CSLB #472017, C-7 Low Voltage Systems

Guide · 9 min read

Division 27 and Division 28 Specification Checklist for Commercial Low Voltage Systems

Use this checklist when you're writing or reviewing a Division 27 (Communications) and Division 28 (Electronic Safety and Security) specification as an architect, engineer or GC estimator. It lists the MasterFormat sections a commercial project should include, what to require in each one, and the omissions that tend to become change orders after award.

Published
September 12, 2026
By
Telelink Business Services
CSLB #472017 · Licensed C-7 contractor Workspace with sketches, drafting tools and a notebook

The short answer

Division 27 (Communications) covers structured cabling, backbone, communications pathways, audio-video and distributed communications systems such as paging, clocks and nurse call. Division 28 (Electronic Safety and Security) covers access control, video surveillance and intrusion detection, among other systems. A complete specification names the standard and edition for each system, a basis of design product, the testing and certification requirements and the closeout deliverables. It also assigns pathways and firestopping to one division, to keep the trade boundaries clear.

Key points
Division 27Communications (CSI MasterFormat)
Division 28Electronic Safety and Security
Cabling standardsANSI/TIA-568.2-E copper, TIA-568.3-D fiber
LabelingANSI/TIA-606-C administration standard
Camera procurementNDAA Section 889, 2 CFR 200.216 on federal funds
Pathways and firestopTIA-569, assign firestopping to one division

What Division 27 and Division 28 contain in MasterFormat

CSI MasterFormat is the numbering system that organizes a construction specification. Since the 2004 edition, it has kept low voltage work separate from electrical. Division 26 is Electrical. Division 27 is Communications: structured cabling, network equipment, voice, audio-video and distributed communications systems such as paging, clocks and nurse call. Division 28 is Electronic Safety and Security: access control, video surveillance, intrusion detection and related systems.

The split has a practical purpose. The owner can bid the communications and security work to a low voltage specialist while the electrical contractor bids Division 26, and each contractor gets a document that describes its own scope. It only works if the specifier draws the lines on purpose. A Division 27 section that assumes Division 26 will provide conduit, paired with a Division 26 section that assumes the reverse, leaves you with a pathway nobody priced.

Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We bid Division 27 and 28 scopes across California. The sections below are the ones we see most often on commercial, institutional and multifamily projects, and also the ones we most often find missing.

The sections a commercial low voltage spec should include

This table lists the MasterFormat section numbers that cover a typical commercial project. Not every project needs every section, but every system on the drawings should have a home in one of them.

SectionTitleUse it for
27 05 00Common Work Results for CommunicationsGeneral requirements, coordination, submittal and closeout rules for all of Division 27
27 05 26Grounding and Bonding for Communications SystemsTelecom bonding backbone, busbars, rack bonding per TIA-607
27 05 28Pathways for Communications SystemsConduit, sleeves, tray, J-hooks, surface raceway, firestopping assignment
27 05 53Identification for Communications SystemsLabeling scheme per TIA-606, label materials, record drawings
27 10 00Structured CablingUmbrella section when backbone and horizontal are combined
27 11 00Communications Equipment Room FittingsRacks, cabinets, ladder rack, patch panels, backboards, room finishes
27 13 00Communications Backbone CablingFiber and copper riser between MDF and IDFs, building entrance
27 15 00Communications Horizontal CablingCat6 and Cat6A drops, outlets, patch cords, wireless access point drops
27 21 00Data Communications Network EquipmentSwitches, routers, wireless access points, firewalls when in the contract
27 41 00Audio-Video SystemsConference rooms, classrooms, displays, control systems
27 51 00Distributed Audio-Video Communications SystemsPaging, background music, mass notification audio, CATV distribution
27 52 23Nurse Call and Code Blue SystemsNurse call and emergency call in healthcare and senior housing
28 05 00Common Work Results for Electronic Safety and SecurityGeneral requirements for all of Division 28
28 10 00Access ControlControllers, readers, credentials, door devices, software, integration
28 20 00Video SurveillanceCameras, recording, video management, storage, retention
28 30 00Security Detection, Alarm, and MonitoringIntrusion detection; BSIS licensed alarm company scope in California

Two systems need a note. Intercom and telephone entry don’t have one obvious section. Most specifiers put video intercom under 28 10 00 as part of access control, and put SIP intercoms tied to the phone system under 27 51 00. Wireless access points are usually specified in 27 21 00, with their cabling in 27 15 00. Either way, the specification should say who mounts them and who configures them.

What to require in every section

A section that names a system but not a standard leaves the contractor to decide what “complete and working” means. Every section should cover the same six elements.

Standards: name the edition. For cabling, that’s ANSI/TIA-568.2-E for balanced twisted pair, TIA-568.3-D for optical fiber, TIA-569 for pathways and spaces, TIA-606 for administration, TIA-607 for bonding and grounding, and the California Electrical Code (Title 24, Part 3) Articles 725, 770, 800, 805 and 820 as applicable. The 2025 CEC is based on the 2023 NEC. That edition created Article 722 for power-limited cables and reorganized what’s left in Article 725, so cite article and section numbers from the edition the project is permitted under. Avoid copying them from an older specification. For access control, name UL 294. For nurse call in licensed healthcare, name UL 1069. For cameras on federally funded work, name NDAA FY2019 Section 889 and 2 CFR 200.216.

Products: give a basis of design with model numbers, plus a substitution procedure. Say whether the cabling system has to be a single manufacturer’s end-to-end channel to qualify for an extended warranty. And state the cable jacket rating by location (CMP plenum, CMR riser) instead of leaving it to the mechanical drawings.

Submittals: ask for product data, shop drawings showing rack elevations and pathway routing, a labeling scheme to approve before any label is printed, a test plan, and for cameras, a manufacturer-of-record statement.

Testing: spell out which test, on what, with which tester, and who witnesses it. For copper, that means permanent link or channel certification to the named category with a field tester rated for it: Level III for Cat6 and Level IIIe for Cat6A per ANSI/TIA-1152-A. For fiber, require Tier 1 loss testing at minimum, with Tier 2 OTDR traces where the owner wants them. For access control and cameras, require a point-by-point functional test with a checklist the owner signs.

Labeling: reference 27 05 53 and require every cable, outlet, patch panel port, rack and pathway to carry a unique identifier per TIA-606 that matches the record drawings.

Warranty and closeout: list the installation warranty term, any manufacturer system warranty, test results in native tester format and PDF, as-built drawings in the owner’s CAD or PDF format, and the administrative records (IP addresses, credentials, VLANs, license keys) the owner’s IT staff will need on day one. Our MDF and IDF buildout guide shows what a complete closeout looks like for a network room.

Drawing the line with Division 26 and Division 08

Many change orders on low voltage scopes trace back to two boundaries. The first is power and bonding. Dedicated circuits, receptacles at racks, and the bonding conductor from the telecom busbar to the building electrical service ground are electrical scope under a C-10 license. The Division 27 section should say so, and it should require the communications contractor to show on its shop drawings where its work meets the electrician’s. The Division 26 section should list the telecom rooms and circuit count so the electrician prices them.

The second is the door. Access control readers, controllers, power supplies, door position switches, request-to-exit devices and cabling are Division 28. Electrified strikes, maglocks, panic hardware, closers and automatic operators are Division 08 door hardware. They’re furnished by the hardware supplier and installed by the door hardware installer or a C-28 Lock and Security Equipment contractor. A 28 10 00 section that says “provide a complete access control system” without a hardware schedule cross-referenced to Division 08 invites both contractors to exclude the strike. The fix is a door-by-door matrix, in the specification or on the drawings, that lists every device at each opening and the section that furnishes it.

The California C-7 license guide covers the licensing side of these boundaries.

Gaps that turn into change orders

These omissions come up again and again in the specifications we price. The good news is that each one usually has a short fix.

Pathway scope not assigned. Neither 26 05 33 nor 27 05 28 says who provides the sleeves, tray and J-hooks. Fix: put it in 27 05 28 and reference that section from Division 26.

No labeling scheme. The spec says “label per TIA-606” but doesn’t say whether the owner has an existing scheme, whether room numbers follow the architectural or the facilities numbering, or who approves the scheme. Fix: require a labeling scheme submittal and name the approving party.

No firestopping assignment. Cables pass through rated walls and floors, but nobody is named to seal them. Fix: assign firestopping of communications penetrations to Division 27 (or to Division 07 84 00 with a coordination note), and require listed systems.

No line between Division 26 and 27 on bonding. Fix: state that Division 26 provides the bonding conductor to the busbar, and Division 27 provides the busbar, the backbone and rack bonding per TIA-607.

No NDAA language on cameras. Fix: add the Section 889 and 2 CFR 200.216 requirement, the manufacturer-of-record submittal, and the right to reject rebadged product. Our NDAA camera compliance guide has sample language.

Door hardware split between 08 and 28 without a matrix. Fix: put a door hardware and security matrix on the drawings.

No cable count. The drawings show outlets but no drop count per outlet and no spare requirement. Fix: state the drops per outlet type and a spare percentage at each IDF.

No owner-furnished equipment list. Switches, wireless controllers and cameras the owner buys directly aren’t identified, so each bidder quietly includes or excludes them. Fix: add an OFCI (owner furnished, contractor installed) schedule.

No wireless survey requirement. Access points are placed on plan without a predictive or on-site survey. Fix: require a survey submittal before rough-in.

Pre-bid review checklist for a Division 27 and 28 section

Use this table when you review a Division 27 and 28 specification before it goes out to bid.

ItemWhereCheck
Standards named with editionEvery sectionTIA-568.2-E, 568.3-D, 569, 606, 607; CEC 725, 770, 800, 805, 820; UL 294; UL 1069 where applicable
Cable ratings by location27 13 00, 27 15 00CMP in plenum, CMR in riser, OSP where required
Pathway scope assigned27 05 28Sleeves, tray, J-hooks, surface raceway, and who firestops
Power and bonding handoff27 05 26, Division 26Circuits and bonding conductor in 26; busbar and backbone in 27
Labeling scheme27 05 53Scheme submittal, approving party, label materials
Testing method27 13 00, 27 15 00, 28 10 00, 28 20 00Certification tester level, fiber tier, functional test checklist
SubmittalsEvery sectionProduct data, shop drawings, labeling scheme, test plan, manufacturer of record
NDAA compliance28 20 00Section 889, 2 CFR 200.216, right to reject rebadged product
Door hardware matrix28 10 00, Division 08Every device at every opening assigned to a section
Intrusion and monitoring28 30 00Assigned to a BSIS licensed alarm company, not bundled into C-7 scope
Owner-furnished equipment27 21 00, 28 20 00OFCI schedule with who receives, stores and configures
Drop counts and spares27 15 00Drops per outlet type, spare percentage per IDF
Wireless survey27 21 00Predictive or on-site survey submittal before rough-in
WarrantyEvery sectionInstallation term plus any manufacturer system warranty by name
Closeout27 05 00, 28 05 00Test results, as-builts, admin records, training
Occupied building provisions27 05 00, 28 05 00Phasing, notice, cutover sequence if the building is in use

On an occupied renovation, that last row matters as much as any of the others. Our occupied building guide explains what the specification should say about phasing and cutover.

Next step

If you’re writing or reviewing a Division 27 or 28 specification for a California project, send us the draft through request a bid or the for general contractors page. We’ll mark the gaps we’d expect to show up later as RFIs or change orders, and we’re happy to return comments in the same format as this checklist.

FAQ

Questions we hear about this

Do I need both Division 27 and Division 28 sections on a small tenant improvement?

If the project has both cabling and a security system, yes, even if each one is only a few pages. A short 27 15 00 for horizontal cabling and a short 28 10 00 or 28 20 00 for the security scope is enough. What matters is that each one names a standard, a product basis, a testing requirement and a closeout deliverable.

Link to this answer
Which division should carry the conduit and cable tray for low voltage systems?

Either works, as long as it's stated once. Most California commercial projects put the raceway, sleeves, tray and J-hooks in 27 05 28 so the communications contractor owns the pathway its cable depends on. If Division 26 carries it instead, the Division 27 section should say so and reference the section number.

Link to this answer
How do I keep white label cameras out of a publicly funded project?

In 28 20 00, state that video surveillance equipment must comply with NDAA FY2019 Section 889 and 2 CFR 200.216. Require the submittal to identify the actual manufacturer rather than the brand on the label, and reserve the right to reject rebadged equipment. That language helps catch the problem at submittal review instead of at a funding audit.

Link to this answer
What warranty should a cabling specification require?

A one year installation warranty from the contractor is standard. Many owners also require the manufacturer's extended system warranty, commonly 20 to 25 years on the components and application performance. It's available when the installer is enrolled in that manufacturer's program and uses its end-to-end channel. If you want the extended warranty, say so in the spec and name the program.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Ready to apply this to a real building?

Send over the drawings or describe the scope. We'll tell you what we'd take on, what we'd coordinate with other trades and what it will take to do it right.