Cal/OSHA IIPP and site-specific safety plans
Every California employer is required to maintain a written Injury and Illness Prevention Program under Title 8, section 3203 of the California Code of Regulations. Ours names the person responsible for the program. It describes how we identify and correct hazards, how we train employees, how we investigate incidents, and how safety communication runs between the office and the field. A copy is furnished in the prequalification packet.
A low voltage crew works on the GC’s site under the GC’s safety program, and our plan is written that way. For each project, we prepare a short site-specific plan. It lists the scopes we’ll perform, the hazards those scopes create in that building, the controls and PPE required, the emergency contacts, and the competent person named for any scope that requires one. We review it at the GC’s orientation and update it when the phase or the conditions change, and it sets the toolbox talk topics for the crew on that project. On public agency and campus projects, we adapt the plan to the owner’s badging, escort and after-hours rules.
Ladders, lifts and working in occupied buildings
Most of our work is above the ceiling, and falls from ladders are the main fall hazard in our scope. Our crews use the right ladder for the height, inspect it before use, and don’t work from the top two rungs. We use scissor and boom lifts where the height or duration calls for them. That work follows the Cal/OSHA requirements for operator training and evaluation, fall protection where the equipment calls for it, and inspection before the shift. In an occupied space, we barricade overhead work and put the ceiling tiles back at the end of the shift.
Many of our projects are in buildings with people in them: state agency floors, campuses, senior housing and clinics. We cordon off work areas with signage and don’t run cable across a corridor at floor level. Tools and material stay out of egress paths, and we schedule dusty or noisy work in the windows the owner allows. In senior housing and healthcare, residents and patients are notified before we work in their unit, and a member of the owner’s staff is involved when we enter. Our occupied building phasing guide covers the sequencing side.
Lockout, tagout, firestopping and plenum-rated materials
Line voltage work and energized electrical equipment belong to the electrical contractor. When our work needs power shut down, for example to land equipment in a telecom room, we schedule the shutdown with the GC, and the electrical contractor performs it under its own lockout and tagout procedure. Where the procedure requires it, our technicians apply their own locks and tags to the same isolation point, and no lock comes off until our people are clear. Our submittals show where our scope ends and the electrician’s begins.
We firestop every penetration we make through a fire-rated wall, floor or shaft with a listed system matched to the penetration, the rating and the cable type, and we record the system used. Sleeves are sized with room to redo the firestop when cable is added later. Where a ceiling space is a return air plenum, the cable is plenum rated (CMP), and non-plenum cable doesn’t go into a plenum no matter who furnished it. In vertical shafts, we use riser cable (CMR). These are California Electrical Code requirements, and they’re checked on inspection.
Prevailing wage, NDAA equipment, background checks and badging
On public works projects:
- We pay the prevailing wage for the classification and the county under Labor Code 1720 and following.
- Certified payroll records are submitted electronically to the Department of Industrial Relations.
- Apprenticeship requirements under Labor Code 1777.5 are followed.
- Public works bids are handled under Labor Code 1725.5, and DIR registration and current certificates go into the prequalification packet.
We close out the final certified payroll with retention.
On any project with federal funding, including HUD-assisted housing, NDAA Section 889 and 2 CFR 200.216 prohibit cameras and telecommunications equipment from Huawei, ZTE, Hytera, Hikvision, Dahua and their subsidiaries and affiliates. Many white-label camera brands are relabeled Hikvision or Dahua, so our submittals name the actual manufacturer of every camera, switch and access point. On a covered project, we specify and document the equipment against that list before it’s submitted, so the GC and the owner can check each manufacturer against it. Our NDAA camera guide covers how to specify it.
School districts, state agencies, courts and some housing owners require background checks, fingerprinting or badging before a technician enters the building. We hire technicians who can pass those checks, and we build the processing time into the schedule at kickoff. On state office floors, we follow the building manager’s badging and escort rules.
Records we keep and furnish on request
Everything above leaves a record: the IIPP, the site-specific plan and toolbox talk logs, lift inspections, firestop system records, certified payroll, submittals stating manufacturer, and badging records. We keep them for the project and furnish them to the GC or owner on request. Experience modification rate and incident statistics come from carrier documents, so we don’t publish them on a web page. Let us know what your prequalification form asks for, and we’ll have the carrier issue it.
Next step
Send your site safety requirements with the bid documents, through the request a bid page or to carson@telelinkca.com. That way the site-specific plan that comes back with our bid is written to fit your program instead of being a generic template. It also helps to tell us whether the building will be occupied, whether badging, fingerprinting or escorts are required, and whether the project carries federal funding. All three change the schedule and the equipment we can submit.
General contractors are welcome to ask for the prequalification packet by email. The for general contractors page lists what a complete packet contains.