- General contractors and their estimators
- Tenant IT directors and managed service providers
- Corporate real estate and facilities managers
- Landlords and property managers on spec suites
- Architects and engineers writing Division 27 and 28
- Structured cabling, Cat6 and Cat6A
- Network room and IDF buildout
- Furniture system feeds and floor boxes
- Conference room AV
- Access control and visitor entry
- Wi-Fi and business phones
- ANSI/TIA-568, 569, 606 and 607
- Plenum vs riser cable ratings under the California Electrical Code
- TIA-607 room bonding and dedicated circuits by the electrician
- Electrified door hardware by Division 08 or a C-28 contractor
| Typical scope | Cabling, IDF, furniture feeds, AV, access control |
|---|---|
| Testing | Permanent link certified, results delivered |
| Coordination | Rough-in with framing, electrical and ceilings |
| Closeout | As-builts, TIA-606 labels, test results, O&M |
| Project | State Controller's Office, Sacramento |
| License | CSLB #472017, C-7 Low Voltage Systems |
Why the GC’s schedule drives low voltage on a tenant improvement
On an office tenant improvement, the low voltage contractor doesn’t control much of the calendar. The general contractor sets the sequence, the landlord sets the building rules, and the tenant sets the move-in date. Our work has to fit into the short windows between framing, drywall, ceilings, flooring and furniture.
| Window | What has to be finished in it | What happens if it’s missed |
|---|---|---|
| Before drywall | Outlet boxes, mud rings, wall sleeves and pathway set | The boxes often go in later as surface mounts |
| Before ceiling tile | Cable pulled, supported and firestopped above the ceiling | The above-ceiling inspection can fail, or the tile gets pulled twice |
| At furniture set | Feeds pulled into the raceway, workstations terminated | The tenant may move in without working phones |
The scope itself is straightforward. The hard part is the timing. So we schedule material deliveries to each phase date, plan each phase around the days we’re given, and hand the space back clean.
Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We did the low voltage scope for a tenant improvement on a working state agency floor in Sacramento, and a private tenant’s job follows the same sequence.
Who buys low voltage on an office TI
- General contractors carry Division 27 and 28 on the bid list. They want a number that matches the specification with the exclusions spelled out, and a subcontractor who won’t cost them a day. Our general contractor page explains how we bid and submit.
- Tenant IT directors and managed service providers own the network after move-in. They set the category, the labeling scheme, the rack layout and the switch vendor, and they want the test results and as-builts in a form they’ll use.
- Corporate facilities and real estate managers buy across multiple sites and want the same standard in every office.
- Landlords and property managers fit out spec suites and building-level systems: riser cabling, base building access control, lobby cameras and the intercom at the suite door.
- Architects and engineers write the Division 27 and 28 specifications. They want a subcontractor who reads them closely and asks the right questions before bid day. Our Division 27 and 28 spec checklist is the same list we work through ourselves.
Rough-in: coordinating with framing, electrical and ceilings
A mistake at rough-in gets expensive once the drywall is up. So before framing closes, we set the outlet boxes and mud rings at the heights on the drawings and work with the electrician to avoid back-to-back boxes. We install sleeves through rated walls and firestop them, and we hang J-hooks or install cable tray along the pathway shown. Where the specification gives conduit stubs to the electrician, we confirm locations with them on the walkthrough, to keep stubs from ending up behind a cabinet.
Above the ceiling, the cable has to be rated for the space. In a return air plenum, that means CMP cable under California Electrical Code Article 800 and 805 for communications circuits. In a non-plenum ceiling, CMR is acceptable. We support cable every four to five feet and keep it off the grid wires and away from light fixtures and line voltage. Bundles stay within the fill and support limits the above-ceiling inspector checks. On new work we generally recommend Cat6A to workstations and access points, and the structured cabling page explains the tradeoff with Cat6.
Power over Ethernet matters here too. Access points, phones and cameras running on 802.3bt draw enough power to make bundles run warm. That’s another reason we like Cat6A and smaller bundles on new TIs. We size pathways for the drop count on the drawings plus whatever spare capacity the specification calls for.
The network room, built to the spec and ready for the IT vendor
Most TIs have at least one telecommunications room. The IT vendor’s switches arrive the week before move-in, and the room has to be finished by then. We build the network room to TIA-569 and the tenant’s standard. That includes fire-retardant plywood backboard where specified, racks or cabinets anchored per the drawings, overhead ladder rack, patch panels and vertical cable management. It also includes a telecommunications bonding busbar, with the racks, ladder rack and cable shields bonded to it per TIA-607. The electrician provides the dedicated circuits, the receptacles and the bond from the busbar to the building grounding electrode system. Cooling belongs to the mechanical contractor, so we give them the heat load from the equipment list. That way the cooling can be sized for the equipment at full load.
We submit rack elevations and the patch panel layout before we order material, so the IT vendor can check them against the switch count and the uplink plan. Our MDF and IDF buildout guide walks through the room from backboard to certification.
Furniture feeds, conference room AV and access control
Furniture feeds. Modular furniture gets fed from a base feed at the wall, a power pole from the ceiling or a floor box in the slab. We settle the feed location with the furniture installer before the furniture drawings are final. On the day the furniture is set, we pull the cables into the furniture raceway and terminate at the workstation. The GC or electrician cores the floor boxes and poke-throughs after the slab is scanned.
Conference room AV. The scope covers displays, cameras, microphones, ceiling speakers, table connectivity and a scheduling panel at the door. We cable it in conduit or with in-wall rated cable per the drawings and configure it for the tenant’s meeting platform. We install and configure Yealink video bars and conference phones, and we install other manufacturers’ equipment to the AV specification.
Access control and entry. That covers a reader at the suite entry, an intercom or video intercom for visitors, readers on the IT room and executive suite, and integration with the base building system where the landlord requires it. Cloud-managed platforms such as Brivo, Verkada and Avigilon Alta are commonly specified in multi-site tenant standards, and we install to whichever line is named. Electrified door hardware is coordinated with the GC’s Division 08 scope or a licensed C-28 contractor. More tenants now include reception duress buttons and controlled lobby entry in their own security plans, and we wire those in and integrate them with the rest of the system.
Wi-Fi and phones. We survey, install and configure managed wireless on Cisco Meraki or the tenant’s own platform. We also install Yealink IP phones and set them up with the tenant’s hosted VoIP provider.
Certification and closeout milestones
We treat closeout deliverables as scheduled milestones, so they aren’t left for after the job is done. Every permanent link gets tested with a calibrated tester rated for the category on the drawings (Level III for Cat6, Level IIIe for Cat6A), and any failed link is reworked before turnover. Here’s what the GC and the tenant’s IT team receive, and when:
| Milestone | Low voltage deliverable | Timing |
|---|---|---|
| Pre-construction | Submittals: product data, rack elevations, labeling scheme | Before material order |
| Framing | Boxes, mud rings, sleeves, pathway set | Before drywall |
| Above ceiling | Cable pulled, supported, firestopped | Before above-ceiling inspection |
| Room buildout | Racks, ladder rack, panels, bonding busbar | Before IT vendor equipment arrives |
| Furniture set | Feeds pulled, workstations terminated | Day of furniture installation |
| Testing | Permanent link results, native and PDF | Before tenant move-in |
| Closeout | As-builts, TIA-606 labeling schedule, O&M, warranty letter, training | With final billing |
Office TI project: State Controller’s Office, Sacramento
At the State Controller’s Office in Sacramento, we handled the low voltage scope of a tenant improvement on a working state agency floor. That included network cabling, an IT network room buildout and surveillance cameras. We worked around the agency’s business hours and access rules, and closed out with test results and as-builts. The case study describes the scope as we performed it.
Next step
Send the Division 27 and 28 sections, the drawings and the milestone schedule through the request a bid page. We’ll come back with a bid that follows those sections and shows clearly where our work ends and the electrical, furniture and door hardware scopes begin. If you’re a general contractor, the general contractor page covers how we support your bid day and submittals.