Areas we serve
Low Voltage Contractor Serving the San Francisco Bay Area
For general contractors, campus facilities and IT staff, and building owners with projects in the nine Bay Area counties, from Vallejo and Napa through the East Bay, San Francisco, the Peninsula and Santa Clara. Bay Area work is scheduled as planned work blocks, and the Touro University campus renovation in Vallejo is the reference project.
No obligation, and we will say so if the work is outside our license.
| Base | Sacramento, crews assigned in multi-day windows |
|---|---|
| Permitting | City building divisions; campuses are their own official |
| Prevailing wage | DIR county determinations, certified payroll |
| Labor | PLA and union requirements addressed at bid |
| Proof | Touro University campus renovation, Vallejo |
| License | CSLB #472017, C-7 Low Voltage Systems |
How we cover the Bay Area from Sacramento#
Telelink Business Services is based in Sacramento. We do not keep a yard or a satellite office in the Bay Area. Bay Area projects are scheduled as planned work blocks: a dedicated project manager owns the job from bid review through closeout, crews are assigned to the project for defined windows that match the GC’s schedule, and mobilization is priced into the bid instead of arriving later as a change order. For a single-day service call in San Mateo, a closer contractor will usually cost you less.
| Item | How it is handled on a Bay Area project |
|---|---|
| Crew assignment | Defined multi-day windows matched to the GC’s phasing |
| Project management | One manager from bid review through closeout |
| Mobilization and travel | A line item in the bid, not a later change order |
| Material delivery | Consolidated to scheduled dock windows |
| Best fit | Campus renovations, multi-floor TI, phased Division 27 and 28 packages |
| Poor fit | Single-day service calls, where a local contractor costs less |
Vallejo, Benicia and the western side of Solano County are part of this region for us. Vacaville and Fairfield sit with the Sacramento region, a distinction that matters for drive time, the labor market and which building department you are dealing with.
Who issues the permit in each Bay Area jurisdiction#
There is no single Bay Area permitting authority. Every incorporated city runs its own building division, each county handles its unincorporated area, and public campuses are a separate case.
| Jurisdiction | Permitting authority | What that means for the low voltage scope |
|---|---|---|
| Vallejo | Building Division, Planning and Development Services, at the city’s Central Permit Center | One counter for the whole project, including Mare Island addresses |
| San Francisco | Department of Building Inspection | DBI electrical inspection staff work to local amendments beyond the state electrical code |
| Oakland | Planning and Building Department | City inspection on the project permit |
| San Jose | Department of Planning, Building and Code Enforcement | City inspection on the project permit |
| Fremont, Walnut Creek, Concord, San Mateo, Santa Rosa, Napa, San Rafael | Each city’s own building division | Separate counters, portals and inspection scheduling for each |
| Unincorporated areas | The county building department for that county | Nine counties, nine sets of procedures |
| UC and CSU campuses | The campus is its own building official | State Fire Marshal for fire and life safety, DSA for accessibility |
| Community college and K-12 | Division of the State Architect | DSA plan review with a DSA inspector of record on site |
| Private universities, including Touro | The city the campus sits in | City permit, campus access rules |
We confirm the permitting path and who pulls the low voltage or electrical permit during bid review, and put the answer in the scope letter.
Inspectors across the region check the same items on low voltage work: firestopping at rated penetrations, plenum-rated cable in return air plenums, pathway support and fill, separation from line voltage, and, on campuses, conformance to the campus telecommunications standard. We build to those from the first day.
Campus telecommunications standards and academic calendars#
Bay Area campuses generate a large share of the region’s low voltage work, and a campus package is governed by documents an office TI never sees. The campus IT or network services group owns the switches, the fiber plant and usually a written telecommunications standard that governs cable category, jack color, faceplate labeling, rack layout and how a new building connects to the campus backbone. That standard overrides the generic Division 27 spec, and the sooner we have it the fewer submittal revisions the project sees.
The academic calendar then sets when a crew can be on a floor:
- Noise and dust restrictions near occupied classrooms
- Exam periods, when disruptive work stops entirely
- Summer and winter breaks, when the heavy work is scheduled
- Move-in week, when corridors and elevators belong to students
- Contractor parking by permit in a designated lot, sometimes a long walk from the building
- Material deliveries routed away from pedestrian corridors during class changes
Touro University California in Vallejo sits on Mare Island, on the grounds of the former naval shipyard. Older institutional buildings like those found on Mare Island bring their own conditions: thick walls, limited existing pathways, and a fiber backbone that has to reach across a campus rather than up a riser. Our Touro University project covered network cabling, IT room buildout, wireless and fiber backbone for a campus building renovation. The education market page describes how we handle campus standards, DSA projects and academic calendars in more detail.
Prevailing wage and labor requirements in the Bay Area#
Public work anywhere in the nine counties is prevailing wage work under Labor Code 1720 and following: city and county facilities, school and community college districts, UC and CSU, transit agencies, and housing projects with public funding. The Department of Industrial Relations publishes general prevailing wage determinations by county and classification, updated twice a year.
| Scope | DIR classification priced | When it applies |
|---|---|---|
| Structured cabling, fiber backbone, Wi-Fi, cameras, access control | Communications and Systems Installer and Technician | The general case for Division 27 and 28 work in all nine counties |
| Scope that crosses into electrical work | Inside Wireman | Conduit, boxes and circuits that fall to the electrical classification |
Rates differ county to county and run higher in the core Bay Area counties than in the Central Valley, so every public bid is priced against the determination in force for the project’s county on the bid date. Public projects also require DIR contractor registration under Labor Code 1725.5, electronic certified payroll, and apprenticeship compliance under Labor Code 1777.5. Registration and current certificates are in the prequalification packet.
IBEW jurisdiction is split across the region, which matters when a project carries a labor agreement:
| County | IBEW local |
|---|---|
| San Francisco | Local 6 |
| Alameda | Local 595 |
| Contra Costa | Local 302 |
| Santa Clara | Local 332 |
| San Mateo | Local 617 |
| Solano and Napa | Local 180 |
| Marin and Sonoma | Local 551 |
Project labor agreements are common on public work in the Bay Area, particularly on school district bond programs, city and county capital projects and transit work, and some private owners carry labor requirements of their own. Those requirements are addressed at bid time and our position is stated in writing in the scope letter.
Bridge tolls, commute windows and downtown staging#
Drive time is the first Bay Area variable, and it is why crews are assigned in multi-day windows instead of daily trips. Interstate 80 from Sacramento to Vallejo is manageable outside commute hours; continuing across the Carquinez Bridge into Contra Costa, over the Bay Bridge into San Francisco, or down 680 and 880 into Santa Clara County adds bridge tolls and a commute window that crews have to arrive ahead of. Schedules are laid out so crews arrive before the morning peak and material deliveries are consolidated into fewer runs.
In San Francisco and downtown Oakland, there is no curb space for a work truck without a permit. Freight elevators are reserved through building management, deliveries are timed to a dock window, and street-use permits for a truck on the curb are the GC’s to hold. On campuses, materials are delivered to the building, not stored on a lawn, and the crew’s tools go up and come down every day. All of this is priced into the bid so the GC is not absorbing it later.
Touro University: what we delivered on Mare Island#
The Touro University project in Vallejo was a campus building renovation. Scope was network cabling, IT room buildout, wireless and a fiber backbone. The work followed the campus’s requirements for the network room and the fiber plant and was phased against the renovation schedule. Closeout included:
- Test results for the copper permanent links and the fiber strands
- Labeling to the scheme on the drawings
- As-built documentation the campus IT group can use to trace a run
The Touro project shows how we sequence and document institutional work.
Counties and cities we cover#
| County | Cities we cover |
|---|---|
| Solano, western side | Vallejo, Benicia |
| Napa | Napa, American Canyon |
| Contra Costa | Concord, Walnut Creek, Richmond, Martinez |
| Alameda | Oakland, Fremont, Berkeley, Hayward, Livermore |
| San Francisco | San Francisco |
| San Mateo | San Mateo, Redwood City, South San Francisco |
| Santa Clara | San Jose, Santa Clara, Sunnyvale, Palo Alto |
| Marin | San Rafael, Novato |
| Sonoma | Santa Rosa, Petaluma |
Solano County appears in the county list on this page and on the Sacramento page, because the county is split between the two. Vallejo and Benicia are bid here. Vacaville, Fairfield and Dixon sit with the Sacramento region, not this one.
The services most often bid in this region are fiber optic cabling, structured cabling, wireless networks and network room buildout, typically as a combined Division 27 package with cameras and access control under Division 28.
Next step#
Send the drawings, the Division 27 and 28 sections, the bid date, and the campus telecommunications standard if the project sits on a campus, through the request a bid page or by email to carson@telelinkca.com. What comes back names the permitting authority for that city or campus, the DIR county determination the labor is priced against, the work block dates set around the academic or tenant calendar, and a mobilization line that shows the bridge and travel cost separately. General contractors assembling a Bay Area bid list will find prequalification packet contents and our scope handoffs on the for general contractors page.
Counties and cities we cover in this region
Counties: Solano, Contra Costa, Alameda, San Francisco, San Mateo, Santa Clara, Marin, Sonoma, Napa.
Cities include: Vallejo, Benicia, Oakland, San Francisco, San Jose, Fremont, Walnut Creek, Concord, San Mateo, Santa Rosa, Napa. This is a list of places we will travel to for commercial and institutional work, not a claim of an office in each one.
FAQ
Questions about working in Bay Area
Do you have a Bay Area office or crew?
No. Telelink is based in Sacramento. Bay Area projects are scheduled in defined multi-day windows, one project manager runs the job from bid review to closeout, and mobilization is priced into the bid. That model fits campus renovations and multi-floor tenant improvements better than one-day service calls.
Link to this answerWhich prevailing wage classification applies to low voltage work in the Bay Area?
In the Bay Area counties the DIR determinations for Communications and Systems Installer and Technician generally cover low voltage scope, with Inside Wireman rates where the work crosses into electrical. Rates differ by county, so we price to the determination for the project location on the bid date.
Link to this answerDo you sign project labor agreements?
Labor requirements, including PLAs, are addressed at bid time. Our scope letter states our position in writing for that project so the GC knows before award.
Link to this answerDo you follow a campus telecommunications standard instead of the spec?
Yes, where the campus has one. The campus standard governs cable category, labeling, jack colors, rack layout and backbone connections, and we ask for it before submittals so they do not go through unnecessary revisions.
Link to this answerQuestion not answered here? Ask a person who does this work.
Call (916) 340-7503Email usOr send drawings to bidHave a project in Bay Area? Let’s talk.
Send over a drawing set or just describe what you need. We will tell you what we can take on, what to plan for, and how soon we can be there.