CSLB #472017, C-7 Low Voltage Systems

Market

Low Voltage Contractor for Office and Tenant Improvement

We work alongside general contractors, tenant IT directors, corporate facilities managers, landlords fitting out spec suites, and the architects and engineers writing Division 27 and 28. We rough in cabling with the framer and the electrician, build the network room to the specification, and feed furniture and conference rooms to the GC's schedule. Drops are certified, and the closeout package is scheduled for delivery before move-in.

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor Open-plan office with workstations and plants
Who we work with
  • General contractors and their estimators
  • Tenant IT directors and managed service providers
  • Corporate real estate and facilities managers
  • Landlords and property managers on spec suites
  • Architects and engineers writing Division 27 and 28
Typical systems
  • Structured cabling, Cat6 and Cat6A
  • Network room and IDF buildout
  • Furniture system feeds and floor boxes
  • Conference room AV
  • Access control and visitor entry
  • Wi-Fi and business phones
Rules and standards that apply here
  • ANSI/TIA-568, 569, 606 and 607
  • Plenum vs riser cable ratings under the California Electrical Code
  • TIA-607 room bonding and dedicated circuits by the electrician
  • Electrified door hardware by Division 08 or a C-28 contractor
At a glance
Typical scopeCabling, IDF, furniture feeds, AV, access control
TestingPermanent link certified, results delivered
CoordinationRough-in with framing, electrical and ceilings
CloseoutAs-builts, TIA-606 labels, test results, O&M
ProjectState Controller's Office, Sacramento
LicenseCSLB #472017, C-7 Low Voltage Systems

Why the GC’s schedule drives low voltage on a tenant improvement

On an office tenant improvement, the low voltage contractor doesn’t control much of the calendar. The general contractor sets the sequence, the landlord sets the building rules, and the tenant sets the move-in date. Our work has to fit into the short windows between framing, drywall, ceilings, flooring and furniture.

WindowWhat has to be finished in itWhat happens if it’s missed
Before drywallOutlet boxes, mud rings, wall sleeves and pathway setThe boxes often go in later as surface mounts
Before ceiling tileCable pulled, supported and firestopped above the ceilingThe above-ceiling inspection can fail, or the tile gets pulled twice
At furniture setFeeds pulled into the raceway, workstations terminatedThe tenant may move in without working phones

The scope itself is straightforward. The hard part is the timing. So we schedule material deliveries to each phase date, plan each phase around the days we’re given, and hand the space back clean.

Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We did the low voltage scope for a tenant improvement on a working state agency floor in Sacramento, and a private tenant’s job follows the same sequence.

Who buys low voltage on an office TI

  • General contractors carry Division 27 and 28 on the bid list. They want a number that matches the specification with the exclusions spelled out, and a subcontractor who won’t cost them a day. Our general contractor page explains how we bid and submit.
  • Tenant IT directors and managed service providers own the network after move-in. They set the category, the labeling scheme, the rack layout and the switch vendor, and they want the test results and as-builts in a form they’ll use.
  • Corporate facilities and real estate managers buy across multiple sites and want the same standard in every office.
  • Landlords and property managers fit out spec suites and building-level systems: riser cabling, base building access control, lobby cameras and the intercom at the suite door.
  • Architects and engineers write the Division 27 and 28 specifications. They want a subcontractor who reads them closely and asks the right questions before bid day. Our Division 27 and 28 spec checklist is the same list we work through ourselves.

Rough-in: coordinating with framing, electrical and ceilings

A mistake at rough-in gets expensive once the drywall is up. So before framing closes, we set the outlet boxes and mud rings at the heights on the drawings and work with the electrician to avoid back-to-back boxes. We install sleeves through rated walls and firestop them, and we hang J-hooks or install cable tray along the pathway shown. Where the specification gives conduit stubs to the electrician, we confirm locations with them on the walkthrough, to keep stubs from ending up behind a cabinet.

Above the ceiling, the cable has to be rated for the space. In a return air plenum, that means CMP cable under California Electrical Code Article 800 and 805 for communications circuits. In a non-plenum ceiling, CMR is acceptable. We support cable every four to five feet and keep it off the grid wires and away from light fixtures and line voltage. Bundles stay within the fill and support limits the above-ceiling inspector checks. On new work we generally recommend Cat6A to workstations and access points, and the structured cabling page explains the tradeoff with Cat6.

Power over Ethernet matters here too. Access points, phones and cameras running on 802.3bt draw enough power to make bundles run warm. That’s another reason we like Cat6A and smaller bundles on new TIs. We size pathways for the drop count on the drawings plus whatever spare capacity the specification calls for.

The network room, built to the spec and ready for the IT vendor

Most TIs have at least one telecommunications room. The IT vendor’s switches arrive the week before move-in, and the room has to be finished by then. We build the network room to TIA-569 and the tenant’s standard. That includes fire-retardant plywood backboard where specified, racks or cabinets anchored per the drawings, overhead ladder rack, patch panels and vertical cable management. It also includes a telecommunications bonding busbar, with the racks, ladder rack and cable shields bonded to it per TIA-607. The electrician provides the dedicated circuits, the receptacles and the bond from the busbar to the building grounding electrode system. Cooling belongs to the mechanical contractor, so we give them the heat load from the equipment list. That way the cooling can be sized for the equipment at full load.

We submit rack elevations and the patch panel layout before we order material, so the IT vendor can check them against the switch count and the uplink plan. Our MDF and IDF buildout guide walks through the room from backboard to certification.

Furniture feeds, conference room AV and access control

Furniture feeds. Modular furniture gets fed from a base feed at the wall, a power pole from the ceiling or a floor box in the slab. We settle the feed location with the furniture installer before the furniture drawings are final. On the day the furniture is set, we pull the cables into the furniture raceway and terminate at the workstation. The GC or electrician cores the floor boxes and poke-throughs after the slab is scanned.

Conference room AV. The scope covers displays, cameras, microphones, ceiling speakers, table connectivity and a scheduling panel at the door. We cable it in conduit or with in-wall rated cable per the drawings and configure it for the tenant’s meeting platform. We install and configure Yealink video bars and conference phones, and we install other manufacturers’ equipment to the AV specification.

Access control and entry. That covers a reader at the suite entry, an intercom or video intercom for visitors, readers on the IT room and executive suite, and integration with the base building system where the landlord requires it. Cloud-managed platforms such as Brivo, Verkada and Avigilon Alta are commonly specified in multi-site tenant standards, and we install to whichever line is named. Electrified door hardware is coordinated with the GC’s Division 08 scope or a licensed C-28 contractor. More tenants now include reception duress buttons and controlled lobby entry in their own security plans, and we wire those in and integrate them with the rest of the system.

Wi-Fi and phones. We survey, install and configure managed wireless on Cisco Meraki or the tenant’s own platform. We also install Yealink IP phones and set them up with the tenant’s hosted VoIP provider.

Certification and closeout milestones

We treat closeout deliverables as scheduled milestones, so they aren’t left for after the job is done. Every permanent link gets tested with a calibrated tester rated for the category on the drawings (Level III for Cat6, Level IIIe for Cat6A), and any failed link is reworked before turnover. Here’s what the GC and the tenant’s IT team receive, and when:

MilestoneLow voltage deliverableTiming
Pre-constructionSubmittals: product data, rack elevations, labeling schemeBefore material order
FramingBoxes, mud rings, sleeves, pathway setBefore drywall
Above ceilingCable pulled, supported, firestoppedBefore above-ceiling inspection
Room buildoutRacks, ladder rack, panels, bonding busbarBefore IT vendor equipment arrives
Furniture setFeeds pulled, workstations terminatedDay of furniture installation
TestingPermanent link results, native and PDFBefore tenant move-in
CloseoutAs-builts, TIA-606 labeling schedule, O&M, warranty letter, trainingWith final billing

Office TI project: State Controller’s Office, Sacramento

At the State Controller’s Office in Sacramento, we handled the low voltage scope of a tenant improvement on a working state agency floor. That included network cabling, an IT network room buildout and surveillance cameras. We worked around the agency’s business hours and access rules, and closed out with test results and as-builts. The case study describes the scope as we performed it.

Next step

Send the Division 27 and 28 sections, the drawings and the milestone schedule through the request a bid page. We’ll come back with a bid that follows those sections and shows clearly where our work ends and the electrical, furniture and door hardware scopes begin. If you’re a general contractor, the general contractor page covers how we support your bid day and submittals.

FAQ

Questions about office & tenant improvement projects

When does the low voltage contractor need to be on site during a TI?

At least three times. The first is during framing, to set boxes, mud rings, sleeves and pathway before drywall. The second is after drywall and before ceiling tile, to pull and dress cable and pass the above-ceiling inspection. The third is after the furniture is set, to terminate, test, label and cut over. In between, we sit in on the GC's coordination meetings so our work is coordinated before walls and ceilings close.

Link to this answer
Who provides the conduit stubs and the power in the IDF?

The electrician provides the dedicated circuits, the receptacles and the bond from the telecommunications room to building ground. We provide the racks, ladder rack, patch panels, J-hooks and sleeves, plus the bonding busbar and rack bonding inside the room. The specification assigns the conduit stubs and floor box cores, and our bid spells out which ones we're carrying.

Link to this answer
Do you certify every cable or just a sample?

We certify every permanent link against the category on the drawings, using a calibrated tester rated for it: Level III for Cat6 and Level IIIe for Cat6A. Any link that fails gets reworked before turnover. The GC and the tenant's IT team get the results in the tester's native format and as a PDF, organized by the labeling scheme.

Link to this answer
Can you feed modular furniture and floor boxes?

Yes. We work out the base feed or power pole location with the furniture installer, pull the data cables into the furniture raceway, and terminate at the workstation. The GC or electrician cores the floor boxes and poke-throughs in the slab after it's scanned, and then we pull and terminate to them.

Link to this answer
Do you install conference room AV?

Yes. That includes displays, cameras, microphones, speakers, table connectivity and room scheduling panels, cabled in conduit or with in-wall rated cable and set up for the tenant's meeting platform. We install and configure Yealink video bars and conference phones, among other systems, and we install other equipment to the AV specification.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Planning a office & tenant improvement project? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.