Licensed C-7 low voltage contractor · CSLB #472017
Commercial Low Voltage Contractor in California
We install structured cabling, fiber, security cameras, access control, Wi-Fi and phone systems in offices, apartment communities, schools, clinics and public buildings across California. We're family owned, and we've been doing the work ourselves since 1983.
- Family owned since 1983
- Our own technicians do the work
- One point of contact from bid to closeout
What we do
Low voltage services for commercial buildings
Our own technicians install and service the systems below, and you get one project manager and one number to call for all of it. That way you're not coordinating five subcontractors to finish one floor.

Structured Cabling
Cat6, Cat6A and backbone structured cabling designed to ANSI/TIA-568, installed, certified and documented for California commercial buildings by a licensed C-7 contractor
Learn more
Security Cameras
NDAA compliant IP camera systems for California commercial buildings: coverage design, NVR or cloud recording, PoE and VLAN networks, installed by a licensed C-7 contractor
Learn more
Access Control
Card, fob and mobile access control for California commercial buildings: readers, controllers, cloud or on-premise platforms, elevator control, by a licensed C-7 contractor
Learn more
Wireless Networks & Wi-Fi
Commercial Wi-Fi design and installation in California: predictive and on-site surveys, Wi-Fi 6, 6E and 7 access points, property-wide multifamily Wi-Fi, PoE budgets
Learn more
Fiber Optic Cabling
Single-mode and multimode fiber optic cabling for riser and campus backbones in California: design, fusion splicing, LC, SC and MPO termination, Tier 1 and Tier 2 testing
Learn more
Business Phone Systems
Business phone systems for California offices, agencies and multi-site organizations: hosted VoIP or on-premise PBX, POTS migration, SIP trunks, E911, Yealink phones
Learn more
Recent work
Recent low voltage projects across California
A few recent jobs: an occupied high-rise in Los Angeles, a senior community in San Diego, a working state office floor in Sacramento and a university building in Vallejo. They're very different buildings, and we brought the same approach to each one.
- Los AngelesLittle Tokyo TowersMultifamily renovation, occupied building
Property-wide Wi-Fi, CATV distribution, surveillance cameras and access control installed in an occupied multifamily building in Los Angeles by Telelink Business Services
- San DiegoHorton HouseSenior housing renovation, occupied
Nurse call, property-wide Wi-Fi, CATV, surveillance cameras and access control installed in an occupied senior housing building in San Diego by Telelink Business Services
- SacramentoState Controller's OfficeTenant improvement, working state agency floor
Network cabling, an IT network room buildout and surveillance cameras for a tenant improvement on a working State Controller's Office floor in Sacramento
- VallejoTouro UniversityCampus building renovation
Network cabling, an IT room buildout, wireless and a fiber backbone for a campus building renovation at Touro University in Vallejo by Telelink Business Services
Family owned since 1983 Our own technicians Why Telelink
In business since 1983, and we still do the work ourselves
Telelink started in 1983 installing business phone systems. The technology has changed a lot since then, but the way we work hasn't. Today the second generation of the family runs the company, and the technicians who show up on your job work for us. We don't bring in crews from a labor broker.
- We plan around the people in the building. Most of our projects happen with residents at home, staff at their desks or students in class. So we schedule carefully, give people notice before we start and clean up after ourselves.
- We install what the spec calls for. We aren't a dealer pushing one brand. If the drawings say Cat6A and Axis cameras, that's what goes in, tested and labeled.
- We leave you with documentation you can use. You get cable test results, labeled as-builts and a closeout binder your IT team can come back to for years.
Who we work with
Markets we serve, by building type
Pulling cable is usually the easy part. The harder part is working around residents, HUD inspections, prevailing wage or a campus network that can't go down. Pick your building type to see how we handle it.
-
Multifamily & Affordable Housing
Wi-Fi, CATV, cameras and entry systems for occupied HUD and LIHTC rehabs across California, phased unit by unit by a licensed C-7 low voltage contractor
- Project: Little Tokyo Towers
-
Senior & Assisted Living
Nurse call, emergency call, resident Wi-Fi, controlled entry and common-area cameras for occupied senior and assisted living communities in California, C-7 licensed
- Project: Horton House
-
Government & Public Works
Structured cabling, network rooms, cameras and access control for California state, county, city and special district facilities, bid and documented to public works rules
- Project: State Controller's Office
-
Education: K-12 & Higher Ed
Campus fiber backbone, classroom drops, high-density Wi-Fi, paging, cameras and access control for California school districts, community colleges and universities
- Project: Touro University
-
Healthcare & Clinics
Nurse call, cabling for imaging and EHR workstations, cameras and access control for California clinics, medical office buildings, dental practices and skilled nursing
Learn more -
Office & Tenant Improvement
Structured cabling, network rooms, furniture feeds, conference room AV and access control for California office tenant improvements, certified, labeled and closed out
Learn more -
Industrial, Warehouse & Manufacturing
Industrial Ethernet, fiber to production cells, high-bay Wi-Fi, dock and yard cameras, plant paging and gate access for California plants and distribution centers
Learn more -
Data Centers & Server Rooms
Structured cabling, MPO fiber backbone, containment coordination and cabinet access control for California enterprise data centers, computer rooms and MDF and IDF stacks
Learn more -
Hotels & Hospitality
Guest room cabling, high speed internet access, staff safety device infrastructure, cameras and meeting space AV for California hotels, phased floor by floor
Learn more -
Parking Structures
Cameras, ALPR, lane intercom, access control and fiber between decks for California parking structures attached to hospitals, campuses and office buildings
Learn more -
Retail & Shopping Centers
Store cabling kits, point of sale and loss prevention camera coverage, common area systems and tenant turnover work for California retail chains and shopping centers
Learn more -
Not sure where you fit?
If the building is commercial or institutional and it's in California, there's a good chance we can help. Just tell us what you're working on.
Get in touch
For general contractors
Prequalification and bids for general contractors
Ask for our prequalification packet and you'll get everything in one PDF. On the job, you'll have one point of contact, submittals planned around your schedule and RFIs that come with a proposed solution. At closeout, you get a package with certified test results instead of a pile of unlabeled patch panels.
Prequalification packet
What lands in your inbox
- CSLB license printout, classification and status
- Contractor bond and general liability certificates, current
- Workers compensation certificate and EMR letter
- Written safety program and sample site plan
- References on similar buildings, plus W-9 and your questionnaire
Platforms
Platforms we work with every week
These are the systems we install and configure most often, but we aren't tied to any of them. If your spec calls for something else, we'll install to the spec.
- Cisco MerakiCloud-managed switching, wireless, security appliances and cameras
- YealinkIP desk phones, cordless and conference phones for hosted VoIP
- ButterflyMXVideo intercom and smart access for multifamily and senior housing
- DoorKingTelephone entry, gate and vehicular access control
Where we work
Commercial and institutional work across California
We bid projects statewide, and we've finished a job in each of the regions below.
-
Sacramento & Central Valley
Sacramento, Roseville, Rocklin, Elk Grove, Folsom, Rancho Cordova
Learn more -
Bay Area
Vallejo, Benicia, Oakland, San Francisco, San Jose, Fremont
Learn more -
Los Angeles & Southern California
Los Angeles, Long Beach, Pasadena, Glendale, Burbank, Santa Monica
Learn more -
San Diego
San Diego, Chula Vista, Oceanside, Escondido, Carlsbad, El Cajon
Learn more
Reviews
What clients have said about working with us.
Here are a few excerpts from reviews our clients have left for us on Google.
These guys handled my phone and phone system move along with wire our new office from top to bottom. When all others failed, such as AT&T, Telelink was there to pick up the pieces. Most important out of all the great things I could say, they took all my calls and emails, no matter what time of day or night, even on the weekend and holidays. They know what they are doing and get it done right the first time.
U.S. Certified SignersOffice move: phone system relocation and a full office cabling installationI had an issue with my cameras and called for help. He was able to get me on the schedule within the week. They came out, diagnosed the problem, and fixed everything within a couple hours. Very professional, affordable, and fast.
Evan KorisService call on an existing camera systemAfter switching telephone and internet from ATT to Comcast, I needed to have some phone and data lines moved. I called Telelink and immediately received a professional response. An appointment was efficiently scheduled to coordinate with Comcast. The technicians were friendly, capable, and extremely helpful in working through some glitches. After the service, I received an invoice which was honest and very reasonable.
Glick OfficeMoves and changes on phone and data lines, coordinated with the carrier
Each review appears as the client wrote it. Where we shortened one, you'll see an ellipsis. Have we worked for you? Tell us how it went.
Resources
Guides, cost ranges and compliance notes
We wrote these plain-English guides for owners, facility managers, IT directors and estimators. They cover how to choose a contractor, what things cost and which rules apply to your building.
- Guide · 9 min read
How to Choose a Low Voltage Contractor in California
How to choose a low voltage contractor in California: the license to verify, the insurance to ask for, the questions that separate installers from brokers, and the red flags
Read the guide - Guide · 8 min read
Cat6 vs Cat6A: How to Specify Cabling for a Commercial Building
Cat6 vs Cat6A for commercial buildings: bandwidth, 10GBASE-T reach, pathway fill, PoE heat, relative cost, Wi-Fi 6E and 7 uplinks, and a decision framework by building type
Read the guide - Cost · 8 min read
Structured Cabling Cost in California: 2026 Planning Ranges per Drop
Cat6 installation cost and Cat6A planning ranges for California commercial buildings in 2026, per drop and per building, the variables that move price, and a worked example
Read the guide - Compliance · 8 min read
NDAA Section 889 Compliant Cameras: A California Buyer's Guide
Who NDAA Section 889 and 2 CFR 200.216 apply to, which camera makers are covered, the white-label OEM problem, and how to specify and document NDAA compliant cameras
Read the guide - Compliance · 9 min read
The California C-7 Low Voltage License Explained: Scope, Exclusions, and How to Verify One
What the California C-7 low voltage contractor license covers and excludes, how it differs from C-10, C-28 and a BSIS alarm license, and how to verify a bidder at CSLB
Read the guide - Guide · 9 min read
Nurse Call Systems for California Senior Housing: A Planning Guide
Nurse call system planning for California senior housing and assisted living: system types, wired vs wireless, UL 1069 and UL 2560, owner requirements, occupied retrofits
Read the guide
Have a project coming up? Let’s talk.
Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.