| Crews | Assigned in multi-day windows to the GC's phasing |
|---|---|
| Permitting | City building divisions; campuses are their own official |
| Prevailing wage | DIR county determinations, certified payroll |
| Labor | PLA and union requirements addressed at bid |
| Proof | Touro University campus renovation, Vallejo |
| License | CSLB #472017, C-7 Low Voltage Systems |
How we run Bay Area projects
A dedicated project manager owns each Bay Area job from bid review through closeout. Crews are assigned to the project for defined windows that match the GC’s schedule, and mobilization is priced into the bid, so the cost is visible up front. That setup is built for campus renovations, multi-floor tenant improvements and phased Division 27 and 28 packages, not single-day service calls.
| Item | How it’s handled on a Bay Area project |
|---|---|
| Crew assignment | Defined multi-day windows matched to the GC’s phasing |
| Project management | One manager from bid review through closeout |
| Mobilization | A separate line item in the bid |
| Material delivery | Consolidated to scheduled dock windows |
| Best fit | Campus renovations, multi-floor TI, phased Division 27 and 28 packages |
| Poor fit | Single-day service calls |
For us, Vallejo, Benicia and the western side of Solano County are part of this region. Vacaville and Fairfield fall under our Sacramento region. That split follows traffic patterns, the labor market and which building department you’re dealing with.
Who issues the permit in each Bay Area jurisdiction
There’s no single permitting authority for the Bay Area. Every incorporated city runs its own building division, each county handles its unincorporated area, and public campuses are a separate case.
| Jurisdiction | Permitting authority | What that means for the low voltage scope |
|---|---|---|
| Vallejo | Building Division, Planning and Development Services, at the city’s Central Permit Center | One counter for the whole project, including Mare Island addresses |
| San Francisco | Department of Building Inspection | DBI electrical inspection staff work to local amendments beyond the state electrical code |
| Oakland | Planning and Building Department | City inspection on the project permit |
| San Jose | Department of Planning, Building and Code Enforcement | City inspection on the project permit |
| Fremont, Walnut Creek, Concord, San Mateo, Santa Rosa, Napa, San Rafael | Each city’s own building division | Separate counters, portals and inspection scheduling for each |
| Unincorporated areas | The county building department for that county | Nine counties, nine sets of procedures |
| UC and CSU campuses | The campus is its own building official | State Fire Marshal for fire and life safety, DSA for accessibility |
| Community college and K-12 | Division of the State Architect | DSA plan review with a DSA inspector of record on site |
| Private universities, including Touro | The city the campus sits in | City permit, campus access rules |
During bid review, we confirm the permitting path and who pulls the low voltage or electrical permit, and we put the answer in the scope letter.
Inspectors across the region look for the same things on low voltage work: firestopping at rated penetrations, plenum-rated cable in return air plenums, pathway support and fill, separation from line voltage, and, on campuses, conformance to the campus telecommunications standard. We plan for all of those from the start of the job.
Campus telecommunications standards and academic calendars
Bay Area campuses generate a large share of the region’s low voltage work, and a campus package comes with documents an office TI rarely sees. The campus IT or network services group owns the switches and the fiber plant. They usually have a written telecommunications standard too, covering cable category, jack color, faceplate labeling, rack layout and how a new building connects to the campus backbone. That standard typically takes precedence over the generic Division 27 spec. The sooner we have it, the fewer submittal revisions the project goes through.
The academic calendar then decides when a crew can be on a floor:
- Noise and dust restrictions near occupied classrooms
- Exam periods, when disruptive work usually stops
- Summer and winter breaks, when the heavy work is scheduled
- Move-in week, when corridors and elevators belong to students
- Contractor parking by permit in a designated lot, sometimes a long walk from the building
- Material deliveries routed away from pedestrian corridors during class changes
Touro University California in Vallejo sits on Mare Island, on the grounds of the former naval shipyard. Older institutional buildings like the ones on Mare Island come with their own conditions: thick walls, limited existing pathways, and a fiber backbone that has to reach across a campus instead of up a riser. Our Touro University project covered network cabling, IT room buildout, wireless and fiber backbone for a campus building renovation. Our education market page goes into more detail on how we handle campus standards, DSA projects and academic calendars.
Prevailing wage and labor requirements in the Bay Area
Public work anywhere in the nine counties is prevailing wage work under Labor Code 1720 and following. That includes city and county facilities, school and community college districts, UC and CSU, transit agencies, and housing projects with public funding. The Department of Industrial Relations publishes general prevailing wage determinations by county and classification, and updates them twice a year.
| Scope | DIR classification priced | When it applies |
|---|---|---|
| Structured cabling, fiber backbone, Wi-Fi, cameras, access control | Communications and Systems Installer and Technician | The general case for Division 27 and 28 work in all nine counties |
| Scope that crosses into electrical work | Inside Wireman | Conduit, boxes and circuits that fall to the electrical classification |
Rates differ from county to county, and they run higher in the core Bay Area counties than in the Central Valley. So we price each public bid against the determination in force for the project’s county on the bid date. Public projects also require DIR contractor registration under Labor Code 1725.5, electronic certified payroll, and apprenticeship compliance under Labor Code 1777.5. Registration and current certificates are in the prequalification packet.
IBEW jurisdiction is split across the region, and that matters when a project carries a labor agreement:
| County | IBEW local |
|---|---|
| San Francisco | Local 6 |
| Alameda | Local 595 |
| Contra Costa | Local 302 |
| Santa Clara | Local 332 |
| San Mateo | Local 617 |
| Solano and Napa | Local 180 |
| Marin and Sonoma | Local 551 |
Project labor agreements are common on public work in the Bay Area, especially on school district bond programs, city and county capital projects and transit work. Some private owners have labor requirements of their own, too. We address those requirements at bid time and put our position in writing in the scope letter.
Bridge tolls, commute windows and downtown staging
Traffic is the first thing we plan around in the Bay Area. The Carquinez and Bay bridges carry tolls, and the bridge approaches and the 680 and 880 corridors into Santa Clara County come with a commute window that crews have to beat. So we lay out schedules to get crews in before the morning peak, and we consolidate material deliveries into fewer runs.
In San Francisco and downtown Oakland, there’s no curb space for a work truck without a permit. Freight elevators are reserved through building management, deliveries are timed to a dock window, and the GC holds the street-use permits for a truck on the curb. On campuses, materials are delivered to the building instead of stored on a lawn, and the crew’s tools go up and come down every day. We price all of this into the bid, so it’s in the number from the start.
Touro University: what we delivered on Mare Island
The Touro University project in Vallejo was a campus building renovation. Our scope was network cabling, IT room buildout, wireless and a fiber backbone. We followed the campus’s requirements for the network room and the fiber plant and phased the work against the renovation schedule. Closeout included:
- Test results for the copper permanent links and the fiber strands
- Labeling to the scheme on the drawings
- As-built documentation the campus IT group can use to trace a run
It’s a good example of how we sequence and document institutional work.
Counties and cities we cover
| County | Cities we cover |
|---|---|
| Solano, western side | Vallejo, Benicia |
| Napa | Napa, American Canyon |
| Contra Costa | Concord, Walnut Creek, Richmond, Martinez |
| Alameda | Oakland, Fremont, Berkeley, Hayward, Livermore |
| San Francisco | San Francisco |
| San Mateo | San Mateo, Redwood City, South San Francisco |
| Santa Clara | San Jose, Santa Clara, Sunnyvale, Palo Alto |
| Marin | San Rafael, Novato |
| Sonoma | Santa Rosa, Petaluma |
You’ll see Solano County listed on this page and on the Sacramento page, because the county is split between the two. We bid Vallejo and Benicia as part of this region. Vacaville, Fairfield and Dixon fall under the Sacramento region instead.
The services we bid most often here are fiber optic cabling, structured cabling, wireless networks and network room buildout. They typically come as a combined Division 27 package, with cameras and access control under Division 28.
Next step
Send the drawings, the Division 27 and 28 sections and the bid date through the request a bid page or by email to carson@telelinkca.com. If the project sits on a campus, please include the campus telecommunications standard too. Our bid will name the permitting authority for that city or campus and the DIR county determination we priced the labor against. It’ll also show work dates set around the academic or tenant calendar, and a mobilization line with bridge tolls broken out separately. If you’re a GC putting together a Bay Area bid list, the for general contractors page covers our prequalification packet and where our scope ends and other trades begin.
Counties and cities we cover in this region
Counties: Solano, Contra Costa, Alameda, San Francisco, San Mateo, Santa Clara, Marin, Sonoma, Napa.
Cities include: Vallejo, Benicia, Oakland, San Francisco, San Jose, Fremont, Walnut Creek, Concord, San Mateo, Santa Rosa, Napa. We take commercial and institutional work in each of these cities. A city on this list is a place we work, not an office location.