The short answer
Card readers, keypads, intercom and entry panels, call buttons and mounted controls are operable parts under section 309 of the 2010 ADA Standards and section 11B-309 of the California Building Code. Each needs a clear floor space of at least 30 by 48 inches and must work with one hand, without tight grasping, pinching or twisting, at no more than 5 pounds of force. Unobstructed reach is 48 inches maximum and 15 inches minimum above the floor. Over an obstruction, the high reach drops to 44 inches for a forward reach deeper than 20 inches (25 inches is the depth limit), and to 46 inches for a side reach over an obstruction 10 to 24 inches deep and no more than 34 inches high. A device at 48 inches meets the unobstructed case but can still fail where a counter, bollard, rail or planter sits in front of it.
| Operable parts | 2010 ADA 309, CBC 11B-309 |
|---|---|
| Unobstructed reach | 48 in max high, 15 in min low |
| Obstructed forward reach | 44 in max over a reach depth above 20 in |
| Obstructed side reach | 46 in max over an obstruction 10 to 24 in deep |
| Operating force | 5 pounds maximum, one hand, no tight grasping |
| Protruding objects | 4 in max between 27 in and 80 in above floor |
What counts as an operable part
Section 205.1 of the 2010 ADA Standards states that operable parts on accessible elements, accessible routes, and in accessible rooms and spaces shall comply with section 309. California Building Code 11B-205.1 says the same and points to 11B-309.
That one sentence brings most of a low voltage device schedule into the accessibility review. A card reader is an operable part. So are a keypad, a video intercom or entry panel, a call button, a thermostat and a wall mounted control panel. If a person operates it, it’s an operable part, no matter which specification section bought it.
Both codes carry exceptions. Operable parts intended for use only by service or maintenance personnel are excluded. So a rack mounted controller inside a locked telecom room isn’t a reach range problem, but the reader on the outside of that door is. Dedicated use receptacles, floor receptacles and HVAC diffusers are also excluded. Where redundant controls serve a single element, one control in each space is excluded, except for light switches. The list is short, so during design, it’s safest to treat a device a building occupant touches as in scope. If it’s a close call, put it in an RFI instead of deciding it in the field.
Forward and side reach, with and without an obstruction
Section 309.3 requires operable parts to be placed within one or more of the reach ranges in section 308. The obstructed cases are where devices tend to fail.
| Condition | High reach maximum | Low reach minimum | Also required |
|---|---|---|---|
| Unobstructed forward reach, 308.2.1 | 48 in | 15 in | Clear floor space, forward approach |
| Forward reach over an obstruction 20 in deep or less, 308.2.2 | 48 in | 15 in | Clear floor space extends beneath the element |
| Forward reach over an obstruction more than 20 in deep, 308.2.2 | 44 in | 15 in | Reach depth 25 in maximum |
| Unobstructed side reach, 308.3.1 | 48 in | 15 in | Clear floor space, parallel approach |
| Side reach over an obstruction 10 in deep or less, 308.3.2 | 48 in | 15 in | Obstruction 34 in high maximum |
| Side reach over an obstruction 10 to 24 in deep, 308.3.2 | 46 in | 15 in | Obstruction 34 in high max, 24 in deep max |
California Building Code sections 11B-308.2.1, 11B-308.2.2, 11B-308.3.1 and 11B-308.3.2 carry the same dimensions. The two documents aren’t identical everywhere, though. Both apply to a covered California facility, so where they differ, the more stringent requirement controls.
Three notes from the field. First, measure to the operable part, not the enclosure. On an entry panel, that means the call button and the keypad, which often sit at different heights. Second, a device set at 48 inches is compliant only until something gets placed in front of it. A counter, a guard desk return, a bollard, a wheel stop or a vestibule rail creates an obstruction, and the allowable height drops to 46 or 44 inches. Third, a side reach caps the obstruction itself at 34 inches high, and a forward reach over an obstruction needs the clear floor space to extend underneath it. So a 42 inch counter with no knee space in front of a wall device usually isn’t an obstructed reach condition you can solve with a lower mounting height. It’s a clear floor space problem, and the device has to move.
Clear floor space, approach and one hand operation
Section 309.2 requires a clear floor or ground space complying with 305 at every operable part. Section 305.3 sets that space at 30 inches minimum by 48 inches minimum, and 11B-305.3 matches. The space is positioned for either a forward or a parallel approach, and that approach decides which reach case above applies.
On renovation work, this is where devices tend to fail. The wall is fine, but the floor in front of it isn’t. A reader behind a swinging door leaf, a keypad in a corner with a 24 inch return, an intercom above a floor mounted heater or a panel over a stair nosing has no compliant clear floor space at any height. Walk the device schedule against the architectural plan before rough in.
Section 309.4 covers operation. Operable parts shall be operable with one hand and shall not require tight grasping, pinching or twisting of the wrist, and the activating force shall be 5 pounds maximum. California Building Code 11B-309.4 is identical. That rules out twist knobs, spring loaded covers that take two hands, keyed switches used as the primary control, and stiff weather rated buttons on exterior stations. Actuation force is rarely on a datasheet, so ask for it before the submittal is approved.
Protruding objects and wall mounted panels
Section 307.2 states that objects with leading edges more than 27 inches and not more than 80 inches above the finish floor shall protrude 4 inches maximum horizontally into the circulation path. Section 307.4 requires 80 inches minimum vertical clearance. Where the clearance is less, a guardrail or barrier is required, with its leading edge 27 inches maximum above the floor. Section 307.3 limits free standing objects mounted on posts or pylons to a 12 inch overhang in the same height band. California Building Code sections 11B-307.2 and 11B-307.4 carry the same numbers.
Low voltage work often creates protruding objects. A surface mounted intercom master, a digital signage panel in a corridor, a surface backbox for an entry station and a wall bracket for a camera at a stair landing all sit in the 27 to 80 inch band. Four inches isn’t much once you stack a display, a mount and a media player enclosure. The usual fixes are straightforward: recess the enclosure, choose a low profile mount, move the device into an alcove, or drop the leading edge to 27 inches or lower so a person using a cane can detect it.
Device by device: what governs each mount
| Device | Governing requirement | Mounting consequence |
|---|---|---|
| Card reader, mobile credential reader | Operable part, 309 and 11B-309 | Target inside the reach range, clear floor space, watch counters |
| Keypad, PIN pad | Operable part, 309 | Keys operable with one hand, 5 lb maximum, whole key field inside the range |
| Video intercom or entry panel | Operable part, 309, plus 230 and 708 | Call button and keypad both in range; audible and visual signals |
| Thermostat, control panel, volume control | Operable part, 309 | Display readable from the clear floor space, no twist or pinch controls |
| Wall mounted display or signage panel | Protruding objects, 307.2 | 4 in maximum protrusion between 27 in and 80 in, or recess it |
| Interactive kiosk or touchscreen | Operable part, 309 | Whole active area inside the reach range; a full height screen usually isn’t |
| Assistive listening, assembly areas | 219 and 706 | Receiver count by seat count, 25 percent hearing aid compatible |
| Vehicle gate intercom or reader | Operable part where a pedestrian uses it, 309 | Confirm the approach with the AHJ; the drive up exception is narrow |
Two way communication and assistive listening
Section 230.1 of the 2010 ADA Standards sends two way communication systems to section 708. Section 708.2 requires both audible and visual signals, and 708.3 requires handset cords, where provided, to be 29 inches long minimum. Section 708.4 covers systems between a residential dwelling unit and a site, building or floor entrance. It requires the common use interface to support voice and TTY communication, and the unit interface to include a telephone jack capable of the same. California Building Code 11B-708 matches. On a telephone entry panel, the visual signal is the item most often missed. An audible tone alone doesn’t satisfy 708.2.
Assistive listening generally sits inside the low voltage scope. Section 219.2 requires an assistive listening system in each assembly area where audible communication is integral to the use of the space. There’s an exception where audio amplification isn’t provided, but it doesn’t apply to courtrooms. Section 219.3 sets receiver counts by seating capacity in Table 219.3, and requires that 25 percent minimum of the receivers provided, but no fewer than two, be hearing aid compatible. Section 706 sets the technical criteria: a 1/8 inch standard mono jack, neckloop interface for hearing aid compatibility, 110 dB minimum to 118 dB maximum sound pressure level with a 50 dB dynamic range on the volume control, 18 dB minimum signal to noise ratio, and peak clipping not exceeding 18 dB relative to the peaks of speech. Count receivers from the seat count on the architectural plan, and remember to buy the neckloops. Our audio visual systems page covers the room side.
Gates, drive up units and where plan checkers differ
A gate intercom that a driver operates from the vehicle window is the least settled condition on this list.
The 2010 ADA Standards treat the drive up case narrowly. Section 707.2 requires a clear floor or ground space at automatic teller machines and fare machines, with an exception for drive up only units. Section 707.3 then exempts drive up only automatic teller machines and fare machines from 309.2 and 309.3. Those exceptions name only two device types. There’s no general drive up exception for operable parts, and a parking gate intercom isn’t obviously an automatic teller machine or a fare machine.
That leaves two practical results. If the gate station is also how a pedestrian gets in, it’s an operable part on an accessible route and the ordinary rules apply. That includes a clear floor space on a firm, stable surface that a person isn’t expected to reach from a traffic lane. If the unit is genuinely drive up only, whether the exception extends to it is an AHJ question, and California plan checkers don’t all answer it the same way.
Vestibules raise the same kind of question. Whether a 30 inch deep guard desk in front of a reader creates an obstructed side reach or eliminates the clear floor space entirely is a judgment call, and reviewers differ. On a state funded or hospital project, the reviewing agency’s interpretation is the one that counts. If placing a device correctly would take a formal AHJ ruling, get that ruling in writing during plan check instead of an opinion after rough in.
Next step
If you can share the device schedule and the door schedule, we’ll check the mounting heights against the reach ranges and flag the clear floor space conflicts or protruding object conditions we find before rough in. Start at request a bid. For the systems themselves, see the access control systems and intercom and entry systems pages.