- ButterflyMX
- DoorKing
We aren't tied to any brand. If your drawings call for something else, we'll install to the specification.
Where video intercom and telephone entry fit
Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We install entry systems for multifamily and senior housing, secured office lobbies, gated parking, and any building where the front door has to work without someone staffing it. The two platforms we install and configure directly are ButterflyMX, for video intercom and smart access in multifamily, and DoorKing (DKS), for telephone entry and gate and vehicular access. We installed entry and access control systems on the occupied renovations at Little Tokyo Towers in Los Angeles and Horton House in San Diego.
An entry system is the front end of an access control system. Tenants and staff use credentials at the door, while visitors, deliveries and service vendors use the intercom or entry panel. When the two are designed together, one directory drives both, one set of door hardware serves both, and one closeout package documents both. When they’re bought separately, the property can end up with two apps, two directories, and a lobby door with two release circuits that nobody has tested together. Our access control page covers the credential side. This page covers the visitor side and the vehicle gate.
Our scope includes the panels and entry units, keypads and vehicle readers, controllers and power supplies, the cabling and network connection, the release wiring to the door hardware and the gate operator inputs, the directory build, the property staff training, and the as-builts.
ButterflyMX: lobby panels, keypads, elevators, and package rooms
ButterflyMX is a cloud-managed video intercom and access platform built for multifamily. The lobby panel is a touchscreen with a camera and a directory. A visitor searches for a name and the platform places a video call to the tenant’s phone app. The tenant sees the visitor and can release the door from wherever they are. The same platform also handles parts of a multifamily building that have traditionally needed separate systems:
- Keypads at secondary doors, amenity spaces, and stairwells, using the same credentials and the same directory as the lobby panel
- Elevator controls that limit a visitor admitted at the lobby to the floor of the tenant who let them in
- Package room access, so a carrier can enter a locked package room with a delivery PIN and the property gets a time-stamped record
- Visitor passes and virtual keys that a tenant issues from the app, time-limited, for a guest, a dog walker or a cleaning service
- Delivery PINs for carriers and food delivery, managed by the property instead of taped to the door
- Cloud directory management, with move-in and move-out handled from a browser, and integrations with property management software on many platforms
Staff use the same app to open doors, and property management can see a log of every entry event with a snapshot from the panel camera. We build the initial directory from the rent roll, program the door and elevator relays, verify every entry point with a test call, and train the property team before turnover.
The lobby panel needs an Ethernet connection with PoE or a local power supply, a release circuit to the door hardware, and a clean mounting surface at the right height. If the lobby is being renovated, we coordinate the rough-in with the GC so the panel sits in the wall instead of on it.
DoorKing telephone entry and vehicular gate access
DoorKing (DKS) telephone entry systems are the workhorse at vehicle gates, pedestrian gates, and buildings where a phone-based directory makes the most sense. A visitor scrolls or searches the directory on the unit, the unit calls the tenant’s phone, and the tenant presses a key to release the gate or door. DKS also makes the access controllers, keypads, card readers and long-range vehicle readers that let tenants come in without calling anyone. Its management software programs the directory and credentials across every entry point on the property.
At a vehicle gate, the entry system is one piece of a sequence. That sequence includes the gate operator, the loops in the pavement that detect a vehicle, the safety devices that stop the gate, and the exit loop or free exit device. Our scope is the entry unit, the readers and keypads, the controller, and the low voltage control wiring to the operator’s inputs. The gate operator, its line voltage feed, and the gate’s safety devices belong to the gate contractor and the electrician. Before turnover, we test the whole sequence with the gate contractor, including a tenant’s fob, a visitor’s call and the exit loop.
DKS units are also common at senior housing and office properties where tenants would rather get a phone call than use a smartphone app. A setup we see often pairs a ButterflyMX panel at the pedestrian lobby with DKS at the vehicle gate, both tied into the same access control credentials.
Cellular connectivity when the copper line goes away
Telephone entry systems were designed around an analog phone line. Carriers across California have been retiring copper lines, and property owners are finding that the line to the gate is either gone or priced to push them off it. Once the line is gone, the entry system can’t call anyone.
The fix is a cellular gateway or an internet connection. DKS offers a cellular voice and data gateway that gives the entry unit a phone path and a programming path without a landline. ButterflyMX panels run over the building’s internet connection and don’t use a phone line at all. On our projects, we confirm which path the unit will use. For cellular, we check signal strength at the actual mounting location, and we test calls to a sample of tenant numbers before the old line is disconnected.
If you own several properties with aging telephone entry units, a cellular conversion that keeps the existing unit in place is often the smallest change that keeps the gate working. When the unit itself is at end of life, a new entry system with a modern connection is usually the better use of the money.
Mounting heights, reach ranges, and the lobby itself
If a wheelchair user can’t reach the entry panel, that’s a compliance problem, and it’s a daily frustration for the person trying to get in. The 2010 ADA Standards put unobstructed forward and side reach between 15 and 48 inches above the floor. California’s building code accessibility chapter carries similar requirements, with its own details for obstructed reach, clear floor space, and operable parts. The touchscreen, the keypad, the call button and the card reader all count as operable parts. We mount panels so the highest operable element is within reach range, and we keep a clear floor space in front of the panel. On new construction, we confirm the exact dimensions with the architect, because local plan checkers vary in how they interpret obstructed reach at a vestibule or a vehicle gate.
Vehicle gate units have their own geometry. A driver has to be able to reach the unit from the window without opening the car door, and that sets the height and the setback from the drive lane. A gooseneck post with the right offset is usually part of the package. If a gate serves both cars and pedestrians, we generally recommend a second unit at pedestrian height.
Weather, glare and vandalism drive the rest of the mounting decision. A panel in direct afternoon sun needs a hood or a shaded location so the screen stays readable and the camera isn’t blinded. Ground-level panels in unattended locations get vandal-resistant models and a camera watching the panel.
Directory administration and tenant turnover
In multifamily, the entry system is only as good as its directory. If move-outs are still listed and move-ins are missing, visitors can’t get in and tenants start propping the door. So the design decision that matters most is who updates the list and how, more than which panel goes on the wall.
Cloud platforms handle this from a browser, and several integrate with property management software, so a lease start or end updates the directory automatically. DKS management software programs directories and credentials across the property from a workstation or over the cellular gateway. We build the initial directory from the rent roll and set up staff accounts with the right permissions. Then we train the property manager and leasing staff on move-ins, move-outs, visitor pass settings, and pulling an entry log when the office needs to know who opened a door.
Senior housing adds two things to plan for. First, tenants may not use a smartphone, so a telephone call or an in-unit station is the main path and the app is an extra. Second, staff, caregivers and regular visitors need ways in that don’t depend on the tenant answering. That usually means staff credentials, delivery PINs, and a front desk override.
Phasing an entry system replacement in an occupied building
A lobby door shouldn’t be left unsecured while a panel gets swapped. On an occupied renovation, we start by surveying the existing entry unit, door hardware and cabling. We install the new panel, controller and network connection while the old unit keeps working, then build and test the new directory. Cutover happens with property management on site and a written notice to tenants. Vehicle gates are cut over at a low-traffic time with the gate contractor there. The old unit comes out only after the new one has handled a full day of real traffic. Our guide to low voltage work in occupied buildings covers noticing, scheduling and unit access in more detail.
Next step
A site plan with entry points and gates marked is the most useful thing to send. Add the number of units or tenants and whether the property has a working phone line at each entry, and upload it all through request a bid. We’ll send back a bid that shows the scope split with the door hardware and gate trades. General contractors can start at for general contractors for our prequalification packet.