CSLB #472017, C-7 Low Voltage Systems

Careers

Careers: Low Voltage Technician and Installer Jobs at Telelink

If you're a low voltage technician, cabling installer, lead technician or project coordinator looking for commercial and institutional work, we'd like to hear from you. We're a family-owned C-7 contractor, in business since 1983. Here's what the roles and the work look like, what we look for, and how to apply.

Updated
September 11, 2026

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor
At a glance
RolesTechnician, installer, lead technician, coordinator
WorkCommercial and institutional projects statewide
TravelScheduled in advance with a project manager
RequirementsClean driving record, background check
Applycarson@telelinkca.com with resume

Roles we hire for

We hire for four kinds of roles, as our projects need them. Low voltage technicians install, terminate, test and troubleshoot structured cabling, cameras, access control, wireless and the other systems on our services page. Cabling installers pull, dress and terminate copper and fiber under a technician’s direction, and they build toward the technician role. Lead technicians run the field on a project. They read the drawings and submittals, lay out the work, direct the crew, coordinate with the GC’s superintendent and the electrician, and own the daily log. Project coordinators support the project manager from the office, handling submittal logs, RFIs, material tracking, certified payroll on public work, closeout binders and scheduling.

We list roles as they open, but if you don’t see a posting, please send a resume anyway. Our hiring follows the project schedule, and when a project starts, we go back through the resumes on file.

What the work is like

All of our work is commercial and institutional. One project might be a state agency floor in downtown Sacramento, and the next a campus building in the Bay Area or an occupied senior housing building in San Diego. When a project needs travel, you’d go for a defined stretch of days with a dedicated project manager, and we aim to set those dates well in advance.

A lot of the work happens in occupied buildings. That means resident notices, working in a posted window, closing ceilings at the end of each shift, keeping corridors clear, and being courteous to the people whose office or apartment you’re standing in. On state, school and healthcare projects, it also means badging, background checks and following the building’s rules for escorts and after-hours access. Our safety and compliance page describes the safety program you’d be working under.

We hold our projects to the same technical standard. Copper drops are certified to ANSI/TIA-568 with a calibrated tester rated for the category: Level III for Cat6 and Level IIIe for Cat6A. Fiber strands are tested, cables are labeled to a scheme, and cameras and access points are documented by manufacturer for NDAA review. So the job includes documenting the work as well as installing it.

What a strong candidate brings

For technician and lead technician roles:

  • Hands-on experience with Cat6 and Cat6A termination and testing, fiber termination and OTDR testing, IP camera and access control installation, and reading construction drawings.
  • BICSI Installer 1 or Installer 2 credentials, or manufacturer training on platforms such as Cisco Meraki, ButterflyMX or DoorKing. Either one is a plus, and we’ll note it in your file.
  • A clean driving record, because the work involves driving company vehicles between sites.
  • The ability to pass a background check and fingerprinting, because state agency, school district and some housing projects require it before you can enter the building.
  • Comfort on ladders and lifts, and aerial lift certification if you have it.
  • Reliability, because a crew on a tight schedule depends on everyone showing up.

For project coordinator roles:

  • Familiarity with construction document flow, submittals, RFIs and closeout.
  • Experience with certified payroll on public works.
  • Accuracy on submittal and payroll logs. In this role, that matters more than years of experience.

For cabling installer roles:

  • A willingness to learn.
  • A clean driving record.
  • The ability to pass a background check.
  • The ability to do physical work above the ceiling all day.

How to apply

Email carson@telelinkca.com with your resume and a short note about which role you’re interested in and where you’re based. Attach any certifications you have. Resumes go into the file we work from when a role opens.

Equal opportunity

Telelink Business Services is an equal opportunity employer. Hiring, assignment, training and advancement decisions are made without regard to race, color, religion, sex, gender identity, sexual orientation, national origin, ancestry, age, disability, medical condition, genetic information, marital status, military or veteran status, or any other characteristic protected by California or federal law. Reasonable accommodation is provided in the application process and on the job on request.

Next step

If you’re a technician, installer or coordinator, send your resume to carson@telelinkca.com. We’d be glad to hear from you. If you’re looking for a low voltage contractor for a project rather than a job, start with the request a bid page. The for general contractors page explains how we work on a bid list.

Apply

How to apply

Email your resume and a few sentences about the low voltage work you've done to carson@telelinkca.com, or call (916) 340-7503.

FAQ

Questions we get asked

Do I need a BICSI certification to apply?

No. BICSI Installer credentials and manufacturer training are a plus, and we'll note them in your file. For technician roles, though, hands-on experience with termination, testing and reading drawings matters more.

Link to this answer
How much travel is involved?

It depends on the project. When a job needs travel, it runs as a defined stretch of days, scheduled in advance with a project manager, rather than open-ended travel.

Link to this answer
Is a background check required?

For many projects, yes. State agencies, school districts and some housing owners require background checks or fingerprinting before a technician can enter the building. Because of that, being able to pass one is a hiring requirement.

Link to this answer
Do you hire installers without experience?

Yes, for cabling installer roles. To start, you'll need a clean driving record, the ability to pass a background check, and the willingness to do physical work above the ceiling all day. From there, installers build toward the technician role.

Link to this answer
How do I apply?

Email carson@telelinkca.com with your resume, the role you're interested in, where you're based, and copies of any certifications. There's no online form. A resume and a short note are all you need to get started.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Have a project coming up? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.