CSLB #472017, C-7 Low Voltage Systems

Company

About Telelink Business Services

Telelink Business Services is a California low voltage contractor, and we've been wiring the state's commercial buildings since 1983. We're a family business, now in our second generation, and our own technicians still do the work. Here's where we came from, our license and what we install.

Updated
September 13, 2026

No obligation. If the work is outside our license, we'll tell you.

At a glance
Founded1983 in Sacramento, California
LicenseCSLB #472017, C-7 Low Voltage Systems
OwnershipFamily owned, second generation
FocusCommercial and institutional buildings, statewide
CrewsOur own technicians, no labor brokers

Telelink Business Services opened in Sacramento in 1983 installing business telephone systems. That’s where the name comes from. We started out running phone lines and key systems for offices around the Capitol. Over the years the work grew into voice and data cabling, then structured cabling and fiber, and then cameras, access control, intercom, Wi-Fi, television distribution and nurse call, all on the same cabling plant and the same network.

We’re a family business, now in our second generation. Carson Cody runs the company day to day. He reviews the bids, manages the projects, works with the general contractors and our field crews, and closes out the jobs.

License and public record

Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. Our classification, status, bond and workers’ compensation coverage are all public record, and you’re welcome to check them at cslb.ca.gov before you award anything.

What we do today

We install and service the systems that run on a building’s low voltage cabling: structured copper and fiber cabling, network room and IDF buildout, wireless networks, IP video surveillance, access control, video intercom and entry systems, CATV and MDU distribution, business phone systems, audio visual and nurse call. You’ll find the full list on our services page.

Our own technicians install those systems. We don’t broker the work out to a labor supplier. The people who show up on your site work for Telelink and report to the person who bid your project, and they’re usually the same people who write up the closeout documentation.

These are the platforms our clients ask for most:

  • Cisco Meraki for switching, wireless, security appliances and cameras.
  • Yealink phones with hosted VoIP.
  • ButterflyMX video intercom and smart access for multifamily.
  • DoorKing telephone entry and gate access.

If your specification calls for something else, we’ll install to the spec. We don’t hold dealer or partner agreements with any manufacturer.

Three parts of a typical job belong to other trades, and our bids spell them out:

  • Burglar and intrusion alarm and alarm monitoring, which run under a BSIS Alarm Company Operator license held by a licensed alarm company.
  • Electrified door hardware, provided under the GC’s Division 08 hardware scope or by a licensed C-28 contractor.
  • Line voltage, dedicated circuits and telecom room bonding, provided by the electrician.

We put all four in writing when we bid, so it’s settled before rough-in.

How we like to work

Most of our projects come to us as a Division 27 or 28 subcontract under a general contractor. On those jobs you’ll get a bid with clear inclusions and exclusions, and submittals that show where our work meets the electrical and door hardware scopes. Our RFIs ask a specific question and propose an answer. Our coordination drawings are laid out to keep our pathways clear of the mechanical and electrical trades.

A lot of our work happens in buildings people are still using. Residents, staff and students are there while we work, so we give written notice before entering a unit, close up ceilings at the end of each shift, and plan cutovers to keep cameras and entry systems in service during the changeover. Our project case studies show what that looks like on real jobs.

At closeout, you’ll get test results for every copper link and fiber strand, as-built drawings with the labeling scheme, an equipment list with manufacturer and model, and configuration exports for anything we commissioned. We label cables, ports and racks to match the as-builts, so the next technician can trace a run from the labels.

Where we work

We take commercial and institutional projects across California, in four regions: Sacramento and the Central Valley, the Bay Area, Los Angeles and Southern California and San Diego. Jobs we’ve completed include the State Controller’s Office in Sacramento, Touro University in Vallejo, Little Tokyo Towers in Los Angeles and Horton House in San Diego. Each region page covers the permitting, labor and access details we plan around there.

Next step

If you have a project with a cabling, security, wireless or phone scope, send the drawings through the request a bid page or email carson@telelinkca.com. General contractors can start with the for general contractors page to see what’s in our prequalification packet. If your project is still at the talking stage, give us a call at (916) 340-7503. Tell us about the building and we’ll walk you through what the low voltage scope looks like.

Platforms

Platforms we work with every week

These are the systems we install and configure most often, but we aren't tied to any of them. If your spec calls for something else, we'll install to the spec.

  • Cisco MerakiCloud-managed switching, wireless, security appliances and cameras
  • YealinkIP desk phones, cordless and conference phones for hosted VoIP
  • ButterflyMXVideo intercom and smart access for multifamily and senior housing
  • DoorKingTelephone entry, gate and vehicular access control

FAQ

Questions we get asked

Do you work across California?

We do. We take commercial and institutional projects all across California, and we've completed buildings in Sacramento, Vallejo, Los Angeles and San Diego.

Link to this answer
What kinds of buildings do you work in?

Commercial and institutional buildings, for general contractors, building owners, property managers, public agencies, schools and IT departments. We treat multifamily properties as commercial work: the client is the owner or the GC, and we plan the job around the residents.

Link to this answer
Do you use your own crews or subcontract the labor?

Our own technicians install the systems listed on our services page. We don't use brokered labor. If a job needs electrified door hardware or line voltage work, that belongs to the C-28 or C-10 contractor, and our drawings show where our work ends and theirs begins.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid

Reviews

What clients have said

Here are a few excerpts from reviews our clients have left for us on Google.

  • These guys handled my phone and phone system move along with wire our new office from top to bottom. When all others failed, such as AT&T, Telelink was there to pick up the pieces. Most important out of all the great things I could say, they took all my calls and emails, no matter what time of day or night, even on the weekend and holidays. They know what they are doing and get it done right the first time.

    U.S. Certified SignersOffice move: phone system relocation and a full office cabling installation
  • I had an issue with my cameras and called for help. He was able to get me on the schedule within the week. They came out, diagnosed the problem, and fixed everything within a couple hours. Very professional, affordable, and fast.

    Evan KorisService call on an existing camera system
  • After switching telephone and internet from ATT to Comcast, I needed to have some phone and data lines moved. I called Telelink and immediately received a professional response. An appointment was efficiently scheduled to coordinate with Comcast. The technicians were friendly, capable, and extremely helpful in working through some glitches. After the service, I received an invoice which was honest and very reasonable.

    Glick OfficeMoves and changes on phone and data lines, coordinated with the carrier

Each review appears as the client wrote it. Where we shortened one, you'll see an ellipsis. Have we worked for you? Tell us how it went.

TelelinkBusiness Services, home

Have a project coming up? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.