CSLB #472017, C-7 Low Voltage Systems

Compliance · 9 min read

The California C-7 Low Voltage License Explained: Scope, Exclusions, and How to Verify One

Before you award low voltage work, it's worth confirming the bidder is properly licensed. Estimators, owners, IT directors and facility managers can use this guide to see what the C-7 classification allows under 16 CCR 832.07, where C-10, C-28 and BSIS alarm licensing take over, and how to read a CSLB license record.

Published
September 12, 2026
By
Telelink Business Services
CSLB #472017 · Licensed C-7 contractor Columns and dome of the California State Capitol

The short answer

The California C-7 Low Voltage Systems classification, defined at 16 CCR 832.07, covers energy limited communication and low voltage systems not exceeding 91 volts. The regulation names telephone, sound, cable television and closed-circuit video systems among others, and its list isn't exhaustive, so structured cabling and access control cabling are commonly installed under it. Line voltage electrical work needs a C-10, and selling, installing or monitoring burglar and intrusion alarm systems is regulated separately under the Alarm Company Act, which requires a BSIS Alarm Company Operator license. A C-7 license can be verified at cslb.ca.gov under Check a License.

Key points
Regulation16 CCR 832.07, Class C-7 Low Voltage Systems
Voltage limitEnergy limited, not exceeding 91 volts
Over the limitLine voltage work is C-10 electrical scope
Unlicensed thresholdUnder $1,000, no permit, no employees (B&P 7048)
Verify atcslb.ca.gov, Check a License
TelelinkCSLB #472017, C-7 Low Voltage Systems

What the C-7 classification covers under 16 CCR 832.07

The Contractors State License Board defines every specialty classification in Title 16 of the California Code of Regulations. Section 832.07 covers the Class C-7 Low Voltage Systems Contractor. The regulation describes a contractor who installs, services and maintains communication and low voltage systems that are energy limited and do not exceed 91 volts. It then lists the systems by name: telephone systems, sound systems, cable television systems, closed-circuit video systems, satellite dish antennas, instrumentation and temperature controls, and low voltage landscape lighting.

That list is illustrative rather than exhaustive, because the regulation says the systems “include, but are not limited to” the ones named. So in practice, a C-7 covers the work a general contractor’s Division 27 and Division 28 subcontractor does on a commercial building. That includes structured cabling for data and voice, fiber optic backbone, wireless access point cabling and mounting, video surveillance, card and mobile credential access control, video intercom and telephone entry, nurse call and emergency call in senior housing, paging and background sound, audio-visual cabling, and CATV distribution in multifamily buildings.

The 91 volt figure comes straight from the regulation, and it matters when a scope starts to drift. Power over Ethernet at 802.3bt levels, 24 VDC lock power, 12 VDC camera power and Class 2 control circuits all sit inside the limit. A 120 VAC receptacle for a rack or a dedicated circuit for a UPS doesn’t.

Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We’ve been in business since 1983. Our current bond, insurance and workers’ compensation certificates come with the prequalification packet, and they’re summarized on our licenses and certifications page.

What C-7 does not cover: line voltage and alarm monitoring

The first limit is line voltage. Anything above the energy limited threshold is electrical scope. On a typical network room buildout, that means the dedicated circuits, receptacles, panel work, and bonding the room’s busbar to the building electrical service ground. A C-7 contractor can specify what it needs and show on the drawings where its work stops and the electrician’s starts, but a C-10 performs that work.

The second limit isn’t in the CSLB regulation at all. It comes from the Alarm Company Act, Business and Professions Code section 7590 and following, which is administered by the Bureau of Security and Investigative Services (BSIS). Under that act, a person who installs, maintains, alters, sells on premises, monitors or services alarm systems for compensation is an alarm company operator and must hold an ACO license. Cameras and access control are installed under the C-7 classification. Burglar and intrusion alarm work and alarm monitoring require a BSIS Alarm Company Operator license. We don’t offer that work, and we refer it to a licensed alarm company.

How C-7 compares to C-10, C-28, and a BSIS alarm license

These are the four licenses that get confused most often on a low voltage bid list. The descriptions are general, and the regulation text for each classification is on the CSLB website.

LicenseIssued byTypical scope on a commercial projectNot covered
C-7 Low Voltage SystemsCSLBStructured cabling, fiber, wireless cabling, CCTV, access control, intercom, nurse call, sound, AV, CATVLine voltage, alarm monitoring
C-10 ElectricalCSLBPower distribution, panels, dedicated circuits, lighting, and low voltage work when the contractor chooses to self-perform itNothing by voltage; scope is a business decision
C-28 Lock and Security EquipmentCSLBDoors and door assemblies, locks, panic and fire rated exit devices, closers, electrified hardware, and electronic access control equipmentAlarm monitoring
BSIS Alarm Company OperatorBSISSelling, installing, servicing and monitoring burglar and intrusion alarm systemsConstruction trades work that requires a CSLB license

Two things in the table shape most Division 28 scopes. First, access control appears under both C-7 and C-28, and the split is usually drawn at the door. We provide the controllers, readers, power supplies, door position switches, request-to-exit devices, cabling and the head end. The electrified strike, maglock, panic device and automatic operator are coordinated with the GC’s Division 08 hardware scope or performed by a licensed C-28 contractor. Second, a C-10 can legally perform almost anything on the low voltage side, so a GC sometimes bundles it. In that case, the estimator’s question is whether the bidder will certify the cabling, label to TIA-606 and deliver test results.

The $1,000 exemption in B&P 7048 and commercial work

Business and Professions Code section 7048 exempts small jobs from the license requirement. As amended by AB 2622, effective January 1, 2025, the exemption applies when the aggregate contract price for labor, materials and everything else is less than $1,000, the work does not require a building permit, and the person doing the work does not employ anyone else to perform or assist with it. Before 2025 the figure was $500 and there was no permit or employee condition.

The statute also closes the obvious loophole. The exemption doesn’t apply where the work is part of a larger operation that’s being divided into contracts under $1,000 to evade the license law, and it doesn’t apply to anyone who advertises as a contractor.

On a commercial project, the exemption is rarely available. Any low voltage subcontract of practical size exceeds $1,000, most work through a rated wall requires a permit, and a crew means employees. If a bidder tells you the license doesn’t matter because the work is “minor,” treat that as a reason to check the CSLB record, not as an exemption.

How to verify a contractor license on cslb.ca.gov

The CSLB Check a License tool at cslb.ca.gov takes a license number, a business name or a personnel name and returns the public record. It’s worth making that record part of each bid tabulation. Here are the fields to check:

Field on the CSLB recordWhat to confirm
License statusReads Active. Not Expired, Suspended, Inactive or Canceled.
Expiration dateLater than your planned completion date, or budget for a renewal check.
Business name and entityMatches the name on the bid exactly, including any DBA shown on the record.
ClassificationsIncludes C-7 for low voltage, and C-10 if the same firm proposes to perform power.
Contractor’s bondOn file and active with a surety. The amount required by CSLB is currently $25,000.
Workers’ compensationA policy with carrier and dates. An exemption on a firm that will put a crew on your site is a problem.
PersonnelThe qualifying individual and any officers, so you know the person you’re dealing with is connected to the license.
Complaint disclosureAny legal action or citation CSLB is permitted to disclose.

Public works adds a second lookup. Labor Code section 1725.5 requires contractors and subcontractors on public projects to be registered with the Department of Industrial Relations, and the DIR maintains a public registration search. We include our DIR registration and current certificates in the prequalification packet.

License numbers in advertising and bids: B&P 7030.5

Business and Professions Code section 7030.5 requires every licensed contractor to include its license number in all construction contracts, subcontracts and calls for bid, and in all forms of advertising. So a legitimate bid, proposal, business card, truck and website should all show the number. CSLB treats a missing number in advertising as a violation, and an unlicensed person who advertises as a contractor faces separate penalties.

For a buyer, that makes a simple test. If a proposal arrives with no license number, ask for it before you read the price. If the number doesn’t match the CSLB record for that business name, sort that out before going further.

What happens when an unlicensed contractor does the work: B&P 7031

Section 7031 is how the license law gets enforced, and it works on the contract rather than only on the contractor. In general terms, a contractor who was not duly licensed at all times during performance of work that requires a license cannot bring or maintain an action to collect payment for that work. Separately, a person who paid an unlicensed contractor may bring an action to recover all compensation paid for the work. Courts apply these rules strictly. The substantial compliance exception is narrow, and it doesn’t help a contractor who was never licensed.

For an owner or GC, the consequences run both ways. Hiring an unlicensed low voltage sub can expose the project to an installation with no enforceable warranty, to insurance gaps if someone is injured, and to a compliance finding on a publicly funded job. The owner may have a claim to recover payments, but they may also be left with an uncertified cabling plant that nobody stands behind. Checking the license up front costs almost nothing by comparison.

Red flags on a low voltage bid

These are the patterns we see most often when a GC forwards a competing proposal and asks why the numbers are so different.

  • No CSLB license number anywhere on the proposal, or a number that returns a different business name.
  • A license in a different classification, such as a C-61 limited specialty, offered for a full Division 27 scope.
  • Intrusion alarm or alarm monitoring listed as included in a C-7 proposal with no separate BSIS licensee named.
  • Power, dedicated circuits or panel work included in a C-7 proposal with no C-10 named.
  • Workers’ compensation shown as exempt, but the proposal describes a crew.
  • No mention of certification testing, labeling standard or as-built documentation, which usually means those items aren’t priced.
  • A request for a large deposit before mobilization, or a price so far below the field that the material alone couldn’t be covered.

None of these proves a bidder is unlicensed, but each one is worth a phone call before award. The Division 27 and 28 specification checklist covers how to write the scope so these gaps are easier to spot during bidding instead of during construction. Our safety and compliance page lists the documents in our prequalification packet.

Next step

If you’re qualifying low voltage bidders for a commercial, institutional or multifamily project in California, you can add us to the list through request a bid. We’ll send back a proposal with the license number, classifications, insurance summary and scope exclusions spelled out on the first page. General contractors can find our prequalification documents and standard scope splits on the for general contractors page.

FAQ

Questions we hear about this

Does a C-7 contractor need a separate license to install security cameras?

No. Closed-circuit video systems are named in the C-7 regulation text, so a C-7 licensee can install cameras, recorders and the cabling that serves them. The line is crossed only when the system is sold or monitored as a burglar or intrusion alarm, which brings in the BSIS Alarm Company Operator requirement.

Link to this answer
Can a C-10 electrical contractor do low voltage work without a C-7?

In practice, a C-10 electrical contractor does a great deal of low voltage work, because the C-10 classification covers electrical wiring and equipment broadly. It doesn't work the other way: a C-7 licensee can't pull line voltage circuits or land on a panel. On a commercial project, the cleanest arrangement is a C-10 for power and bonding and a C-7 for the communications and security systems.

Link to this answer
Does a subcontractor on a public works job need its own license if the GC is licensed?

Yes. Each contractor performing work that requires a license must hold the appropriate classification in its own name. A GC's license doesn't extend to its subcontractors, and public agencies routinely check subcontractor license numbers on the list submitted with the bid.

Link to this answer
What does an expired or suspended license status mean on the CSLB record?

Expired means the renewal wasn't filed, and the contractor can't legally contract for work requiring a license until it's renewed. Suspended usually points to a lapsed bond, a lapsed workers' compensation certificate, an unpaid judgment or a disciplinary action. Either status should stop an award until it's resolved and the record shows Active.

Link to this answer
Does the C-7 license cover nurse call and intercom systems?

Nurse call, intercom, paging and sound systems are low voltage communication systems, so they sit inside the C-7 scope. Where the door hardware itself has to be replaced or electrified, that portion is coordinated with the Division 08 hardware supplier or a C-28 Lock and Security Equipment contractor.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Ready to apply this to a real building?

Send over the drawings or describe the scope. We'll tell you what we'd take on, what we'd coordinate with other trades and what it will take to do it right.