CSLB #472017, C-7 Low Voltage Systems

Areas we serve

Low Voltage Contractor Serving Los Angeles and Southern California

We work with general contractors, affordable and senior housing owners, property managers and facilities teams on projects in Los Angeles County and the surrounding counties. Our reference project here is the Little Tokyo Towers renovation in downtown Los Angeles.

Delivered here
Little Tokyo Towers, Los Angeles

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor Looking up at the downtown Los Angeles high rise core against a clear sky
Working in this region
CrewsAssigned in multi-day windows to the GC's phasing
PermittingLADBS express permit for voice and data wiring
Prevailing wageDIR county determinations, certified payroll
LaborPLA and union requirements addressed at bid
ProofLittle Tokyo Towers, occupied multifamily renovation
LicenseCSLB #472017, C-7 Low Voltage Systems

How we run Los Angeles and Southern California projects

A dedicated project manager runs each Southern California job from bid review to closeout. Crews are assigned to the project for defined windows that line up with the GC’s phasing, and mobilization is priced into the bid up front. That approach suits the work we’re usually asked to bid here, which is multi-week renovation scope in occupied buildings. It’s not a good fit for one-off service calls.

ItemHow it’s handled on a Southern California project
Crew assignmentDefined multi-day windows matched to the GC’s floor-by-floor phasing
Project managementOne manager from bid review to closeout, on site during each crew window
MobilizationA line item in the bid, priced up front
StagingA room the property manager assigns on the floor being worked
Best fitOccupied multifamily and senior housing rehabs, multi-week renovation scope
Poor fitSingle-visit service calls

For us, this region covers Los Angeles, Orange, Riverside, San Bernardino and Ventura counties. A downtown high-rise, a garden-style property in the Inland Empire and a campus in Ventura County don’t share traffic, permitting or labor rules, so we bid them as different jobs.

LADBS permits and the surrounding building departments

Inside the City of Los Angeles, the Department of Building and Safety (LADBS) is the authority. LADBS treats communication and Class 2 signaling circuits as permitted electrical work once they pass a modest voltage and power threshold set in the Los Angeles Municipal Code. In practice, that means most commercial cabling, camera, access control and Wi-Fi scopes carry an electrical permit.

JurisdictionPermitting authorityPath for the low voltage scope
City of Los AngelesLADBSVoice and data wiring is on the express permit list, pulled online by a licensed contractor without plan check; larger scopes are inspected under the project’s electrical permit
Unincorporated Los Angeles CountyCounty Department of Public Works, Building and Safety DivisionCounty counter and county inspectors, separate from the city
Long Beach, Pasadena, Glendale, Burbank, Santa Monica, TorranceEach city’s own building departmentWhether a separate low voltage permit is required is confirmed job by job
Anaheim, Irvine, Santa AnaOrange County city building departmentsOwn portals and inspection scheduling
Riverside, San BernardinoInland city or county building departmentsOwn portals and inspection scheduling
Oxnard, Ventura, Thousand OaksVentura County city building departmentsOwn portals and inspection scheduling

During bid review, we confirm whether our work rides on the GC’s permit or needs its own, and we write the answer into the scope letter.

LADBS and the surrounding jurisdictions check the same things on inspection: firestopping at rated penetrations, plenum-rated cable in return air plenums, support and pathway fill, and separation from line voltage. High-rise work brings extra attention to riser penetrations and rated shaft walls, and that matters in the downtown building stock.

Occupied multifamily in dense urban buildings

A large share of the low voltage work we’re asked to bid in Los Angeles is renovation of occupied multifamily buildings. These are affordable and senior housing rehabs with HUD, LIHTC or city funding, where residents stay in place while the building is upgraded around them. Little Tokyo Towers, in the Little Tokyo neighborhood of downtown Los Angeles, was that kind of project.

Occupied multifamily work comes with rules a vacant building doesn’t have:

  • Resident notification goes out on the owner’s schedule, in the languages residents read
  • In-unit work happens in a posted window with the property manager’s staff involved
  • Material moves are scheduled off peak hours, with a freight or service elevator reserved where one exists
  • Corridors stay clear, ceilings are closed at the end of each shift, and cable isn’t left in a hallway
  • The existing entry and camera systems stay in service until the new ones are installed and tested

Federal funding brings NDAA Section 889 and 2 CFR 200.216 into the camera and network specification. That rules out Hikvision, Dahua and equipment they manufacture under other brand names, so we document the actual manufacturer of every camera and switch on the submittal. Our multifamily and affordable housing market page and occupied building phasing guide walk through how we approach this work.

Prevailing wage and labor requirements in Southern California

Public work and publicly funded housing in the region are prevailing wage work under Labor Code 1720 and following. The Department of Industrial Relations publishes general prevailing wage determinations by county and classification, and updates them twice a year. Southern California classifications have different names than the ones in the northern counties.

Where the work isWage determination pricedIBEW jurisdiction
Los Angeles CountySound Installer for low voltage scope, Inside Wireman where the work crosses into electricalLocal 11
Orange, Riverside, San Bernardino and Ventura countiesEach county carries its own determination, read on the bid dateA separate local for each county
HUD-funded housing anywhere in the regionFederal Davis-Bacon alongside the state determination, with the higher rate governing per classificationSame as the county

Public projects require DIR contractor registration under Labor Code 1725.5, apprenticeship compliance under Labor Code 1777.5, and electronic certified payroll. Registration and current certificates are in the prequalification packet. Project labor agreements are common on public work in the region, including school district, county, city and transit projects. Some publicly funded housing owners and private owners have labor requirements as well. We price and answer each of those at bid time, and our scope letter lays out where we stand before award.

Downtown loading, parking and staging

Free curb parking for a work truck is hard to find in downtown Los Angeles. Little Tokyo sits between the Civic Center and the Arts District, on streets with metered curb, posted loading zones and heavy pedestrian traffic. An occupied multifamily rehab doesn’t have an on-site yard either. So material is delivered to the building’s loading area in a scheduled window, taken up in the reserved elevator, and staged on the floor being worked in a room the property manager assigns. Any curb, lane or sidewalk use beyond a posted loading zone needs a city permit, which the GC typically holds. Crews park in a paid structure or lot, and that cost is in the bid.

We also plan around freeway traffic. We schedule crews to arrive before the morning peak on the 5, the 10, the 101 or the 110, deliveries are timed around it, and demobilization is scheduled before the afternoon peak. Parking, staging and permit costs are line items in our bid.

Little Tokyo Towers: what we delivered

Little Tokyo Towers was a multifamily renovation in an occupied downtown building. Our scope was property-wide Wi-Fi, CATV distribution to the units, surveillance cameras and access control. We phased the work by floor and by area around the residents and coordinated it with the GC’s renovation schedule. At cutover, the existing entry and camera systems stayed in service until the new ones were tested. The project page has the full write-up, and the CATV and MDU distribution and wireless networks service pages explain how those systems are designed for a multifamily building.

Counties and cities we cover

CountyCities we cover
Los AngelesLos Angeles, Long Beach, Pasadena, Glendale, Burbank, Santa Monica, Torrance, Pomona
OrangeAnaheim, Irvine, Santa Ana
RiversideRiverside, Temecula
San BernardinoSan Bernardino, Ontario
VenturaOxnard, Ventura, Thousand Oaks

Next step

Send the drawings, the Division 27 and 28 sections and the bid date through the request a bid page or by email to carson@telelinkca.com. If the building carries HUD, LIHTC or city money, please tell us the funding source. If residents are staying in place, include the property manager’s resident notification schedule too. Our bid will name the LADBS or city permit path for that address and the Sound Installer or county determination we priced the labor against. It’ll also lay out the floor-by-floor phasing with elevator and dock windows, and a camera and switch list documented against NDAA Section 889. If you’re a GC building a Southern California bid list, the for general contractors page covers our prequalification packet and how we split door hardware and line voltage scope with the other trades.

Counties and cities we cover in this region

Counties: Los Angeles, Orange, Riverside, San Bernardino, Ventura.

Cities include: Los Angeles, Long Beach, Pasadena, Glendale, Burbank, Santa Monica, Torrance, Anaheim, Irvine, Santa Ana, Riverside, Oxnard. We take commercial and institutional work in each of these cities. A city on this list is a place we work, not an office location.

FAQ

Questions about working in Los Angeles & Southern California

How do you staff a Los Angeles project?

One project manager stays on the job from bid review to closeout. Crews are assigned for defined multi-day windows matched to the GC's floor-by-floor phasing, and mobilization is a line item in the bid, priced up front.

Link to this answer
Does LADBS require a permit for structured cabling and cameras?

In most commercial cases, yes. LADBS treats communication and Class 2 circuits above a modest voltage and power threshold as permitted electrical work. Voice and data wiring qualifies for an express permit that a licensed contractor pulls online. Larger scopes are inspected under the project's permit.

Link to this answer
Can residents stay in their units during a Wi-Fi and CATV renovation?

Yes. We did Little Tokyo Towers with residents in place. In-unit work is scheduled in a posted window with the property manager's staff involved, and corridor and riser work is phased by floor. The old systems stay live until the new ones are tested.

Link to this answer
Which prevailing wage determination applies to low voltage work in Los Angeles County?

Low voltage scope in Los Angeles County generally falls under the Sound Installer determination. Inside Wireman rates apply where the work crosses into electrical scope. HUD-funded housing may also carry federal Davis-Bacon rates, and when it does, the higher rate governs.

Link to this answer
Do you take work in Orange County and the Inland Empire?

Yes. Orange, Riverside, San Bernardino and Ventura counties are all part of the region. Each has its own building departments, prevailing wage determinations and IBEW local, so we bid them as separate jobs with their own conditions.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Have a project in Los Angeles & Southern California? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.