The short answer
As a California commercial planning range as of 2026, a fixed security camera runs roughly $1,000 to $3,000 per camera installed. That covers the camera, mount, junction box, the Cat6 drop, aiming, configuration and documentation. Multisensor positions run about $2,500 to $5,500 each and PTZ cameras about $3,500 to $8,000, while the cost of a pole camera in a parking lot is driven by the trench and the pole rather than the camera. Recording is a separate budget: an on premise recorder sized for 24 cameras at 30 day retention runs about $4,000 to $12,000 for the appliance and drives, and cloud recording licenses commonly run about $100 to $500 per camera per year. Pathway difficulty, mounting height, occupied building work and prevailing wage move the installed number more than the camera model does.
| Fixed camera range | About $1,000 to $3,000 installed, California 2026 |
|---|---|
| Multisensor and PTZ | About $2,500 to $8,000 per position |
| Recorder, 24 cameras | About $4,000 to $12,000 appliance and drives |
| Cloud recording | About $100 to $500 per camera per year |
| Biggest variables | Pathway, height, exterior, occupied, conduit |
| License | CSLB #472017, C-7 Low Voltage Systems |
Per camera planning ranges for California work in 2026
Camera systems are priced by the position, then adjusted for the building. The figures below are California commercial planning ranges as of 2026. Use them for budgeting. They aren’t quotes.
Each range covers the camera, the mount, and a junction box or backbox where the position needs one. It also covers the Cat6 or Cat6A drop from the camera to the nearest telecom room, with termination, labeling, certification test, aiming and per camera configuration. The ranges don’t include the recording platform, storage, licensing, PoE switching, electrical work, conduit, trenching or poles.
| Position | Planning range per camera, installed |
|---|---|
| Interior fixed dome or turret, grid ceiling, short run, unoccupied | About $1,000 to $2,000 |
| Interior fixed camera, hard lid ceiling or occupied building with night work | About $1,500 to $2,800 |
| Fisheye, interior lobby, mail room or break room | About $1,200 to $2,600 |
| Exterior fixed bullet or turret under 12 ft, existing pathway | About $1,400 to $2,800 |
| Exterior fixed camera at height, lift and new conduit | About $2,000 to $4,000 |
| Multisensor at a building corner or corridor intersection | About $2,500 to $5,500 |
| PTZ at a yard, dock or campus quad | About $3,500 to $8,000 |
| Pole camera in a lot, new pole, base, conduit and trench | About $8,000 to $25,000 and up |
If you’re adding one or two cameras to an existing system, expect the price to land above these bands, because mobilization, programming and the trip itself don’t scale down. On a hundred camera building, the repetitive interior positions tend to land toward the low end of each row.
What goes into a per camera price
The camera often isn’t the largest line. On an interior position, the cable drop and the labor to route, terminate, test and aim usually cost more than the hardware.
| Component | What it covers | Planning range per camera |
|---|---|---|
| Camera, fixed dome, turret or bullet | 4 to 8 MP commercial grade with IR and wide dynamic range | $250 to $900 |
| Camera, multisensor | Three or four sensor housing on one drop | $1,200 to $3,000 |
| Camera, PTZ | Outdoor pan tilt zoom with illuminator and surge protection | $1,500 to $4,500 |
| Mount, junction box, weather boot, pendant or wall arm | Listed hardware for the surface and the environment | $40 to $300 |
| Cat6 drop, or Cat6A where the specification requires it | Same rates as any data drop, terminated, labeled and tested | $150 to $450 Cat6, $200 to $600 Cat6A |
| PoE switch port share | Port and switch capacity at 802.3af, at or bt | $75 to $300 |
| Aiming, focus, per camera configuration, documentation | Field of view set and recorded, name and label applied | $150 to $400 |
Those two drop figures are the Cat6 and Cat6A ranges from our structured cabling cost guide, because a camera drop is simply a data drop with a camera on the end. The per position ranges in the first table assume a Cat6 drop, so a Cat6A specification moves each position by the difference between the two lines. It also explains why a camera system installed along with the building cabling usually costs less per camera than one retrofitted two years later.
The variables that move the number most
Pathway and ceiling type. An accessible grid ceiling with J-hooks already in place is the cheapest condition. A hard lid drywall ceiling means cutting and patching access openings or fishing the cable, which can double the labor on that position. Exposed structure in a warehouse means long runs and often conduit.
Height and lift. Anything above about 14 feet needs a lift, and a lift changes the crew size, the rental line and the pace of the work. Parking structures and warehouses are usually lift jobs from day one.
Exterior versus interior. Exterior positions need weather rated housings, listed exterior boxes and drip loops. They also need sun shields where glare is a problem, surge protection at the building entrance on long exterior runs, and often conduit. Plan on 30 to 60 percent above a comparable interior position.
Conduit and trenching. Conduit through rated walls, along exterior walls or across a roof gets priced as its own line rather than assumed. Trenching for a pole camera is civil scope, and it typically costs several times the camera it serves.
Occupied buildings. Corridors that stay in use, resident notice, furniture protection, nightly cleanup and after hours shifts all slow the crew down. In occupied multifamily and senior housing, we phase camera work around residents, give notice through property management, and finish each corridor before moving on.
Prevailing wage. On public work the crew is paid the applicable DIR determination with fringes, and the job carries certified payroll and apprenticeship obligations. Prevailing wage raises labor, not material. The labor share of an installed camera is an assumption rather than a measured figure. Carried at about 60 percent, a determination that raises the wage about 40 percent moves the installed line about 24 percent, not 40.
NDAA compliant equipment. On federally funded work, Section 889 and 2 CFR 200.216 exclude covered manufacturers and a large share of the white label equipment they build for other brands. That narrows the camera list and adds submittal documentation time. Our guide to NDAA Section 889 compliant cameras covers how to write the specification and audit an existing system.
Camera count. The count itself is the biggest single lever, and it comes from a written purpose for each camera rather than from floor area. The camera count method and the camera coverage calculator both work through that before anything is priced.
Recording, storage and licensing over five years
Where the video lives sets the recurring cost. The figures below are California commercial planning ranges as of 2026 for one building with 24 cameras at 30 day retention. Cameras, mounts, cabling, switching and labor are the same across all three architectures, so they’re left out.
| Line item, 24 cameras, 30 day retention | On premise NVR | Cloud recording | Edge with cloud management |
|---|---|---|---|
| Recording hardware, year one | About $4,000 to $12,000 for appliance and drives | None | None, or about $1,000 to $2,000 for a gateway |
| Camera premium for onboard storage | None | None | Roughly 5 to 15 percent per camera |
| Recording license, per camera per year | $0 to about $100 | About $100 to $500 | About $100 to $300 |
| Drive replacement across five years | About $1,000 to $4,000 | None | None |
| Five year recurring subtotal | About $1,000 to $16,000 | About $12,000 to $60,000 | About $12,000 to $36,000 |
| Bandwidth impact | LAN only | May force a circuit upgrade | Minimal |
Start with how long you need to keep video, then size storage to fit. Camera count, resolution, frame rate, codec and how much motion each scene sees all feed that calculation. Thirty days is a common starting point on commercial property, and lender, insurer, public records and housing program obligations can push it longer. The NVR, cloud and edge comparison works through the bandwidth and storage math in detail.
A worked example: 24 cameras on a two story office
Assumptions: two floors totaling about 35,000 sq. ft., occupied during the work with some after hours shifts. Most of the interior has a 2 by 4 grid ceiling, with hard lid at the lobby. There’s one IDF per floor with spare rack space, one lobby, three secondary exterior doors and a surface lot. The count is 16 interior fixed domes, 4 exterior fixed cameras under 12 ft, 2 multisensors at building corners, 1 fisheye in the mail room and 1 PTZ covering the loading area, for 24 cameras. Recording is on premise at 30 day retention, and the owner is private, so there’s no prevailing wage.
| Line item | Quantity | Planning range | Extended planning range |
|---|---|---|---|
| Interior fixed domes, occupied building | 16 | $1,500 to $2,800 | $24,000 to $44,800 |
| Exterior fixed cameras under 12 ft | 4 | $1,400 to $2,800 | $5,600 to $11,200 |
| Multisensors at building corners | 2 | $2,500 to $5,500 | $5,000 to $11,000 |
| Fisheye, mail room | 1 | $1,200 to $2,600 | $1,200 to $2,600 |
| PTZ, loading area | 1 | $3,500 to $8,000 | $3,500 to $8,000 |
| PoE switches with 802.3bt capacity, camera VLAN | 2 | $1,500 to $4,500 | $3,000 to $9,000 |
| Recorder appliance and drives, 30 day retention | 1 | $4,000 to $12,000 | $4,000 to $12,000 |
| Recording licenses, year one | 24 | $0 to $100 | $0 to $2,400 |
| Coverage design, commissioning, accounts, closeout package | 1 | $2,500 to $6,000 | $2,500 to $6,000 |
| Planning total, year one, low voltage scope | About $48,800 to $107,000 |
That’s roughly $2,000 to $4,500 per camera all in. It’s also why a per camera figure quoted without switching, recording and commissioning doesn’t tell you much. Change one assumption and watch where the total goes. Make it a public agency job and, on the 60 percent labor assumption above, a 40 percent determination moves the installed lines about 24 percent. Move the recorder to a cloud platform and year one drops by the cost of the appliance, while the five year recurring cost rises to about $12,000 to $60,000. Add two pole cameras in the lot and the trench, more than the cameras, sets the change order.
Per building planning ranges by property type
| Property type | Typical camera count | Planning total, year one, low voltage scope |
|---|---|---|
| Small office or clinic | 8 to 16 | About $15,000 to $60,000 |
| Two story office building | 16 to 30 | About $35,000 to $110,000 |
| Multifamily or senior housing common areas and perimeter | 24 to 60 | About $45,000 to $200,000 |
| Warehouse with yard and dock, including PTZ | 20 to 40 | About $40,000 to $180,000 |
| Parking structure with conduit throughout | 30 to 60 | About $80,000 to $280,000 |
| K-12 or campus building at prevailing wage | 30 to 80 | About $60,000 to $350,000 |
These totals assume cameras, mounts, cabling, PoE switching, an on premise recorder sized for 30 days, commissioning and documentation. They don’t include electrical work, poles and trenching, permits or any access control integration hardware. Our security camera systems page describes what a complete scope includes.
Next step
A floor plan showing the areas you need covered is the main thing we need. Add a note on ceiling type, whether the building will be occupied, and whether federal funds are involved, and send it all through request a bid. We’ll send back a camera schedule with a written purpose for each position, the cabling and switching priced separately from the cameras, the recording platform priced as options, and the NDAA documentation where it applies. Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. General contractors can find our Division 28 bid and submittal process on the for general contractors page.