-12 districts all issue contractor parking permits, restrict truck routes during class changes, and prefer heavy work during academic breaks. We schedule around those calendars and put the constraints in the bid, so the GC can build them into the schedule.

Outside the core, Roseville, Folsom, Elk Grove and Davis carry no mobilization premium. Stockton and Modesto are bid without a separate mobilization line too, with the I-5 and Highway 99 traffic patterns built into the work day.

What we delivered at the State Controller’s Office

The State Controller’s Office project in Sacramento was a tenant improvement on a working state agency floor. Our scope was network cabling to the new workstation layout, buildout of the IT network room, and surveillance. Staff kept working on the floor during the project. So we phased the work by area, coordinated it with the GC’s ceiling and finish schedule, and stayed clear of the agency’s live network until cutover.

The project shows what a state TI delivers at the end:

  • Submittals that mark the electrician’s scope for rack power and room bonding
  • Labeling that matches the agency’s scheme
  • Permanent link test results delivered at closeout
  • A network room the agency’s IT group could walk into and operate

Our government and public works market page covers our broader approach to agency work, including DIR registration and NDAA equipment documentation.

Sacramento region counties and cities

CountyCities we cover
SacramentoSacramento, Elk Grove, Folsom, Rancho Cordova, Citrus Heights, Galt
PlacerRoseville, Rocklin, Lincoln, Auburn
El DoradoEl Dorado Hills, Placerville, Cameron Park
YoloDavis, Woodland, West Sacramento
Solano, eastern sideVacaville, Fairfield, Dixon
San JoaquinStockton, Lodi, Tracy, Manteca
StanislausModesto, Turlock

You’ll see Solano County on this page and on the Bay Area page, because the county is split between the two. We bid Vacaville, Fairfield and Dixon as part of this region, and Vallejo and Benicia as Bay Area work.

The services we’re asked for most often here are structured cabling, network room buildout, security camera systems and access control, usually bundled into a single Division 27 and 28 scope.

Next step

Send the drawings, the Division 27 and 28 spec sections and the bid date through the request a bid page or by email to carson@telelinkca.com. If the project is in a state-owned or state-leased building, please include the tenant agency’s IT standard too. We don’t price a site walk in this region as a trip. Our bid will name the jurisdiction and permit path for that address and the county DIR determination we priced the labor against. It’ll also show the DGS badging and freight elevator lead time on the schedule, and the closeout deliverables the agency IT group will receive. If you’re a general contractor building a bid list, the for general contractors page explains what’s in our prequalification packet and how we divide scope with the electrician and the door hardware supplier.

Counties and cities we cover in this region

Counties: Sacramento, Placer, El Dorado, Yolo, Solano, San Joaquin, Stanislaus.

Cities include: Sacramento, Roseville, Rocklin, Elk Grove, Folsom, Rancho Cordova, Davis, Woodland, West Sacramento, Vacaville, Stockton, Modesto. We take commercial and institutional work in each of these cities. A city on this list is a place we work, not an office location.

FAQ

Questions about working in Sacramento & Central Valley

Who pulls the low voltage permit on a Sacramento project?

It depends on the jurisdiction and how the project is permitted. On most commercial jobs, our scope is inspected under the GC's building permit or the electrical contractor's permit. If the city or county wants a separate permit for the low voltage scope, we pull it under CSLB #472017 and note that in the scope letter.

Link to this answer
Can you work on a state office floor while the agency is still using it?

Yes. We did the State Controller's Office tenant improvement with staff on the floor. We phase the work by area and arrange badging and freight elevator windows through the building manager. The agency's live network isn't touched until cutover.

Link to this answer
Is a state agency tenant improvement prevailing wage work?

State and other public agency projects are public works, so prevailing wage applies under the Labor Code. We price to the DIR determination for the county and submit certified payroll electronically.

Link to this answer
Do you cover Stockton and Modesto?

Yes. San Joaquin and Stanislaus counties are part of this region, so we bid them without a separate mobilization line. We plan around I-5 and Highway 99 traffic in the work day.

Link to this answer
Which side of Solano County do you treat as Sacramento?

We bid Vacaville, Fairfield and Dixon as part of the Sacramento region. Vallejo and Benicia are on our Bay Area page, because the traffic, labor market and building departments there work more like the Bay Area.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Have a project in Sacramento & Central Valley? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.