The short answer
To choose a low voltage contractor in California, start by verifying an active C-7 (or C-10) license at cslb.ca.gov and confirming that the $25,000 bond and general liability are current. Check the CSLB record to see whether workers compensation is carried or an exemption is claimed. Ask whether the contractor self-performs or brokers the labor, ask for certified test results and labeled as-builts at closeout, and check references on a similar building type. On public works, confirm DIR registration. On federally funded buildings, confirm NDAA compliant cameras.
| License to look for | C-7 Low Voltage Systems (or C-10 Electrical) |
|---|---|
| Verify at | cslb.ca.gov, Check a License |
| Bond on record | $25,000 contractor license bond |
| Workers comp | Required for every licensee from January 1, 2028 |
| Public works | DIR registration required to bid |
| Federally funded | NDAA Section 889 compliant cameras |
Start with the license, because everything else depends on it
California requires a state contractor license for almost every commercial low voltage job. The small work exemption is capped at $1,000 in labor and materials, and it doesn’t apply when a permit is required or the contractor has employees. That rules out nearly any commercial project. The classification you want to see is C-7 Low Voltage Systems, which covers communication and low voltage systems that don’t exceed 91 volts: structured cabling, telephone, CATV, CCTV, sound, intercom and the low voltage side of access control. A C-10 Electrical contractor is also licensed to do this work.
You can verify the license at cslb.ca.gov. Open Check a License and search by license number or business name. The record shows the classification, whether the license is active, the bond amount, the workers compensation carrier and policy dates, the personnel on the license, and any disciplinary history. While you’re there, confirm two things. First, make sure the classification covers the scope you’re buying. Neither a C-7 nor a C-10 can sell or monitor burglar alarms without a separate license from the Bureau of Security and Investigative Services. Second, check that the business name on the bid matches the name or the DBA on the record. Bidding under a DBA is normal, but the names should line up.
Hiring an unlicensed contractor in California is more than a paperwork problem. Under Business and Professions Code section 7031, an unlicensed contractor can’t sue to collect payment, and an owner can recover everything already paid. Your general liability carrier will ask about the license too, as will your funding agency on funded projects. It’s the right question to ask first.
Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We’ve been in business since 1983. Our C-7 license explainer goes into more detail on what the classification covers and excludes.
Confirm the bond, the insurance and the workers comp
Every active California contractor carries a $25,000 contractor license bond, which has been the statutory amount since January 1, 2023. The bond protects you if the contractor violates the license law. It isn’t project insurance. For that, you want two certificates.
General liability insurance covers damage the contractor causes to your building or to a third party. On commercial work, $1,000,000 per occurrence is the common floor, and $2,000,000 is typical for contractors who work under general contractors. Ask for a certificate that names your entity as additional insured with a primary and noncontributory endorsement, plus a waiver of subrogation if your contract requires it.
Workers compensation is mandatory for any contractor with employees. Since January 1, 2023 a handful of classifications (C-8, C-20, C-22 and D-49) have had to carry it whether or not they report employees, and SB 1455 extends that to every active license on January 1, 2028. Until that date, a sole owner working without employees can still file a valid exemption. So the real question is whether the exemption on file matches the crew that will be on your site. The CSLB record shows the carrier and policy dates, or the exemption. Ask for the certificate. If a bidder claims an exemption while proposing a four-person crew, that’s a discrepancy worth raising.
If you want a checklist to hand every bidder, the for general contractors page lists what a complete prequalification packet contains.
Ask who is actually doing the work
The answer to this question changes what you’re buying. Some low voltage companies install with their own technicians. Others sell the job, hand the labor to a subcontractor or a staffing firm, and then put their name on the closeout. Both are legal. With a self-performing contractor, the crew reports to the person who bid the job, and the company signs its own test results.
Just ask: “Are the technicians on this job your employees?” If the answer is no, ask who they are, what license and insurance they carry, and who’s responsible when something fails at turnover. A contractor who self-performs will usually say yes without hedging.
On our jobs, the technicians who show up are our own employees. The crew reports to the people who bid and scheduled the job, and the company that signs the test results and the labor warranty is the same company that did the work. The scopes described in our project case studies were installed by those crews.
Check experience on your building type, not just your system type
A contractor who has pulled a thousand Cat6 drops in empty office shells may never have worked in an occupied senior housing building, with residents in every unit and a nurse call system that can’t go dark overnight. What’s different there is the sequencing, the resident notice and the cutover plan, and the schedule depends on all three.
Ask for references on your building type, and then call them. Good questions to ask: Did the crew keep the schedule? How did they handle residents, staff or students in the building? Was the closeout documentation complete the first time it was delivered? Would you put them on your next bid list? If a bidder can’t name a project in your building type, that tells you something, and it matters more on an occupied building than on an empty shell.
If your project is one of the building types we work in most, our markets pages explain what changes for each one: multifamily and affordable housing, senior living, government and public works, education, healthcare, office tenant improvement and industrial.
Compare scope before you compare price
It’s easy to make a low voltage bid cheap by leaving things out. So before you look at the numbers, line the proposals up by what they include. A complete proposal for a cabling or systems job in a commercial building will spell out, in writing:
- The specification sections or systems covered, and the ones excluded.
- Cable category and rating (plenum or riser), connector and jack types, and the manufacturer or an “or equal” statement.
- Pathways: who provides conduit, sleeves, J-hooks, cable tray and firestopping at rated penetrations.
- Testing: permanent link certification for every copper drop and Tier 1 (and Tier 2 where specified) testing for fiber, with the results delivered to you.
- Labeling to a stated scheme, and as-built drawings at closeout.
- Where the low voltage work stops and the electrician’s starts: power to racks, dedicated circuits and the bond to building ground are the electrician’s work.
- On access control jobs, where the door hardware scope begins: electrified locks and strikes are Division 08 or a C-28 contractor.
- Warranty terms for labor and for the manufacturer system, if a certified system warranty is offered.
- Schedule assumptions, including after hours work and phasing in an occupied building.
If a bid is silent on any of these, ask about it. A bid that doesn’t state its exclusions is hard to compare fairly with one that does. Our Division 27 and 28 spec checklist is written for the people writing the spec, but it also works well as a bid comparison sheet.
Make sure testing and documentation are in the proposal
Testing and labeling are a big part of what separates a cabling plant you can maintain from one that keeps producing intermittent faults. Every copper permanent link should be certified with a calibrated tester, and you should get the actual results, not a summary in an email. Every fiber strand should be tested with a light source and power meter at minimum, with OTDR traces where the spec calls for them. And every cable, jack, patch panel port and rack should carry a label that matches the drawings.
Ask what the closeout package includes. A good answer covers test results, labeled as-builts, an equipment schedule with serial numbers and warranty paperwork. For cameras, access control, intercom and phones, it should also include a configuration export and the administrator credentials. If any of that is missing from the proposal, it’s likely to be missing at the end of the job, and your IT team or your next contractor ends up paying for it.
Watch for the situations that need a specialist
A few project types come with rules that a general “we do everything” contractor may not know.
Public works and prevailing wage. If a public agency is paying, the contractor must be registered with the California Department of Industrial Relations (DIR) to bid or work, must pay prevailing wage, and must file certified payroll. Ask for the DIR registration number and check it on the DIR website. A contractor who doesn’t know what DIR registration is probably isn’t ready for a public bid list. Our government and public works page covers how we handle it.
Federally funded buildings and cameras. HUD-funded housing, federally funded schools and clinics, and many grant funded projects fall under NDAA Section 889 and 2 CFR 200.216, which prohibit video surveillance equipment from Hikvision, Dahua, Huawei, ZTE and Hytera. That includes white label cameras built on those platforms. It’s worth having the contractor name the actual manufacturer of each camera and recorder and document it in the submittal. Our NDAA compliant cameras guide explains how to check.
Occupied buildings. When residents, patients, staff or students are in the building, the schedule, the notification requirements, the access rules and the cleanup standard all change. Ask how the contractor will phase the work and what a resident or tenant notice looks like. Our occupied building guide shows what a workable plan includes.
Red flags that show up before award
| What you see | Why it matters |
|---|---|
| No license number on the proposal, website or truck | California requires the number in all advertising. If it’s missing, that’s either an oversight or a problem. |
| A “fully licensed” or “fully insured” claim with no number or certificate | A claim isn’t a document. Ask for the license number and the certificates. |
| Alarm monitoring listed under a C-7 license alone | Alarm monitoring needs a BSIS license. Ask what other license covers it. |
| Testing or labeling not mentioned | It often doesn’t happen unless it’s in writing. |
| Can’t name the camera manufacturer on a federally funded job | NDAA compliance requires knowing the actual OEM behind the brand on the box. |
| No DIR registration on public work | The contractor can’t legally bid on, be listed on or perform the work. |
| Vague about who performs the labor | Brokered labor is legal, but you should know about it going in. |
| Significantly below every other bid | Something is usually missing. It’s worth finding out what before you sign. |
None of these automatically rules a bidder out, but each one deserves a direct question and a written answer.
Questions to ask on the first call
Ask these before you compare numbers:
- What’s your license number and classification? (Then look it up.)
- Are the technicians on this job your employees?
- Have you done this scope in this building type? Can I call two of those owners or GCs?
- What’s excluded from your proposal, and who handles those items?
- Do you certify every cable and deliver the results?
- What does your closeout package include?
- Are you registered with DIR? (Public work only.)
- Which camera and recorder manufacturers are you proposing, and are they NDAA compliant? (Federally funded work only.)
- Who’s my point of contact from bid through closeout?
- How do you handle work in an occupied building?
A contractor who’s done this work before should have answers to all ten, with documents to back them up.
Next step
If you’re putting together a bid list for a commercial or institutional project in California, we’d like to be on it. Send the drawings and spec sections through the request a bid page, or ask for our prequalification packet on the for general contractors page. You’re welcome to check everything in this guide against it.