CSLB #472017, C-7 Low Voltage Systems

Service

Commercial Wi-Fi Design and Installation for Buildings and Campuses

You need a wireless network designed to cover the units, classrooms or desks it's supposed to serve. We survey before anything is purchased, cable each access point on Cat6A, power it from switches with the budget to run it, and set it up on a console your staff can use. We do this for owners, property managers, campus IT staff and general contractors.

License
CSLB #472017
Installed by
Our own technicians
Service area
All of California

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor Wireless coverage heat map drawn over a building floor plan
Equipment we install for this system
  • Cisco Meraki
  • Ubiquiti UniFi

We aren't tied to any brand. If your drawings call for something else, we'll install to the specification.

What a commercial Wi-Fi installation includes

Getting Wi-Fi to work across a whole building or a whole campus starts with design, and the installation comes after. The access points are the part you see. Behind them is a survey that puts them in the right places, a Cat6A drop and a PoE switch port for each one, a switching and management platform that keeps them configured, and documentation that lets IT staff maintain the network after we leave.

We handle all of it: predictive design, on-site validation, cabling, mounting, switch and PoE provisioning, configuration and closeout. Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. The wireless scope is usually bid under Division 27 21 33 alongside our structured cabling scope. We estimate the two together so the AP count and the drop count agree.

Predictive design and on-site validation surveys

A predictive survey starts with the floor plans. We model the walls, the floor construction, the glass and the metal in the building, place candidate access point locations, and simulate coverage and channel overlap at the signal levels the owner’s applications need. Voice over Wi-Fi and video need stronger, more consistent signal than email does. In a senior housing corridor with resident devices on the network, coverage has to reach into every unit, not just the hall. The predictive model gives you an AP count, a placement drawing and a channel plan before anything is ordered.

An on-site survey checks the model against the building. We walk the floors with a test AP mounted where the drawing puts it and measure real signal levels through the real walls. A plan set doesn’t always show the plaster and wire lath in an older tower or the foil-faced insulation in a warehouse roof. On renovations, we also survey the existing wireless environment for interference from neighboring networks and from other equipment in the building.

After installation, a validation survey checks the finished network against the design targets, and the survey report goes in the closeout package. On a design-bid-build job, the engineer’s drawings often specify a validation survey and a pass criterion, and we test to it.

Access point placement, mounting and cabling

AP placement follows the survey, but it also has to work with the ceiling you have. In a lay-in ceiling, we mount APs on the grid with a listed bracket, or below the grid on a tile bridge, with the Cat6A drop coiled above. In a hard-lid ceiling, we set a box and a pathway during rough-in. In corridors with exposed structure, we mount to a bracket on a beam or a conduit drop and run the cable neatly in tray or on J-hooks, since it’ll be visible. Outdoor APs in courtyards and parking areas get weather-rated mounts, outdoor rated cable, and surge protection at the building entrance.

Each AP gets one Cat6A drop from the nearest IDF, certified to the permanent link limits in ANSI/TIA-568.2-E and labeled to ANSI/TIA-606. Some AP models ship with a second Ethernet port for link aggregation or a redundant switch connection, and we pull a second drop where the design uses it. Wi-Fi 6E and Wi-Fi 7 APs commonly need a 2.5 Gb/s or faster uplink to deliver what the radio can carry, and Cat6A supports multigigabit Ethernet to the full 100 meters. That’s the main reason we specify Cat6A for AP drops even when the workstations in the building are on Cat6.

Wi-Fi 6, 6E and 7: what changes for your building

Wi-Fi 6 (IEEE 802.11ax) improved how an AP shares its airtime among many clients, which matters in classrooms, lobbies and open offices. Wi-Fi 6E added the 6 GHz band. That band brings a large block of clean spectrum, but it doesn’t pass through walls as well as 5 GHz, so a 6E design often needs APs closer together or placed more carefully inside the rooms. Wi-Fi 7 (IEEE 802.11be) adds wider channels and lets a client use more than one band at once, and it raises the power and uplink demands on the AP.

For an owner, it comes down to three practical decisions. Choose the generation based on the devices that will be on the network in three to five years, not the ones there today. Plan the cabling and switching for the higher power and multigigabit uplinks the newer APs need, because the cable and the switch will usually outlast the AP. And plan AP density for the room count and the client count, letting the survey decide how many APs you buy rather than the generation label.

GenerationStandardBandsWhat it means for the installation
Wi-Fi 6802.11ax2.4 and 5 GHz802.3at PoE, 1 Gb/s uplink usually enough
Wi-Fi 6E802.11axAdds 6 GHzCloser AP spacing, 2.5 Gb/s uplinks, often 802.3bt
Wi-Fi 7802.11be2.4, 5 and 6 GHzMultigigabit uplinks, 802.3bt, Cat6A recommended

Property-wide Wi-Fi in multifamily and senior housing

Property-wide Wi-Fi in an occupied multifamily or senior housing building is a different job from an office. The owner is providing internet to every unit, either as a building amenity or under a bulk service agreement. The building is full of residents while the work happens, and the construction may be plaster, concrete or masonry that soaks up signal.

We design these networks with the unit as the coverage target. Depending on the construction, that means an AP in each unit, an AP in each corridor serving the units on both sides, or a wall-plate AP that also provides wired ports in the unit. Each unit or resident typically gets its own network credential, so devices in one unit don’t see devices in another. Staff and building systems run on networks separate from the residents’, and camera, intercom and access control systems get their own VLANs.

Two of our multifamily projects included property-wide Wi-Fi. At Little Tokyo Towers in Los Angeles, the Wi-Fi went in as part of a renovation of an occupied high-rise, alongside CATV distribution, cameras and access control. At Horton House in San Diego, a senior housing renovation, the wireless network was installed with CATV, surveillance, access control and a nurse call system while residents stayed in place. On both jobs, the schedule was built around unit access: residents got notice in advance, and the work in each unit was planned as a single visit that left the unit clean and usable. Our multifamily and affordable housing page explains how these projects are phased and what federally funded owners need documented.

High-density campus and office environments

Campus buildings, lecture halls and conference centers put many clients in one room, so the design goal shifts from coverage to capacity. We plan smaller cells with lower transmit power, more APs per room, and a channel plan that keeps neighboring APs off the same channel. Education work also comes with its own guidance. TIA-4966 addresses telecommunications infrastructure for educational facilities, and many district and university standards set one AP per classroom as the baseline.

On the Touro University campus building renovation in Vallejo, wireless was part of a scope that also included network cabling, IT room buildout and the fiber backbone, so the APs landed on cabling and switching built to carry them. In offices, density becomes an issue on open-plan floors and in all-hands rooms, and the approach is the same: design for the peak count in the room rather than the average. Guest, staff and device networks are separated by SSID and VLAN, and the guest network is isolated from everything else.

PoE budgets, switching and cloud management

Every AP is a PoE load, and the switch that powers it has a finite budget. A Wi-Fi 6 AP typically runs on 802.3at (up to 30 W at the port). Many Wi-Fi 6E and Wi-Fi 7 APs need 802.3bt for full operation. We count the APs per IDF, add the cameras, phones and other powered devices on the same switches, and size the switch PoE budget with margin. If the total exceeds the budget, you need a higher-budget switch or a second switch. We say so in the proposal instead of letting APs drop radios at peak load. Power for the switches themselves, on dedicated circuits, is the electrician’s scope.

We install and configure Cisco Meraki MR access points and the Meraki dashboard for cloud management, along with Meraki MS switches where the project uses them. With cloud management, your IT staff or a managed service provider can see every AP, push configuration changes and firmware from one console, and track client health without visiting the building. Ubiquiti UniFi is commonly specified on multifamily and smaller commercial projects, and we install and configure it to the specification. On either platform, we turn the management credentials over to the owner, document the SSIDs, VLANs and RF settings, and provide the validation survey and the as-built AP placement drawing. The switches and the rooms they live in are covered under our network room buildout service.

Next step

Send us floor plans, a description of the building construction and the number of units or occupants through request a bid. The wireless section of your Division 27 spec works too. We’ll send back an AP count, a cabling count and a switching plan with the PoE budget worked out. General contractors can find our bid and coordination process on the for general contractors page.

FAQ

Questions about wireless networks & wi-fi

Do you do a site survey before quoting access points?

Yes. A predictive survey from the floor plans gives us the AP count and placement for the proposal. For buildings with heavy construction or an existing wireless environment, we add an on-site survey with a test AP before the design is final. After installation, a validation survey checks the network against the design targets.

Link to this answer
Should we buy Wi-Fi 6, 6E or 7 access points?

Base the choice on the devices that will be on the network in three to five years, and on the cabling and switching you're willing to install. Wi-Fi 6E and 7 need multigigabit uplinks and often 802.3bt power. If the cabling is Cat6A and the switches have the budget, the newer generation is a reasonable buy. If not, you're better off spending the money on the cabling first.

Link to this answer
How do you provide Wi-Fi to every apartment in an occupied building?

We treat each unit as the coverage target. Depending on the construction, that means an AP in each unit, a corridor AP serving units on both sides, or a wall-plate AP with wired ports in the unit. Each unit gets its own credential so devices in one unit don't see another, and staff and building systems run on separate networks. Work in units is scheduled and noticed through property management.

Link to this answer
Can you install Cisco Meraki access points?

Yes. We install and configure Cisco Meraki MR access points and the Meraki dashboard, along with MS switches where the project uses them. We also install Ubiquiti UniFi where it's specified, which is common on multifamily and smaller commercial projects. We install and configure to the specification, and we set up the dashboard organization and licensing in the owner's name so they stay with the building.

Link to this answer
How much PoE do the access points need?

A Wi-Fi 6 AP typically runs on 802.3at, up to 30 W at the port. Many Wi-Fi 6E and Wi-Fi 7 APs need 802.3bt for full operation. We count every powered device per switch, including cameras and phones, and size the PoE budget with margin so APs have the power they need at peak load.

Link to this answer
Who manages the network after you leave?

You do, or your IT provider does. We turn over the management credentials, document the SSIDs, VLANs and RF settings, and give you the AP placement drawing and validation survey. With cloud management, your staff can see and change the network without visiting the building. If you want ongoing help, it's available under our service and maintenance work.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid

Reviews

What clients have said

Here are a few excerpts from reviews our clients have left for us on Google.

  • These guys handled my phone and phone system move along with wire our new office from top to bottom. When all others failed, such as AT&T, Telelink was there to pick up the pieces. Most important out of all the great things I could say, they took all my calls and emails, no matter what time of day or night, even on the weekend and holidays. They know what they are doing and get it done right the first time.

    U.S. Certified SignersOffice move: phone system relocation and a full office cabling installation
  • I had an issue with my cameras and called for help. He was able to get me on the schedule within the week. They came out, diagnosed the problem, and fixed everything within a couple hours. Very professional, affordable, and fast.

    Evan KorisService call on an existing camera system
  • After switching telephone and internet from ATT to Comcast, I needed to have some phone and data lines moved. I called Telelink and immediately received a professional response. An appointment was efficiently scheduled to coordinate with Comcast. The technicians were friendly, capable, and extremely helpful in working through some glitches. After the service, I received an invoice which was honest and very reasonable.

    Glick OfficeMoves and changes on phone and data lines, coordinated with the carrier

Each review appears as the client wrote it. Where we shortened one, you'll see an ellipsis. Have we worked for you? Tell us how it went.

TelelinkBusiness Services, home

Planning a wireless networks & wi-fi project? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.