CSLB #472017, C-7 Low Voltage Systems

Market

Low Voltage Contractor for Government and Public Works

We do public low voltage work for state agency facilities and IT staff, county and city public works departments, special districts, and general contractors carrying Division 27 and 28 on public bids. We price it at prevailing wage, track it with certified payroll and apprentice hours, send badged technicians onto working agency floors, and close out the way an agency inspector expects.

Delivered
State Controller's Office

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor California State Capitol building in Sacramento
Who we work with
  • State agency facilities and IT staff
  • County and city public works and IT departments
  • Special districts: water, transit, utility, parks
  • GCs and electrical primes on public bids
Typical systems
  • Structured cabling and fiber backbone
  • IT and network room buildout
  • Video surveillance
  • Access control and badging integration
  • AV for boardrooms and hearing rooms
  • Business phone systems
Rules and standards that apply here
  • Prevailing wage, Labor Code 1720 et seq.
  • DIR contractor registration, Labor Code 1725.5
  • Certified payroll records, Labor Code 1776
  • Apprenticeship, Labor Code 1777.5
  • Agency badging, escort and clearance rules
  • NDAA Section 889 on federally funded work
At a glance
Typical scopeCabling, network rooms, cameras, access control, AV
Labor compliancePrevailing wage, certified payroll, apprentice ratio
DIR registrationProvided in the prequalification packet
ProjectState Controller's Office, Sacramento
CloseoutSubmittals, test results, as-builts, O&M
LicenseCSLB #472017, C-7 Low Voltage Systems

What public works rules add to an ordinary cabling scope

The cabling on a state agency floor is the same Cat6A, the same fiber and the same racks you’d install for a private tenant. What changes is who can get onto the floor, how labor is paid and reported, and what the inspector requires at closeout. On a public works project, the paperwork is as much a part of the job as the cabling.

Three things shape the work:

  • The floor is occupied. Public employees are doing public business, often with confidential records on desks and screens. So access is badged and escorted, and our crew works in set windows.
  • The money is public. By law, prevailing wage, DIR registration, certified payroll and apprenticeship requirements attach to the contract. A missed certified payroll filing carries a statutory penalty.
  • The agency is a permanent owner. It’ll run the system for decades, so it wants as-builts, labeling and test results that clearly show what was installed.

Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We’ve handled the low voltage scope of a tenant improvement on a working state agency floor in Sacramento. We build public works compliance into the bid from the start, so it’s priced before award.

Who buys low voltage in the public sector

Public sector work comes from several kinds of buyers, and each one has its own procurement path and its own inspector.

  • State agencies buy through the Department of General Services and their own facilities and IT divisions, often as tenant improvements in leased or state-owned office buildings.
  • Counties and cities buy through public works, general services and IT departments for administration buildings, courts, libraries, corporation yards, police and fire administration, and community centers.
  • Special districts such as water and sanitation districts, transit agencies, utility districts and park districts buy for operations centers, treatment plants, maintenance yards and board rooms, often with federal grant money attached.
  • General contractors and electrical primes list us as the Division 27 and 28 subcontractor on their public bids and carry our compliance paperwork through to the agency.

For all of them, the low voltage scope usually includes structured cabling, a network room buildout to the agency’s IT standard, cameras, access control tied to the agency’s badging system, boardroom or hearing room AV, and phones.

Prevailing wage, DIR registration, certified payroll and apprentices

Four requirements attach to almost every public works contract in California, and DIR registration has to be in place before a subcontractor can be listed on a bid.

Prevailing wage. Under Labor Code 1720 et seq., work paid for in whole or in part with public funds is public work. Workers must be paid the DIR prevailing rate for their craft and county, including fringe benefits and training fund contributions. Low voltage technicians typically fall under the communications or electrical determinations, depending on the work and the county. We price to the determination in effect at bid and track the predetermined increases through the contract.

DIR registration. Labor Code 1725.5 requires contractors and subcontractors to be registered with the Department of Industrial Relations to bid on, be listed on, or perform public works. There’s a small-project exemption for jobs under the statutory thresholds. Registration renews every year and the number must appear on the bid listing, so we send it with the bid and include it in our prequalification packet.

Certified payroll. Labor Code 1776 requires accurate certified payroll records for every worker on the project, filed electronically with the DIR and furnished to the awarding body or its labor compliance program on request. We submit on the schedule the awarding body sets, and we keep the records available for inspection.

Apprenticeship. Under Labor Code 1777.5, contractors on public works must employ apprentices at a ratio of one hour of apprentice work for every five hours of journeyman work in each craft. They must also notify the apprenticeship committee of the contract award (the DAS 140 form) within ten days, request dispatch of apprentices (the DAS 142 form) with the required notice, and pay training fund contributions. Some project delivery methods also carry skilled and trained workforce requirements that raise the share of graduate and apprentice hours. We confirm which ones apply before we price.

Federal money adds to the list. Transit, water and housing projects with federal grants bring the NDAA Section 889 and 2 CFR 200.216 restrictions on camera and network equipment. They sometimes bring Davis-Bacon too, either in place of or alongside state prevailing wage. So we ask for the funding sources along with the bid documents.

How public bidding reaches a low voltage subcontractor

Most public low voltage work comes to us in one of three ways, and the paperwork is different for each.

On a formal public bid, the general contractor or electrical prime takes our sealed subcontractor quote before bid day. Under the Subletting and Subcontracting Fair Practices Act, they list us on the bid form by name, license number and DIR registration. Once we’re listed, we can’t be substituted without the agency’s consent, so we build our quote to match the specification, with exclusions stated. We work through our Division 27 and 28 spec checklist before we quote.

On a direct agency purchase, the agency’s purchasing office sends out an informal bid or a quote request for a camera, access control or cabling project under its purchasing thresholds. Prevailing wage still applies above the statutory floor, and the agency will still want the compliance packet.

On a prequalified or job order contract, the agency prequalifies contractors with a questionnaire covering license, safety record, bonding capacity and labor compliance history, and then issues task orders. We keep our prequalification packet current so it’s ready to go out with the response.

Badging, clearance and working on an agency floor

Agency floors come with access rules that a private tenant usually doesn’t have. We ask about them before we price, because they affect the schedule.

  • Badging and background checks. Many agencies only issue contractor badges after a name check or a fingerprint-based check, and the lead time can run weeks. We submit crew names as early as the agency will take them and show the clearance lead time on the schedule, so it doesn’t get absorbed into the first week of work.
  • Escorts and restricted areas. Some floors require an agency escort at all times, and server rooms, records rooms and executive suites may be off limits without specific approval. Where we can, we plan cable routes around restricted areas, and we schedule escorted work in blocks.
  • Photography and tool control. Photos of the floor may be prohibited or limited to the work area. We clear as-built photography with the agency’s project manager ahead of time and deliver it on the agency’s terms.
  • After-hours work. Cutovers, core drilling and work in occupied open offices usually happen after hours or on weekends, with agency security present and the HVAC scheduled on.
  • Public counter security. Agencies updating their security plans often ask for lobby cameras, duress buttons at counters and controlled entry to staff areas. We install those on the same platform as the rest of the building’s access control and cameras.

Documentation an agency inspector expects

Agency inspectors look at the submittals and records as closely as the installation. We start building this package early in the job rather than leaving it for the end.

StageDocumentNotes
PrequalificationLicense, bond, insurance certificates, DIR registration, safety programProvided in the prequalification packet
BidSealed quote with inclusions, exclusions and unit pricesMatches the specification section by section
SubmittalsProduct data, shop drawings, rack elevations, labeling scheme, sample labelsApproved before material is ordered
ConstructionDaily reports, RFIs, change order pricing, certified payroll, apprentice dispatch recordsFiled on the schedule the agency sets
TestingPermanent link certification for every copper drop, OTDR and loss for fiber, camera and door commissioning sheetsNative tester files plus PDF
CloseoutAs-built drawings, TIA-606 labeling schedule, O&M manuals, warranty letters, training sign-inTurned over with the final payment request

Proof: State Controller’s Office, Sacramento

At the State Controller’s Office in Sacramento, we handled a tenant improvement on a working state agency floor: network cabling, an IT network room buildout and surveillance cameras. We scheduled the work around the agency’s business hours and access rules. The case study covers the scope as we performed it, along with the closeout documentation the agency received.

Next step

Send us the specification, the bid form and the funding sources with a bid request. We’ll send back a quote that matches the sections, with prevailing wage carried and the compliance packet attached. If you’re a prime listing a low voltage subcontractor on a public bid, our general contractor page explains how we support you on bid day.

FAQ

Questions about government & public works projects

Are you registered with the DIR for public works?

Our DIR registration and current certificates are in our prequalification packet, along with the license, bond and insurance certificates. Ask for the packet when you request a bid, and it'll come with the proposal.

Link to this answer
How does prevailing wage affect the price of low voltage work?

We price labor at the DIR determination for the craft and county, plus fringe, training fund contributions and the overhead of certified payroll and apprentice reporting. Material and equipment don't change. On a cabling-heavy scope, labor is the larger share of the price, so the difference from a private bid is real. If you ask, we'll show it as a separate line.

Link to this answer
Do you submit certified payroll to the DIR or to the agency?

Both, when the agency asks. We file certified payroll records electronically with the DIR on the schedule the awarding body sets, and send a copy to the prime contractor or the agency's labor compliance program in the format they request. We keep the records available for inspection for the period the Labor Code requires.

Link to this answer
Can your technicians work on a floor that requires agency badging?

Yes. Before we mobilize, we supply the names, identification and any background check paperwork the agency requires. On site, we work under the agency's escort rules and follow the floor's rules on photography, tool control and after-hours access. If the agency requires a fingerprint-based check, we build that lead time into the schedule.

Link to this answer
Do you work directly for agencies or only through a general contractor?

Both. Agencies often contract smaller cabling, camera and access control projects with us directly under their purchasing rules. Larger projects come to us through a general contractor or electrical prime that listed us on the bid. Either way, the labor compliance and documentation are the same.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Planning a government & public works project? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.