- Cisco Meraki
- Yealink
- ButterflyMX
- DoorKing (DKS)
We aren't tied to any brand. If your drawings call for something else, we'll install to the specification.
What our service work covers
Most systems keep changing after turnover. Staff move, tenants change, a camera gets hit by a delivery truck, a reader fails, or a platform pushes a firmware update that changes a setting. Service and maintenance means keeping cabling, network, camera, access control, intercom, nurse call, phone and Wi-Fi systems working and documented after the project closes.
We service the systems we installed and systems installed by others. Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. The same technicians who do our project work handle our service work. On a construction project, service is typically written into Division 27 05 00 as a warranty or maintenance period.
Moves, adds and changes on cabling and network systems
Moves, adds and changes (MAC work) are the most common service requests. A new workstation needs two data drops, a conference room is being split into two offices, an access point is going in over a new break room, or a camera is moving to cover a new door. It’s the same work as our projects on a smaller scale, and we do it to the same standard.
New drops go in the existing pathways where there’s capacity, or on new J-hooks where there isn’t, with plenum or riser cable to match the space. Each new link is terminated, certified to ANSI/TIA-568.2-E with a calibrated tester, and labeled in the building’s existing scheme per ANSI/TIA-606. We update the patch panel record and the drawing, so the new drop is on record for the next person who needs to find it. On a floor that’s in use, we schedule the work for hours that suit the tenant and leave each space clean at the end of the visit.
We also handle network changes on the switching and wireless platforms we support, such as a VLAN for a new device type, a switch port configuration for a relocated printer, or a new SSID for a tenant. On Cisco Meraki installations, most of that is a dashboard change we make remotely and then confirm on site.
Troubleshooting: finding the cause behind the symptom
A troubleshooting call starts with a symptom. A camera is offline, a door won’t unlock from the lobby panel, a floor’s phones drop calls in the afternoon, or one office has no network. Our job is to find the cause, fix it, and tell you what it was.
We work from the physical layer up. First we check for link, then for power on the port and how much the switch is really delivering. Next we see whether the cable passes a certification test and whether the device reaches its controller or its cloud platform. We only look at configuration once the physical layer checks out. A large share of “the camera is broken” calls turn out to be a damaged patch cord, a PoE budget that got exceeded when someone added a device, or a port disabled by a security setting. Many “the Wi-Fi is slow” calls turn out to be a channel change on a neighbor’s network or an uplink that never got the speed it was designed for.
We carry certification testers, PoE testers, fiber test sets and the tools to reterminate copper and fiber. We report what we found in writing, with the test results, so the next technician doesn’t have to start from scratch.
Camera, reader and device replacement
Devices fail, and sometimes they get damaged. We replace security cameras, card readers, door controllers, intercom panels, nurse call stations, wireless access points and IP phones with the same model if it’s still available. If it isn’t, we use a current model that fits the existing platform.
When we replace a camera, that covers the mount, the cable termination, and the configuration on the recorder or cloud platform. We also set the field of view to match the original and confirm it’s recording. If a property is federally funded or the owner has a policy against covered equipment, we confirm the replacement camera isn’t from a manufacturer barred under NDAA Section 889 and we document the actual manufacturer. That matters because many white-label cameras are relabeled Hikvision or Dahua. Our guide to NDAA compliant cameras explains how to check.
Replacing a reader or controller on an access control system includes configuring the credential format, the door schedule and the inputs to match the original, then testing at the door with the owner’s actual credentials. We handle the controller, the power supply, the reader and the wiring out to the hardware. If the electrified hardware itself has failed (a strike or a maglock), that replacement comes from the owner’s door hardware contractor or a licensed C-28 contractor, and we test the opening with them once it’s hung.
Firmware, platform updates and cloud-managed systems
Cloud-managed systems push firmware and platform updates on a schedule the manufacturer sets. We install and configure Cisco Meraki and ButterflyMX directly. Ubiquiti is commonly specified on buildings we’re asked to service, and we maintain it to the manufacturer’s documentation. Most of the time automatic updates are a good thing, because security patches arrive without a truck roll. Sometimes, though, an update changes a default, retires a feature, or requires a license renewal, and the building finds out when something stops working.
Our maintenance work includes reviewing pending updates for the platforms we support and scheduling them for a maintenance window instead of a weekday morning. We confirm the systems after each update and track the license and subscription renewals a cloud platform needs to keep running. For on-premise systems such as a local video recorder, an access controller, a DoorKing telephone entry system or an IP PBX, we apply manufacturer firmware on a schedule and keep a record of the versions in service. When a platform reaches end of support, we tell you ahead of time and lay out the replacement options. That way you can decide before the platform stops getting security updates.
Service agreements and response expectations
A service agreement puts the work above under a contract with a defined scope, a defined response expectation and a defined price. We write agreements for owners, property managers and IT directors who want one contractor responsible for the low voltage systems in a building or a portfolio.
A typical agreement includes:
- Scheduled preventive maintenance visits: camera cleaning and focus check, access control door test, nurse call station test, UPS and switch health check, patch panel and rack inspection, and a labeling and documentation review.
- Response to service calls based on the expectation written into the agreement, starting with remote diagnosis where the platform allows it.
- Firmware and platform update management, as described above.
- Moves, adds and changes at agreed labor rates, or a block of hours per year.
- An updated documentation set at the end of each year.
An agreement can cover one building or many, and one system or all of them. We inspect systems we didn’t install first, so the agreement covers a known condition instead of an unknown one. Owners of occupied multifamily and senior housing, such as the properties at Little Tokyo Towers and Horton House, also need service visits into units to be noticed and scheduled through property management, and we write that into the agreement.
Response expectations and how we communicate
Each service agreement spells out the response expectation, based on how critical the system is and the terms of the agreement rather than one published number for every client. A nurse call system in senior housing and a conference room display just aren’t the same kind of call. When something goes wrong on a system residents or staff depend on for safety, such as nurse call or an access controlled egress door, we start with remote diagnosis before a truck is dispatched, so the technician has a better idea of what to bring. Routine requests get scheduled with you at a time that suits the building.
Every call is logged with the time received, the symptom, the cause we found, the fix and the parts used. You get that record after each visit. The agreement also includes a periodic summary, so you can see which systems are generating calls and decide whether replacing something makes more sense than continuing to repair it.
Documentation updates and systems we didn’t install
Documentation is the part of service work that most often gets skipped, and it can save real money on the next project. After every service visit that changes the system, we update the affected record: the cable schedule and patch panel record for a new drop, the camera schedule and coverage map for a moved camera, the door schedule for a reader change, and the extension list and E911 location table for a phone move. If the building has no documentation, we build it as we go, starting with the rooms and systems we touch.
Supporting a system we didn’t install starts with an assessment visit. We inspect the rooms, test a sample of links, inventory the devices and platforms, and identify what’s undocumented and what’s at end of support. Then we give you a written condition report with recommendations. Some of what we find is easy to fix: a rack with no labels, patch cords with no managers, a switch with no PoE budget left. Some of it is a design problem that will need a project. Either way, you get a clear picture before you sign an agreement, and we take on the system knowing what it is. Our structured cabling and network room buildout pages describe the standard we bring existing systems up to over time.
Next step
Tell us about the building, the systems and the problem, or the agreement you have in mind, through request a bid, and we’ll schedule an assessment visit or a service call. If you manage several buildings, send the portfolio list and we’ll propose one agreement that covers them. General contractors who need a warranty period or a maintenance scope written into a project can find our process on the for general contractors page.