| Client | State Controller's Office |
|---|---|
| Location | Sacramento, California |
| Project type | Tenant improvement, working state agency floor |
| Occupied during work | Yes |
| Building | State agency floor, occupied by staff during construction |
| Scope | Network cabling, network room, cameras |
| Coordination | Agency hours, badging and access rules |
| Testing | Every permanent link certified |
| Closeout | Test results, as-builts, labeling schedule |
| License | CSLB #472017, C-7 Low Voltage Systems |
A working State Controller’s Office floor in Sacramento
The State Controller’s Office is a California state agency, and this project was a tenant improvement on one of its working floors in Sacramento. Our low voltage scope covered three systems: network cabling to the workstations and equipment on the floor, the buildout of the IT network room that serves it, and surveillance cameras.
A state agency floor comes with requirements a private office doesn’t have. Staff kept working on the floor during the project, and access to the floor was controlled by the agency rather than the general contractor. So we planned the work around the agency’s business hours and its rules for who could be on the floor, when, and with whom. The agency is also a permanent owner that will run the cabling and the room for years, so the closeout documentation mattered as much as the installation. Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. Our approach to government and public works is based on this project.
What we installed at the State Controller’s Office
Network cabling. We ran horizontal cabling from the network room to the workstation, printer, wireless and camera locations on the floor. It was installed to ANSI/TIA-568.2-E with the cable rating the ceiling required and supported on pathway sized for the drop count. Rated penetrations were firestopped, and the cabling was labeled to a scheme we agreed on with the agency’s IT staff.
IT network room buildout. We built the network room to TIA-569 and the agency’s standard. That included the backboard, racks, overhead ladder rack, patch panels, cable management, and a bonding busbar with the racks and ladder rack bonded to it per TIA-607. The dedicated circuits, the receptacles and the bond from the busbar to the building grounding electrode system were the electrician’s scope, and our submittal showed where our work stopped and theirs began.
Surveillance cameras. We installed cameras at the floor’s entries and in the areas the agency designated. They were cabled back to the network room, recorded on the agency’s platform and documented by manufacturer and model.
How the work was phased
The construction schedule set the order of work, and the agency’s operations set the hours. Pathway, boxes and sleeves went in during framing, before the walls closed. We pulled and dressed cable after drywall and before ceiling tile, in time for the above-ceiling inspection. We built out the network room ahead of the IT equipment delivery, so the agency’s switches could be racked and patched as soon as they arrived.
Anything that would disturb people at work, like cable pulls over occupied areas, core drilling and workstation cutovers, happened in windows the agency approved. The crew was badged and escorted according to the agency’s rules. We submitted crew names in advance, kept tools and ladders out of public and staff circulation, and cleaned up the floor at the end of each shift. Terminations, testing and labeling came after the furniture was installed, so each workstation was tested at its final location. The room buildout followed the checklist in our MDF and IDF guide.
What the agency received at closeout
At turnover, the agency received:
- Permanent link test results for every copper drop, in the tester’s native format and as PDF, organized by the labeling scheme.
- As-built drawings showing outlet, camera, pathway and equipment locations.
- Rack elevations and a patch panel schedule for the network room.
- A labeling schedule matching every outlet, panel and cable, following TIA-606.
- The manufacturer and model list for cameras and network room equipment.
- Manufacturer documentation and warranty letters for the installed equipment.
When a state agency project is public works, the low voltage subcontractor also carries the compliance package described on the government page linked above. DIR registration and current certificates go into the prequalification file along with it.
Next step
If your agency or your general contractor has a tenant improvement, a network room or a camera project on a working floor, we’d be glad to help. Send the specification and the floor’s access rules through request a bid. We’ll send back a quote that matches the spec sections, plus a phasing plan that fits the agency’s hours. Primes listing a low voltage subcontractor on a public bid can see how we support bid day on the general contractor page.
This is the scope as delivered. We don't publish quantities, contract values or schedule details. The photo above shows the city, not the property. We'll add photos of the completed work once the owner clears them for release.