| License | CSLB #472017, C-7 Low Voltage Systems |
|---|---|
| Bond and GL | $25,000 bond, $2,000,000 general liability |
| Scope | Division 27 and 28, self-performed |
| Named handoffs | Door hardware, line voltage |
| Closeout | Test results, as-builts, labeling, O&M |
| Plans to | carson@telelinkca.com or request a bid form |
What’s in the prequalification packet
A complete Division 27 and 28 prequalification packet contains the items below. Ours is put together to that list, and we’ll send it as a single PDF when you ask for it by email.
- License: Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. The packet includes the CSLB printout showing classification, status, bond and workers compensation.
- Contractor license bond: $25,000, the statutory amount shown on the CSLB record.
- Certificates of insurance: general liability at $2,000,000, with additional insured endorsements naming the GC and owner as your subcontract requires, primary and non-contributory wording where required, and waiver of subrogation where required. Auto and umbrella certificates as carried.
- Workers compensation certificate, active.
- Experience modification rate: the letter as issued by the workers compensation carrier, for the years your prequalification form asks for.
- DIR public works registration and the current certificates.
- Safety program: the written Injury and Illness Prevention Program that California requires of every employer, and a site-specific safety plan written for the project. See the safety and compliance page.
- References: project contacts on comparable work, matched to the scope and building type you name. Our published projects show the kind of work they cover.
- W-9 and any subcontractor questionnaire your firm uses, completed.
Rather than listing certifications as claims, we include the documents themselves. Copies of any BICSI or manufacturer credentials on file go in the packet.
How to send plans to bid
Email carson@telelinkca.com or use the request a bid page, which takes file uploads. Here’s what we need to price the job accurately:
- Full drawing set as PDF, including the T-series or E-series sheets that show low voltage devices, the telecom room layouts, riser diagrams and the reflected ceiling plans.
- Specification sections, at minimum Division 27 (Communications) and Division 28 (Electronic Safety and Security), plus Division 01 general requirements and any owner or campus telecommunications standard referenced in them.
- Addenda issued to date, the bid form, the bid date and time, and the anticipated construction schedule.
- Whether the project is public works or otherwise prevailing wage, and whether a project labor agreement or other labor requirement applies.
- Whether the building will be occupied during construction.
- Whether federal funds are involved, which triggers NDAA Section 889 and 2 CFR 200.216 for cameras and network equipment.
If the set is a design-build or performance spec, tell us. We’ll state a basis of design in the proposal and price to it, so you can see what the number covers.
What a complete bid from Telelink includes
Our bids come with a scope letter and the assumptions behind the number. Here’s what a complete bid contains:
- A scope letter listing inclusions by system and spec section. It shows the points where our work meets another trade’s and assigns each one to the trade that carries it. We cover door hardware and line voltage in full further down this page.
- Clarifications on Division 27 and 28: cable category and rating assumed, testing standard, labeling scheme, whether the owner-furnished equipment list is complete, and any spec conflicts we found.
- Alternates priced separately: Cat6A in place of Cat6, additional cameras, cloud-managed versus on-premise access control, and an extended warranty or service agreement.
- Prevailing wage basis, the DIR determination used, and our position on any labor requirement, stated in writing.
- Mobilization and any travel, priced into the number and identified.
- Schedule assumptions: phases, after-hours work, and any occupied-building constraints.
Our Division 27 and 28 spec checklist lists the items we look for in a spec. It’s a useful check to run before the set goes out to bid.
Submittals, RFIs and coordination drawings
We send submittals in the order the schedule needs them: cable, pathways and support first, then telecom room equipment, then devices. Each product data submittal names the actual manufacturer, because that’s what an NDAA review needs. Our shop drawings show device locations, pathway routing and rack elevations. For each telecom room, they also show where our work meets the electrician’s: dedicated circuits, receptacle locations and the bonding point, marked as Division 26 scope.
Our RFIs ask one question at a time, reference the sheet and detail number, and propose an answer. That way the response can clarify the documents without changing the scope. We produce coordination drawings when the project requires them, and they’re drawn to keep our pathways clear of the duct, pipe and conduit the mechanical and electrical trades have already placed.
Scope handoffs: door hardware and line voltage
Two scope boundaries cause many of the disputes on a low voltage subcontract, so we spell out each one:
- Door hardware: we provide the access control panel, readers, request-to-exit devices, door position switches, power supplies, cabling and programming. Strikes, maglocks, panic hardware, closers and automatic operators are Division 08 or a C-28 contractor’s scope. Our drawings show the wire count and termination at each door.
- Line voltage: dedicated circuits to racks and power supplies, receptacles in telecom rooms and bonding the room to building ground are Division 26. Our submittals show the location and load, so the electrician can plan the rough-in.
Closeout deliverables
At turnover, you’ll get one package containing:
- Permanent link test results for every copper drop, and loss or OTDR results for every fiber strand.
- Labeling schedules matching the drawings and the ANSI/TIA-606 scheme.
- As-built drawings and rack elevations.
- Device schedules with manufacturer and model.
- Programming records and credentials, handed to the owner’s IT contact.
- Warranty letters and operations and maintenance information.
- Training sign-in sheets where training was specified.
On public work, we close out the final certified payroll and any required apprenticeship documentation with the retention billing.
Payment, preliminary notices and lien law
On private work, California subcontractors serve a preliminary notice under the Civil Code within 20 days of first furnishing labor or materials. On public work, they serve the equivalent notice to the public agency and the prime. We serve it as standard practice, so please don’t read it as a sign of any problem. It’s what preserves the right to a mechanics lien or a stop payment notice if a job goes wrong, and most GCs expect to see it.
Progress billings follow the schedule of values in the subcontract, and each payment is exchanged for the statutory conditional or unconditional waiver and release form. We bill retention after final acceptance, under the terms of the subcontract. We generally use your billing and release forms as the subcontract issues them, without exception requests.
Next step
When you’re ready, send the set through the request a bid page or email carson@telelinkca.com with the bid date in the subject line. If your compliance desk needs the prequalification packet first, mention it in that email and we’ll send it over. The licenses and certifications page explains how to verify the license record before the packet arrives.
Prequalification
Request the packet
You'll get our license, classification, bond, insurance certificates with endorsements, workers comp, safety program and references in one PDF, laid out the way a prequalification desk expects.