- Owners and asset managers
- GCs on HUD and LIHTC rehabs
- Property management companies
- Housing authorities and nonprofit developers
- Property-wide Wi-Fi
- CATV and MDU distribution
- Video surveillance
- Access control and video intercom entry
- NDAA Section 889 / 2 CFR 200.216 on federally funded work
- Davis-Bacon labor standards where the HUD program triggers them
- Resident notification and occupied-unit phasing
- Uniform Relocation Act notices when a unit must be vacated
| Typical scope | Wi-Fi, CATV, cameras, intercom and entry |
|---|---|
| Phasing | Unit by unit, stack by stack, residents in place |
| Camera sourcing | NDAA compliant, manufacturer documented |
| Entry platforms | ButterflyMX, DoorKing (DKS) |
| Projects | Little Tokyo Towers, Horton House |
| License | CSLB #472017, C-7 Low Voltage Systems |
How an occupied multifamily rehab changes the low voltage work
On new construction the building is empty, the walls are open, and the cabling crew follows the framer. An occupied multifamily rehab is different. People live in the building, the walls are closed, and the risers are usually the only way to get cable between floors. Every unit visit has to be scheduled and agreed on by the resident, the property manager and the general contractor. We use the same materials as on new construction, but the sequence, the working hours and the paperwork all change.
It changes the design as well as the schedule. For example:
- A property-wide Wi-Fi layout for an occupied concrete high-rise has to start from the riser closets the building already has, not from an ideal closet layout.
- A camera layout starts with the corridors, stairs, parking and entries where the owner already has problems.
- A new entry system replaces a panel residents use every day, so we cut it over in one visit and keep the old system working until the new one is live.
Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We’ve done the low voltage scope on occupied rehabs in Los Angeles and San Diego, and what follows comes from those two projects.
Who buys low voltage on a multifamily rehab
It’s rarely one person. On an affordable housing rehab, three parties working from the same drawings usually decide the low voltage package together:
- The owner or asset manager wants a property-wide Wi-Fi amenity, cameras that work and an entry system that cuts down on tailgating. They answer to a lender, a housing authority or a HUD field office.
- The general contractor’s estimator carries Division 27 and Division 28 on the bid list, and the superintendent has to fit unit visits around abatement, kitchens, bathrooms and window replacement.
- The property management company’s staff send the notices, hold the keys, answer resident questions and run the systems after turnover.
We write our bids so all three can follow them. We list the scope by system and by location, count the unit visits, and show on the first page which parts are ours and which belong to the electrician and the door hardware supplier.
Systems that show up on nearly every affordable housing scope
Most multifamily and affordable housing rehabs in California include the same four systems, and we self-perform all four.
Property-wide Wi-Fi. Owners are moving away from resident-paid internet toward a managed network that covers every unit and common area. In a concrete or masonry building, that usually means an access point in or near every unit instead of one per floor, because concrete and masonry structural walls block the signal. We design from a survey of the building as it stands today. Then we pull Cat6 or Cat6A to each AP location and install managed wireless on Cisco Meraki or whatever platform your IT consultant specified.
CATV and MDU distribution. In older buildings the existing coax is often a patchwork of splitters, amplifiers and outlets added over decades. A rehab is a good time to replace it with a documented MDU distribution system the video provider will accept. That means a headend, riser trunks, floor taps and a dedicated drop to each unit, all installed to California Electrical Code Article 820.
Video surveillance. We put cameras in lobbies, corridors, elevators, stairwells, parking, trash rooms and at every exterior door. They record to a network video recorder or a cloud platform, and property staff can view them.
Access control and entry. This covers ButterflyMX video intercom panels, DoorKing telephone entry and vehicle gate access, card or fob readers at common doors, and package room integration. We install and configure all of it. Door strikes, maglocks and closers are coordinated with the GC’s Division 08 hardware scope or performed by a licensed C-28 contractor.
Compliance rules when federal money is in the capital stack
The funding sources in the deal decide which rules apply to the low voltage package. Three of them come up on nearly every HUD or LIHTC rehab.
NDAA Section 889 and 2 CFR 200.216. Section 889 bars federal agencies from buying covered video surveillance and telecommunications equipment from Huawei, ZTE, Hytera, Hikvision, Dahua and their affiliates. By itself, that wouldn’t affect a private owner. But 2 CFR 200.216 extends the prohibition to federal grant and loan funds, and that’s how it reaches HUD-assisted housing. The catch is that many low-cost camera brands are relabeled Hikvision or Dahua hardware, so you have to specify and document the actual manufacturer. We submit the manufacturer and model for every camera, recorder, switch and access point. We use compliant lines commonly specified for this work, such as Axis, Hanwha Vision, Avigilon, Cisco Meraki MV and Ubiquiti UniFi Protect, install to the named line and verify each model. Our NDAA camera guide goes into more detail.
Davis-Bacon and prevailing wage. HUD programs carry federal labor standards when the program and the unit count trigger them. Examples include CDBG, project-based Section 8, Section 202 and public housing modernization, along with HOME Investment Partnerships funds passed through a city or county above the program’s unit threshold. Tax credits alone don’t trigger Davis-Bacon. However, state or local soft money in the same deal can trigger California prevailing wage under Labor Code 1720 et seq. Your counsel or lender makes that call, and we ask for it in writing before we price. We produce weekly certified payrolls in the format the labor standards officer requires.
Resident notice and relocation. California Civil Code 1954 sets the notice a landlord must give before entering a unit for improvements, with 24 hours in writing as the presumptive minimum. On HUD-assisted projects, Uniform Relocation Act rules apply as soon as a resident is asked to leave a unit, even temporarily. Low voltage work almost never needs a vacant unit, and that’s one reason owners like to run it ahead of the heavier trades. HUD Section 3 labor hour reporting may also apply. Your compliance coordinator sets the format, and we fill it out.
How we phase and coordinate work around residents
On an occupied building, the available pathways set the order of work. We start with the risers, because everything else depends on them. Next come the network rooms and headend, then the floors one stack at a time, then the common areas and exterior. Cutover and training come last.
Risers and pathways. We survey the riser closets before we price, because a closet drawn as a clean sleeve is often packed with abandoned cable. We remove abandoned cable where the specification calls for it and firestop each penetration we open. We also pull the backbone fiber and coax trunks during that same visit, to limit trips into each closet.
Unit visits. Each unit gets one scheduled visit for Wi-Fi, coax and data, and sometimes a short second visit for cutover. The property manager posts a floor schedule and a runner knocks ahead of the crew. No crew member enters an occupied unit alone. We clean up each unit before we go, with outlets labeled per TIA-606 and photographed.
Common areas and cutover. Corridor and lobby work happens during posted daytime hours. We install cameras and entry panels alongside the live systems and then cut them over, to keep the entry system in service during the changeover. Wi-Fi goes live floor by floor. Property staff get hands-on training plus written instructions for the camera client, the entry platform and the wireless dashboard.
Our occupied building guide walks through this sequence step by step, with the paperwork included.
Occupied-building checklist for your bid package
| Item | Why it matters on an occupied rehab | Who owns it |
|---|---|---|
| Funding sources and labor standards determination | Decides Davis-Bacon, prevailing wage and NDAA obligations | Owner, counsel |
| Riser and closet survey with photos | Without it, the pricing is often off | Telelink |
| Resident notice template and lead time | Sets the earliest unit visit date | Property management |
| Unit visit schedule by stack | Lets the GC sequence other trades | Telelink, GC |
| Manufacturer and model list for cameras and network gear | Required for the NDAA compliance file | Telelink |
| Electrical handoff points (rack circuits, TR bonding) | Electrician scope, shown on our submittal | Telelink, electrician |
| Door hardware schedule | Access control integration depends on it | GC, Division 08 |
| Existing video provider contact | Coordinates the CATV cutover | Owner |
| Closeout: test results, as-builts, labeling schedule, training | Turnover to property staff | Telelink |
Occupied rehab projects: Little Tokyo Towers and Horton House
At Little Tokyo Towers in Los Angeles, an occupied multifamily renovation, we installed property-wide Wi-Fi, CATV distribution, surveillance cameras and access control while residents lived in the building. At Horton House in San Diego, an occupied senior housing renovation, we installed the same four systems plus a nurse call system. That meant planning the phasing around care schedules and vulnerable residents as well. Both case studies describe the scope as we actually performed it.
Next step
If you can share the drawings, the funding summary and the resident notice lead time through request a bid, we’ll send back a scoped bid with the unit visits counted and the electrical and door hardware scope boundaries marked. General contractors carrying Division 27 and 28 can see how we work inside your schedule on the general contractor page.