- Samsung
- LG
- BrightSign
- Peerless-AV
- Chief
We aren't tied to any brand. If your drawings call for something else, we'll install to the specification.
Lobby directories, menu boards, dashboards and video walls
Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We install digital signage displays, media players, signal distribution and the network infrastructure behind them for offices and tenant improvements, schools and community colleges, clinics, public agency buildings, warehouses and campuses across California.
Digital signage makes sense where the information changes and a printed sign would go out of date. That’s usually fewer locations than a project first assumes, so it helps to name them early and keep the screen count realistic.
| Application | Orientation | What drives the specification |
|---|---|---|
| Lobby directory | Portrait, often two panels | Daylight brightness, reach range, tenant list length |
| Wayfinding at decision points | Portrait | Sight line distance, corridor mounting depth |
| Cafeteria and menu boards | Landscape, ganged in rows | Heat and grease, matched color across panels |
| Campus and corridor displays | Landscape | Runtime hours, network reach, mount security |
| Video wall | Landscape array | Bezel dimension, service access, structural backing |
| Production and warehouse dashboards | Landscape | Ambient light, viewing distance, live data source |
| Waiting room displays | Landscape | Audio policy, content refresh, sight lines from seating |
Samsung, LG, BrightSign, Peerless-AV and Chief are among the manufacturers commonly specified on the California commercial projects we see, and we install to the spec. If there’s no specification, we’ll write one with the owner based on the rooms, the content, and who’s going to maintain it.
Choosing a display for duty cycle, brightness and orientation
Four things decide whether a panel holds up in the spot where it’s installed.
Duty cycle. A lobby screen runs for the length of the business day. A screen in a hospital corridor or a 24 hour operation runs nonstop. Commercial panels are rated for a stated number of hours per day. Put a 16 hour panel in a 24 hour position and you’re risking a denied warranty claim in year two.
Brightness. A display in a corridor and one facing a glass curtain wall aren’t the same product. Daylight positions need a high brightness panel with an anti glare treatment. A display sitting behind glass in a millwork surround needs a high temperature rating and ventilation, because trapped heat is a common cause of early panel failure.
Orientation. You can’t turn just any panel on its side. Portrait mounting is something the panel has to be rated for. A panel rated for portrait moves heat correctly when it’s rotated, and one that isn’t rated for it can cook itself.
Physical fit. Mount depth, the recessed box behind the panel, the bezel width where displays are ganged, and the weight the wall has to carry all get decided before framing. Display mounting in circulation paths is designed to the California Building Code Chapter 11B protruding object requirements. We check that dimension against the architect’s plan instead of waiting until install.
Exterior electrical signs and message centers are the work of a licensed C-45 sign contractor. When a project has both, we install the interior displays and the cabling, then bring the pathway and the network drop to that contractor at the sign cabinet. Both scopes are coordinated on the same drawing.
Media players versus system on chip displays
Both approaches run the same kind of content. The differences mostly show up after year three.
| Consideration | System on chip display | External media player |
|---|---|---|
| Hardware | Player built into the panel | Separate device at the display or the rack |
| Cabling | One data drop, one power outlet | Data drop plus a signal path to the panel |
| Content | Single zone playlists, images, basic video | Multi zone layouts, live data, higher bitrate video |
| Replacement | Replacing the player means replacing the panel | Player swapped without touching the display |
| Brand lock | Content platform tied to the panel maker | Display brand can change at refresh |
| Fits | Small deployments, simple loops | Campuses, dashboards, video walls, mixed brands |
It also matters where the player sits. Behind a panel, it’s out of sight but hard to service. At the rack, it’s easy to service but needs a signal run to the display. That’s where HDBaseT over Cat6A comes in, carrying the video, audio and control over one certified cable. We generally put players at the rack where the display is above reach or behind millwork.
Content management and who updates the screens
The content management system is the part the owner lives with every day. Hosted platforms are the common choice because they update themselves and reach screens across multiple sites without a VPN. On premises platforms still make sense for agencies and districts with a policy against hosted services, though that means one more server to patch.
Here’s what to settle during design, rather than after the screens are up:
- Who owns each screen group, by name and role, and what rights each of them gets
- Which templates exist, so staff fill in fields instead of designing layouts
- Whether dayparting is needed, for example a menu board that changes at 10:30 and a directory that shows an after hours message at close
- Where live data comes from: a spreadsheet, a scheduling system, a production line database, a transit feed
- What plays when the network or the data source is down, since a blank screen looks like a broken one
Most platforms also offer an alert or takeover feature that pushes a full screen message ahead of the playlist, and we’ll configure it when the owner asks. Think of it as one more place the message shows up, alongside the building’s existing system of record.
Cabling, power, backing and coordination before drywall
Every display position needs three things at the wall, and they come from three different trades.
From us: a Cat6A data drop, terminated and certified like every other drop in the structured cabling package. Where the player is remote, we add an HDBaseT run over Cat6A, and where a room system switches the display, we add control cabling. We use Cat6A rather than Cat6 because HDBaseT is sensitive to crosstalk that shorter data runs can tolerate, and because the run needs headroom for the next resolution. Our guide to Cat6 and Cat6A in commercial buildings covers that tradeoff.
From the electrician: the power at the wall. Line voltage receptacles and circuits serving displays are provided by a licensed C-10 electrical contractor. The receptacle sits in a recessed box behind the panel so the plug doesn’t hold the display off the wall.
From the general contractor: structural backing in the framing, sized for the panel and mount weight, at the exact height and centerline on the drawings.
All three have to come together before drywall. We mark display centerlines, box locations and backing extents on the coordination drawings, walk them with the superintendent, and confirm them in the field before board goes up. If a display position turns up after drywall, you’re looking at surface raceway, a patch, or a mount that sits 4 inches off the centerline of the millwork.
Video walls, bezels and calibration
A video wall is a different kind of install from a row of displays.
The bezel to bezel dimension decides whether the array reads as one image. Panels built for video walls publish that figure, and it’s the first thing we look at in submittal review. The mounting system needs micro adjustment in three axes and a pop out or front serviceable design. That way a failed panel in the middle of a nine panel array can come out without taking the whole array apart. The wall itself has to be flat and carry the load, so the backing is designed for the total weight rather than for one panel.
Even panels from the same production run drift in color and brightness, so the array is calibrated as a unit at commissioning and rechecked after burn in. Content is built to the canvas resolution of the whole array rather than a single panel. Static logos are avoided or moved on a schedule, because a fixed element can burn in on a wall that runs all day.
Network, VLAN and bandwidth planning
Signage players are network devices, so your IT group will want the same answers they’d need for any other system.
Put players on their own VLAN, with outbound access only to the content management service and the data sources. Reserve addresses so a player that reboots comes back where the monitoring expects it. Bandwidth is modest for scheduled content because players cache and sync overnight. Live video streams are a different story, since the load multiplies by the number of screens showing them. If a live stream is in the design, size the uplink for the full screen count and not for one screen.
Use wired connections wherever a drop can be pulled. If a display sits somewhere a cable can’t reach, a wireless connection works with a dedicated SSID and a coverage check at the mount location rather than at the floor. Set time from the same network source as the rest of the building so scheduled content changes at the same moment on every screen. And turn on the platform’s health reporting, so facilities can hear about a dark screen before a visitor does.
Next step
For a first pass, we’ll need the floor plans with display locations, the content each screen has to show, and the name of the person who’ll update it. You can upload drawings through request a bid, and we’ll send back a position by position bid with the electrical, backing and network coordination points drawn in. General contractors can start at for general contractors for our prequalification packet and Division 27 scope letter.