The short answer
There's no valid camera count per square foot. The count comes from giving every camera a written purpose, then choosing the resolution, lens and mounting height that put enough pixels on target for that purpose. That's roughly 250 pixels per metre of target to identify an unknown face, 125 to recognize a known person, and 25 to detect that someone is present. Most commercial buildings start with every exterior door, the lobby, elevator lobbies and cabs, corridor decision points, parking entries and drive aisles, the loading dock, the mail room and the telecom rooms. Cameras are then added only where a stated purpose has no coverage. By that method, a two story office building with one lobby, three secondary doors and a surface lot typically lands between 16 and 30 cameras.
| Method | One written purpose per camera, then pixels on target |
|---|---|
| Identify a face | About 250 px/m, roughly 76 px/ft on target |
| Recognize a person | About 125 px/m, roughly 38 px/ft on target |
| Detect presence | About 25 px/m, roughly 8 px/ft on target |
| Standard | DORI criteria from IEC 62676-4 |
| License | CSLB #472017, C-7 Low Voltage Systems |
Start the camera count with a purpose for each camera
The camera count comes from what someone will need to see, from where, and in how much detail. Square footage can’t give you that answer, and neither can a rule of thumb per floor or per door.
Write a purpose for every camera before anything goes on a plan. A purpose is one sentence with a verb, a subject and a location. For example: identify the face of anyone entering through the main lobby door, detect a person crossing the north fence line, read the plate of every vehicle entering the parking structure, or see who handles packages at the mail room counter. If you can’t write a sentence like that for a proposed camera, it probably doesn’t belong on the plan. If a stated purpose has no camera assigned to it, one is missing.
This isn’t just paperwork. The purpose determines resolution, lens, mounting height, aiming angle, whether infrared or wide dynamic range is needed, and how much storage the camera uses. It also decides whether the system is any help after an incident. Many disappointing camera systems have plenty of cameras and no stated purposes, so every view ends up as a compromise between two things nobody chose.
The purpose list stays useful after the project, too. Handed over as a camera schedule, it tells the next technician why each camera is aimed the way it is. And when someone asks why an incident wasn’t captured, it tells the owner what the system was designed to do.
Pixels on target, lens choice and mounting height
Megapixels describe the sensor. Pixel density describes what reaches the subject, and it’s the number that decides whether footage is usable. It’s the horizontal resolution divided by the width of the scene at the target distance, expressed in pixels per metre or pixels per foot of target.
The DORI criteria in IEC 62676-4 (detect, observe, recognize, identify) set four thresholds, and they’re the same values manufacturers publish in their own coverage tools.
| Written purpose | DORI level | Pixel density on target | Typical lens and placement |
|---|---|---|---|
| Identify an unknown face at a controlled entry | Identify | About 250 px/m, roughly 76 px/ft | Narrow view about 8 to 12 ft wide, camera at 7 to 8 ft aimed at head height |
| Read a plate at a gate or lot entry | Identify, plate specific | Above 250 px/m on the plate itself | Purpose built plate camera with shutter and infrared tuned for retroreflective plates |
| Recognize a known employee in a corridor | Recognize | About 125 px/m, roughly 38 px/ft | Fixed view down the length of the corridor, not across it |
| Observe activity at a counter or dock | Observe | About 62.5 px/m, roughly 19 px/ft | Moderate view, 15 to 25 ft wide, mounted to avoid backlight |
| Detect a person along a fence or in a lot | Detect | About 25 px/m, roughly 8 px/ft | Wide view at longer range, paired with lighting or infrared |
Two things follow from that. First, a wide lens spreads a camera’s pixels thin. An 8 MP camera puts about 3,840 pixels across its image. With a 110 degree lens, those pixels cover roughly 114 feet of scene width at 40 feet of range, which works out to about 34 pixels per foot. That’s enough to observe activity, but short of the 38 px/ft that recognizes a known person and well short of the 76 px/ft that identifies a stranger. Put a 30 degree lens on the same sensor and the view narrows to about 21 feet at that range. Density rises to roughly 180 pixels per foot, which is enough to identify.
Second, mounting height often changes what the camera sees more than resolution does. A dome at 14 feet in a corridor shows the tops of heads. The same camera at 8 feet, aimed along the corridor at head height, shows faces. So ceiling height belongs in the design from the start.
Aim matters as much as height. A camera facing a glass entry door with daylight behind it records silhouettes, unless wide dynamic range is specified and the camera is placed to look at arriving faces instead of into the sun. Our camera coverage calculator runs the resolution, field of view and distance tradeoff if you want a quick check before a site walk.
Positions almost every commercial building needs
These positions show up on nearly every commercial camera plan, and each one is there because something specific happens at that spot.
- Every exterior door, including stair discharge and service doors. Doors are where identity is established and where forced entry happens. Aim for identify at the primary entrance and recognize at the rest.
- Lobby and reception, with one overview covering the space and the path to the elevators or the corridor.
- Elevator lobbies on every floor, and inside each cab. Cab cameras are the only view of what happens between floors.
- Corridor decision points, meaning junctions where a person can go more than one way. Cameras in the middle of a corridor add little. Cameras at junctions let a reviewer follow someone’s path.
- Parking entries and drive aisles. Entries get identify or plate cameras. Aisles get detect coverage.
- Loading dock and receiving. Cover both the door and the area where goods sit before they’re moved.
- Mail and package room. Package theft is one of the most common reasons footage gets pulled in multifamily and office buildings.
- Cash handling and high value storage, wherever those exist.
- Telecom and mechanical rooms. A camera on the door of the MDF documents who touched the network and the recorder.
- Building perimeter and blind corners, where the building’s shape creates approaches nobody can see from inside.
Cameras work alongside door control rather than replacing it. A camera records that a door opened. An access control system records who opened it and can stop them. Tying the two together, so a forced door alarm brings up the clip, is a configuration step someone has to do. It doesn’t happen on its own.
How building type changes the count
| Building type | Positions that drive the count | Additions beyond the standard set |
|---|---|---|
| Multifamily | Every building entry, mail and package room, amenity rooms, garage entries, elevator lobbies and cabs, trash enclosure | Bicycle storage, play areas, gated vehicle entry; no view into any unit |
| Senior housing | Same as multifamily, plus every controlled egress door | Doors with wander risk, dining room entry, medication storage; corridors sized for recognize |
| Office tenant improvement | Suite entry, reception, server room, tenant corridor junctions | Base building may already be covered by the landlord; confirm before duplicating |
| K-12 and higher education | Every exterior door, front office and visitor vestibule, cafeteria, gym entry, bus loop, parking, corridor junctions | Fence lines, portables, athletic facilities; the district or campus standard usually governs |
| Clinic | Waiting room, reception, controlled clinical entry, medication storage, staff entry, parking | Never in exam rooms; check facility policy before placing cameras in treatment corridors |
| Warehouse | Every dock door, shipping and receiving desks, yard entries, high value cage, employee entrance | Aisle overviews, trailer yard, charging and fueling areas |
Across building types, the count follows doors, transitions and assets. A building with one entrance and a large open floor needs fewer cameras than a smaller building with six doors and a dozen controlled spaces. Occupancy matters too. In multifamily and affordable housing, common area coverage is expected and unit level coverage is prohibited, so the count has a ceiling that an office building doesn’t have.
Multisensor and fisheye cameras as count reducers
Two camera types can reduce the device count when the geometry works in your favor.
A multisensor camera puts three or four independently aimed sensors in one housing, on one cable and one mount. At a building corner it covers two facades and the approach between them. At a corridor intersection it covers three or four legs. It backfires in a few situations: when the ideal mounting point isn’t where the views converge, when the sensors can’t be aimed steeply enough for the ceiling height, when the added weight needs a mount the existing structure can’t take, and when the platform licenses per sensor instead of per device. That last one can erase the savings on a cloud subscription. Ask how the platform counts a multisensor before you assume a four sensor unit costs one license.
A fisheye covers 360 degrees from the ceiling and dewarps the image in software. It works well in small lobbies, break rooms, package rooms and small retail floors, where nothing important happens more than 15 or 20 feet from the mount. Detail falls off toward the edge of the image. So in a 40 foot room, a fisheye can tell you someone is near the walls, but it won’t identify them.
Both cut down on cable drops, and drops are a meaningful part of the installed cost. Neither one reduces storage or bandwidth, because the pixels still have to be recorded. Our guide on where recorded video should live covers what that means for the recorder.
Worked example: a small office building
Here are the assumptions: two stories, one main lobby entrance, one rear employee entrance, one service door at a small dock, two stair discharge doors, one elevator serving both floors, one surface parking lot with two vehicle entries, an MDF on the ground floor and an IDF upstairs, and a mail and package room off the lobby.
| Written purpose | Position | Cameras | Level |
|---|---|---|---|
| Identify anyone entering the building | Main entry, inside the vestibule at head height | 1 | Identify |
| See who is in the lobby and where they went | Lobby overview | 1 | Observe |
| Identify staff using the rear door | Rear employee entrance | 1 | Identify |
| Identify deliveries and after hours access | Service door and dock | 1 | Identify |
| Confirm the stair exits are not propped or used for entry | Exterior of each stair discharge door | 2 | Recognize |
| See who boards and leaves the elevator | Elevator lobby, each floor | 2 | Recognize |
| See what happens between floors | Elevator cab | 1 | Recognize |
| Follow movement past the corridor junctions | Second floor corridor decision points | 2 | Recognize |
| Read plates and see drivers entering the lot | Each vehicle entry | 2 | Identify |
| Cover the drive aisles and stalls | Lot overview | 2 | Detect |
| See who enters the telecom rooms | MDF and IDF doors | 2 | Recognize |
| See package handling | Mail and package room | 1 | Observe |
| Cover the two approaches nobody can see from inside | Exterior building corners | 2 | Detect |
That comes to 20 cameras, each with a sentence attached. Swapping in multisensor units at the two exterior corners keeps the device count at 20 but gives you six views instead of two. The cost is two heavier mounts and, on some platforms, six licenses. Dropping the second floor corridor cameras and the IDF door brings it to 17 and gives up the ability to follow someone’s path upstairs. Adding a second lobby view for wide dynamic range against the glass entry brings it to 21. Those are real decisions, and the purpose list is what lets you make them deliberately instead of guessing.
Where cameras must not go
Cameras belong where people don’t have a reasonable expectation of privacy: entries, corridors, lobbies, parking, docks, mail rooms, elevators, mechanical and telecom rooms, and building perimeters. They don’t belong in restrooms, locker rooms or changing areas, or aimed into any dwelling unit.
In multifamily and senior housing, this goes beyond the obvious. A corridor camera positioned so a unit’s door swing shows the interior, or an exterior camera with a unit window in its field of view, creates exposure the owner doesn’t want and residents are likely to object to. Document the field of view of every camera in the closeout package, so the owner can answer that question with a drawing instead of a conversation.
Microphones are a separate question with a separate answer. California treats the recording of private conversations differently from video, and consent rules apply. So microphones are commonly left disabled on commercial camera systems unless counsel has reviewed the intended use. Posting signs that the property is under video surveillance is sound practice, and some owner policies and insurers require it. Our security camera systems page covers how those settings are documented at closeout.
Next step
Send us a floor plan and a list of what you need to see (or just the list), and we’ll send back a camera schedule with a written purpose, a level and a lens for each position. Start at request a bid. General contractors bidding Division 28 can find our prequalification packet on the for general contractors page.