CSLB #472017, C-7 Low Voltage Systems

Market

Low Voltage Contractor for Healthcare and Clinics

We install clinical low voltage systems for clinic and medical group facilities managers, medical office building owners, dental and specialty practice owners, skilled nursing operators, and the general contractors building out their space. Nurse call, clinical cabling, Wi-Fi, cameras and access control are installed to the facility's infection control requirements, placed with patient privacy in mind and documented for the authority that has jurisdiction.

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor Bright hospital hallway with large windows
Who we work with
  • Clinic and medical group facilities managers
  • Medical office building owners and property managers
  • Dental and specialty practice owners
  • Skilled nursing operators
  • GCs on healthcare tenant improvements
Typical systems
  • Nurse call and staff emergency call
  • Cabling for imaging, EHR and clinical workstations
  • Clinical and guest Wi-Fi
  • Cameras at entries, lobbies and medication storage
  • Access control for after-hours and controlled substances
  • Business phone systems
Rules and standards that apply here
  • UL 1069 listed nurse call in licensed healthcare
  • HIPAA-informed camera placement and network segmentation
  • Infection control risk assessment (ICRA) class set by the facility
  • HCAI (formerly OSHPD) jurisdiction on hospital and skilled nursing buildings
  • Local building department jurisdiction on freestanding clinics
At a glance
Typical scopeNurse call, cabling, Wi-Fi, cameras, access control
Nurse callUL 1069 listed where the facility is licensed
JurisdictionHCAI for hospital and SNF buildings, local for clinics
Infection controlWork performed to the facility's assigned ICRA class
NetworkSegmented VLANs: clinical, cameras, guest
LicenseCSLB #472017, C-7 Low Voltage Systems

What healthcare adds to a tenant improvement scope

On the schedule, a clinic tenant improvement looks a lot like an office TI. What’s different is who’s in the space: patients, and some of them have suppressed immune systems. The records on the desks are protected by federal privacy law, the medication room holds controlled substances, and the nurse call button is how a patient calls staff from the exam or treatment room. Infection prevention staff can stop work that doesn’t follow the assigned ICRA class.

That changes four things:

  • Infection control sets how ceilings get opened and carts get cleaned.
  • Patient privacy decides where cameras point and how the network is divided.
  • Licensing determines whether the nurse call system must be UL 1069 listed and which authority reviews the drawings.
  • The operating day controls when work can happen. A clinic with a full schedule can’t give up an exam room for a cable pull at ten in the morning.

Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We offer nurse call, clinical cabling, wireless, cameras and access control for healthcare occupancies across California. Our work in occupied senior housing, including the nurse call conversion at Horton House in San Diego, follows the same careful approach to containment and phasing.

Who buys low voltage in healthcare

  • Outpatient clinics and medical groups. The facilities manager or practice administrator buys, usually alongside an IT director or managed service provider who owns the electronic health record system and sets the network standard. Freestanding clinics are generally under the local building department.
  • Medical office building owners. The owner or property manager buys the building-level systems: entry, lobby and parking cameras, riser cabling and after-hours access. Each practice then fits out its own suite.
  • Dental and specialty practices. The owner buys directly, often with a dental or medical equipment supplier whose rough-in drawings set the drop locations.
  • Skilled nursing operators. The facilities director buys, often with a healthcare architect. The building is generally under the Department of Health Care Access and Information (HCAI, formerly OSHPD) rather than the city.
  • General contractors. If you’re the GC carrying Division 27 and 28 on a healthcare tenant improvement, you’re buying the subcontracted scope. You want a subcontractor that understands the review authority, the infection control requirement and the closeout paperwork before the bid goes in.

Nurse call and staff emergency call in licensed settings

In a licensed skilled nursing facility, the nurse call system is generally a UL 1069 listed system. That means a bedside station at every bed, a pull cord in every patient bathroom and shower, a dome light over each room door, and annunciation at the nurse station, on wireless phones or on mobile devices. The wiring is supervised, so a fault reports at the head end. The system is on the drawings the plan review authority approved, and the inspector checks it against them.

Outpatient clinics are different. There the requirement usually comes from the operator’s own standard rather than a licensing rule. Emergency call buttons in exam rooms and restrooms let a patient or staff member call for help, and duress buttons at reception and in interview rooms are a common part of a clinic’s security plan. The buttons, cameras and controlled entry that support that plan are all within our scope.

We install to the listing and the specification, integrate with the phone system where the design calls for it, test every station end to end, and hand over the test log. Rauland and Cornell are both commonly named in healthcare specifications, and we install to whichever line is named. Nurse call, cameras and access control are ours.

Cabling for imaging, EHR workstations and clinical Wi-Fi

Clinical cabling means a lot of outlets, and the equipment decides where they go. An exam room needs a data drop for the workstation, one for the phone, and often one for a wall-mounted display or telehealth camera. A nurse station needs a bank of drops, plus the printer and the label printer. Imaging rooms need dedicated drops for the modality and its console. In a shielded MRI room, every cable has to enter through the shield vendor’s waveguide, with the shield contractor present. Dental operatories need drops for the chairside display, the intraoral camera and the digital sensor, placed to the equipment supplier’s rough-in drawings before the cabinetry goes in.

We install and certify network cabling to ANSI/TIA-568.2-E, using plenum-rated cable where the ceiling is a return air plenum. We label to TIA-606 so the practice’s IT provider can trace the drops. On new clinical work we generally recommend Cat6A to workstations and access points, and our Cat6 vs Cat6A guide explains why.

Clinical Wi-Fi carries workstations on wheels, tablets, wireless phones and, in some settings, medical devices. The design starts with a site survey that accounts for lead-lined imaging rooms and other walls that block signal. It also puts clinical devices, staff, guest and camera traffic on separate networks. We install and configure the wireless on Cisco Meraki or whatever platform your IT provider has standardized on.

Camera placement, network segmentation and HIPAA

HIPAA doesn’t tell you where to put a camera. It requires a covered entity to safeguard protected health information, control physical access to the places where it’s kept, and document a risk analysis. Your privacy officer and IT provider turn that into rules, and those rules look much the same from one practice to the next:

  • Cameras cover entries, lobbies, corridors, parking, the medication room door and the server closet door. They don’t cover exam rooms, treatment rooms, changing areas or restrooms.
  • No camera view includes a monitor, a fax tray or a counter where patient records are visible. We confirm each view with the privacy officer before final aim.
  • Recorded video that identifies patients is treated as sensitive. The recorder sits on its own network segment, every user gets an individual account, and exports are logged.
  • The camera network, the clinical network, the building systems and guest Wi-Fi sit on separate VLANs with firewall rules between them. That segmentation is network engineering, and it belongs to the practice’s IT provider or network team. Our part is physical: separate patch fields, distinct cable colors and documented pathways that the provider builds the boundary on.

Access control works the same way. Controlled substances belong in a locked, limited-access space, and an access control reader with an audit log on the medication room door tells you who opened it and when. After-hours entry for cleaning crews, on-call staff and the property manager runs on schedules and credentials that can be revoked in minutes. That’s one reason cloud-managed platforms are common in multi-site medical groups, and our cloud vs on-premise guide covers the tradeoff. We coordinate electrified door hardware with the GC’s Division 08 scope or a licensed C-28 contractor. Egress on patient corridors follows the life-safety requirements on the approved drawings.

Infection control and jurisdiction: ICRA, HCAI and local permits

Infection control risk assessment. Work in an occupied clinical building falls under an infection control risk assessment. The facility’s infection prevention staff assign a risk class based on the work being done and the patients near it, and that class sets the containment and cleanup we work under. It also affects the schedule and the labor, so it belongs in the bid instead of a change order. We ask for the assigned class before we price, and we work to the facility’s requirements for it.

Jurisdiction. Which authority reviews the drawings depends on the building rather than the scope. That affects every trade, because submittals, inspections, change documentation and closeout all follow that authority’s process.

Building typeAuthorityWhat it means for the submittal and inspection
Hospital buildings and skilled nursing facilitiesDepartment of Health Care Access and Information, formerly OSHPDHCAI reviews the drawings, issues the permit and inspects the work in place of the city
Freestanding outpatient clinicsLocal building departmentCity or county plan check, permit and inspection
Medical office buildings and dental practicesLocal building departmentCity or county plan check, permit and inspection, plus the landlord’s own rules

Your architect confirms which one applies at the start, and we build our submittal package to match.

Operating hours. We schedule ceiling work in occupied clinical areas before the first appointment, after the last one, or in rooms the practice has blocked off for the day. Phone, nurse call and network cutovers usually happen after hours with the IT provider on the line.

Next step

Request a bid and send along the drawings, the ICRA class if one’s been assigned, your IT provider’s network standard and the operating hours. We’ll come back with a bid that spells out the containment, the jurisdiction, and the split between our work and the door hardware scope. If you’re a general contractor building out clinical space, our general contractor page shows how we fit into your submittal and inspection process.

FAQ

Questions about healthcare & clinics projects

Does HIPAA prohibit security cameras in a medical office?

No. HIPAA requires covered entities to safeguard patient information, and cameras are a common part of a facility security plan. In practice, your privacy officer will set a few rules: no cameras in exam, treatment or changing rooms, no views of screens or paperwork that show patient information, and limited, logged access to recorded video. We place the cameras and set up the recorder to follow those rules.

Link to this answer
Is our clinic project reviewed by HCAI or the city?

Freestanding outpatient clinics are generally reviewed and inspected by the local building department. Hospital buildings and skilled nursing facilities fall under the jurisdiction of the Department of Health Care Access and Information, formerly OSHPD. Your architect confirms which one applies at the start, and the answer changes the submittal and inspection process for every trade.

Link to this answer
What does an ICRA class mean for a cabling crew?

The facility's infection prevention staff assign a risk class based on what the work disturbs and who's nearby. That class decides the containment and cleanup required. A higher class means more containment, more time per opening and often restricted hours, and all of that changes the labor. We ask for the assigned class before we price, so it's already in the bid.

Link to this answer
Can you cable an imaging room or a dental operatory?

Yes. Imaging rooms need dedicated drops for the modality and its workstation, and in a shielded MRI room every penetration has to pass through the shield vendor's waveguide. Dental operatories need drops for the chairside display, intraoral camera and digital sensor. We coordinate those with the dental equipment supplier's rough-in drawings before the cabinetry is set.

Link to this answer
Do you provide nurse call for skilled nursing facilities?

Yes. In licensed skilled nursing, the system is generally a UL 1069 listed nurse call with bedside stations, bathroom pull cords, corridor dome lights, and annunciation at the staff station or on wireless phones. We install to the listing and the specification, test every station, and include the test log in the closeout package.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Planning a healthcare & clinics project? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.