Areas we serve

Low Voltage Contractor Serving the San Francisco Bay Area

For general contractors, campus facilities and IT staff, and building owners with projects in the nine Bay Area counties, from Vallejo and Napa through the East Bay, San Francisco, the Peninsula and Santa Clara. Bay Area work is scheduled as planned work blocks, and the Touro University campus renovation in Vallejo is the reference project.

Delivered here
Touro University, Vallejo

No obligation, and we will say so if the work is outside our license.

CSLB #472017 · Licensed C-7 contractor San Francisco skyline on a clear day
Working in this region
BaseSacramento, crews assigned in multi-day windows
PermittingCity building divisions; campuses are their own official
Prevailing wageDIR county determinations, certified payroll
LaborPLA and union requirements addressed at bid
ProofTouro University campus renovation, Vallejo
LicenseCSLB #472017, C-7 Low Voltage Systems

How we cover the Bay Area from Sacramento#

Telelink Business Services is based in Sacramento. We do not keep a yard or a satellite office in the Bay Area. Bay Area projects are scheduled as planned work blocks: a dedicated project manager owns the job from bid review through closeout, crews are assigned to the project for defined windows that match the GC’s schedule, and mobilization is priced into the bid instead of arriving later as a change order. For a single-day service call in San Mateo, a closer contractor will usually cost you less.

ItemHow it is handled on a Bay Area project
Crew assignmentDefined multi-day windows matched to the GC’s phasing
Project managementOne manager from bid review through closeout
Mobilization and travelA line item in the bid, not a later change order
Material deliveryConsolidated to scheduled dock windows
Best fitCampus renovations, multi-floor TI, phased Division 27 and 28 packages
Poor fitSingle-day service calls, where a local contractor costs less

Vallejo, Benicia and the western side of Solano County are part of this region for us. Vacaville and Fairfield sit with the Sacramento region, a distinction that matters for drive time, the labor market and which building department you are dealing with.

Who issues the permit in each Bay Area jurisdiction#

There is no single Bay Area permitting authority. Every incorporated city runs its own building division, each county handles its unincorporated area, and public campuses are a separate case.

JurisdictionPermitting authorityWhat that means for the low voltage scope
VallejoBuilding Division, Planning and Development Services, at the city’s Central Permit CenterOne counter for the whole project, including Mare Island addresses
San FranciscoDepartment of Building InspectionDBI electrical inspection staff work to local amendments beyond the state electrical code
OaklandPlanning and Building DepartmentCity inspection on the project permit
San JoseDepartment of Planning, Building and Code EnforcementCity inspection on the project permit
Fremont, Walnut Creek, Concord, San Mateo, Santa Rosa, Napa, San RafaelEach city’s own building divisionSeparate counters, portals and inspection scheduling for each
Unincorporated areasThe county building department for that countyNine counties, nine sets of procedures
UC and CSU campusesThe campus is its own building officialState Fire Marshal for fire and life safety, DSA for accessibility
Community college and K-12Division of the State ArchitectDSA plan review with a DSA inspector of record on site
Private universities, including TouroThe city the campus sits inCity permit, campus access rules

We confirm the permitting path and who pulls the low voltage or electrical permit during bid review, and put the answer in the scope letter.

Inspectors across the region check the same items on low voltage work: firestopping at rated penetrations, plenum-rated cable in return air plenums, pathway support and fill, separation from line voltage, and, on campuses, conformance to the campus telecommunications standard. We build to those from the first day.

Campus telecommunications standards and academic calendars#

Bay Area campuses generate a large share of the region’s low voltage work, and a campus package is governed by documents an office TI never sees. The campus IT or network services group owns the switches, the fiber plant and usually a written telecommunications standard that governs cable category, jack color, faceplate labeling, rack layout and how a new building connects to the campus backbone. That standard overrides the generic Division 27 spec, and the sooner we have it the fewer submittal revisions the project sees.

The academic calendar then sets when a crew can be on a floor:

  • Noise and dust restrictions near occupied classrooms
  • Exam periods, when disruptive work stops entirely
  • Summer and winter breaks, when the heavy work is scheduled
  • Move-in week, when corridors and elevators belong to students
  • Contractor parking by permit in a designated lot, sometimes a long walk from the building
  • Material deliveries routed away from pedestrian corridors during class changes

Touro University California in Vallejo sits on Mare Island, on the grounds of the former naval shipyard. Older institutional buildings like those found on Mare Island bring their own conditions: thick walls, limited existing pathways, and a fiber backbone that has to reach across a campus rather than up a riser. Our Touro University project covered network cabling, IT room buildout, wireless and fiber backbone for a campus building renovation. The education market page describes how we handle campus standards, DSA projects and academic calendars in more detail.

Prevailing wage and labor requirements in the Bay Area#

Public work anywhere in the nine counties is prevailing wage work under Labor Code 1720 and following: city and county facilities, school and community college districts, UC and CSU, transit agencies, and housing projects with public funding. The Department of Industrial Relations publishes general prevailing wage determinations by county and classification, updated twice a year.

ScopeDIR classification pricedWhen it applies
Structured cabling, fiber backbone, Wi-Fi, cameras, access controlCommunications and Systems Installer and TechnicianThe general case for Division 27 and 28 work in all nine counties
Scope that crosses into electrical workInside WiremanConduit, boxes and circuits that fall to the electrical classification

Rates differ county to county and run higher in the core Bay Area counties than in the Central Valley, so every public bid is priced against the determination in force for the project’s county on the bid date. Public projects also require DIR contractor registration under Labor Code 1725.5, electronic certified payroll, and apprenticeship compliance under Labor Code 1777.5. Registration and current certificates are in the prequalification packet.

IBEW jurisdiction is split across the region, which matters when a project carries a labor agreement:

CountyIBEW local
San FranciscoLocal 6
AlamedaLocal 595
Contra CostaLocal 302
Santa ClaraLocal 332
San MateoLocal 617
Solano and NapaLocal 180
Marin and SonomaLocal 551

Project labor agreements are common on public work in the Bay Area, particularly on school district bond programs, city and county capital projects and transit work, and some private owners carry labor requirements of their own. Those requirements are addressed at bid time and our position is stated in writing in the scope letter.

Bridge tolls, commute windows and downtown staging#

Drive time is the first Bay Area variable, and it is why crews are assigned in multi-day windows instead of daily trips. Interstate 80 from Sacramento to Vallejo is manageable outside commute hours; continuing across the Carquinez Bridge into Contra Costa, over the Bay Bridge into San Francisco, or down 680 and 880 into Santa Clara County adds bridge tolls and a commute window that crews have to arrive ahead of. Schedules are laid out so crews arrive before the morning peak and material deliveries are consolidated into fewer runs.

In San Francisco and downtown Oakland, there is no curb space for a work truck without a permit. Freight elevators are reserved through building management, deliveries are timed to a dock window, and street-use permits for a truck on the curb are the GC’s to hold. On campuses, materials are delivered to the building, not stored on a lawn, and the crew’s tools go up and come down every day. All of this is priced into the bid so the GC is not absorbing it later.

Touro University: what we delivered on Mare Island#

The Touro University project in Vallejo was a campus building renovation. Scope was network cabling, IT room buildout, wireless and a fiber backbone. The work followed the campus’s requirements for the network room and the fiber plant and was phased against the renovation schedule. Closeout included:

  • Test results for the copper permanent links and the fiber strands
  • Labeling to the scheme on the drawings
  • As-built documentation the campus IT group can use to trace a run

The Touro project shows how we sequence and document institutional work.

Counties and cities we cover#

CountyCities we cover
Solano, western sideVallejo, Benicia
NapaNapa, American Canyon
Contra CostaConcord, Walnut Creek, Richmond, Martinez
AlamedaOakland, Fremont, Berkeley, Hayward, Livermore
San FranciscoSan Francisco
San MateoSan Mateo, Redwood City, South San Francisco
Santa ClaraSan Jose, Santa Clara, Sunnyvale, Palo Alto
MarinSan Rafael, Novato
SonomaSanta Rosa, Petaluma

Solano County appears in the county list on this page and on the Sacramento page, because the county is split between the two. Vallejo and Benicia are bid here. Vacaville, Fairfield and Dixon sit with the Sacramento region, not this one.

The services most often bid in this region are fiber optic cabling, structured cabling, wireless networks and network room buildout, typically as a combined Division 27 package with cameras and access control under Division 28.

Next step#

Send the drawings, the Division 27 and 28 sections, the bid date, and the campus telecommunications standard if the project sits on a campus, through the request a bid page or by email to carson@telelinkca.com. What comes back names the permitting authority for that city or campus, the DIR county determination the labor is priced against, the work block dates set around the academic or tenant calendar, and a mobilization line that shows the bridge and travel cost separately. General contractors assembling a Bay Area bid list will find prequalification packet contents and our scope handoffs on the for general contractors page.

Counties and cities we cover in this region

Counties: Solano, Contra Costa, Alameda, San Francisco, San Mateo, Santa Clara, Marin, Sonoma, Napa.

Cities include: Vallejo, Benicia, Oakland, San Francisco, San Jose, Fremont, Walnut Creek, Concord, San Mateo, Santa Rosa, Napa. This is a list of places we will travel to for commercial and institutional work, not a claim of an office in each one.

FAQ

Questions about working in Bay Area

Do you have a Bay Area office or crew?

No. Telelink is based in Sacramento. Bay Area projects are scheduled in defined multi-day windows, one project manager runs the job from bid review to closeout, and mobilization is priced into the bid. That model fits campus renovations and multi-floor tenant improvements better than one-day service calls.

Link to this answer
Who is the permitting authority on a university campus project?

It depends on the campus. UC and CSU campuses act as their own building officials with State Fire Marshal review. Community college projects go through the Division of the State Architect. Private universities such as Touro in Vallejo are permitted through the city.

Link to this answer
Which prevailing wage classification applies to low voltage work in the Bay Area?

In the Bay Area counties the DIR determinations for Communications and Systems Installer and Technician generally cover low voltage scope, with Inside Wireman rates where the work crosses into electrical. Rates differ by county, so we price to the determination for the project location on the bid date.

Link to this answer
Do you sign project labor agreements?

Labor requirements, including PLAs, are addressed at bid time. Our scope letter states our position in writing for that project so the GC knows before award.

Link to this answer
Do you follow a campus telecommunications standard instead of the spec?

Yes, where the campus has one. The campus standard governs cable category, labeling, jack colors, rack layout and backbone connections, and we ask for it before submittals so they do not go through unnecessary revisions.

Link to this answer

Question not answered here? Ask a person who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TELELINKBusiness Services

Have a project in Bay Area? Let’s talk.

Send over a drawing set or just describe what you need. We will tell you what we can take on, what to plan for, and how soon we can be there.