| Crews | Assigned in multi-day windows to the GC's phasing |
|---|---|
| Permitting | City of San Diego DSD electrical permit tracks |
| Prevailing wage | DIR county determinations, certified payroll |
| Labor | PLA and union requirements addressed at bid |
| Proof | Horton House, occupied senior housing renovation |
| License | CSLB #472017, C-7 Low Voltage Systems |
How we run San Diego and Imperial County projects
A dedicated project manager owns each San Diego job from bid review through closeout. Crews are assigned to the project for defined windows that match the GC’s phasing, and mobilization is priced into the bid up front. That approach suits the work we’re asked to bid in the region: renovation scope in occupied senior and multifamily buildings, campus and institutional work, and multi-site rollouts. It doesn’t suit one-truck service calls.
| Item | How it’s handled on a San Diego project |
|---|---|
| Crew assignment | Defined multi-day windows matched to the GC’s phasing |
| Project management | One manager from bid review through closeout |
| Mobilization | A line item in the bid, priced up front |
| Work dates | Checked against the Petco Park and convention center calendars before they’re set |
| North County, East County, South Bay | Covered under the same mobilization, not as separate ones |
| Imperial County | The Interstate 8 drive and summer heat planned into the working day |
We include Imperial County in this region because El Centro, Brawley and Calexico sit on Interstate 8 east of San Diego. Imperial scope can ride on the same mobilization as a San Diego project, and the desert drive is priced in.
San Diego DSD permit tracks and the other jurisdictions
Inside the City of San Diego, the Development Services Department (DSD) is the permitting authority. Its rule is that electrical wiring, devices and equipment need a permit unless the work is specifically exempt.
| Jurisdiction | Permitting authority | Path for the low voltage scope |
|---|---|---|
| City of San Diego | Development Services Department | Two electrical tracks through the Accela portal: a no-plan permit that issues quickly for minor work, and a plan-required permit with plan review for everything else |
| Unincorporated San Diego County | County Planning and Development Services | A separate office from the city, with its own plan check and inspectors |
| Chula Vista, Oceanside, Escondido, Carlsbad, El Cajon, Vista, San Marcos, National City, La Mesa | Each city’s own building division | Whether the low voltage scope needs its own permit is confirmed job by job |
| Imperial County and its cities | County and city building departments | Own counters and inspection scheduling |
| San Diego State and UC San Diego | The campus is its own building official | State Fire Marshal review for fire and life safety |
| Community college and K-12 | Division of the State Architect | The DSA inspector of record, not the city, watches the work |
On a renovation, our scope usually rides on the project’s building permit and is inspected with the electrical work. Where a separate permit is required, we pull it under CSLB #472017. We confirm the path during bid review and write it into the scope letter. Inspection scheduling varies by jurisdiction, and so does the way inspectors want firestopping documented.
Senior housing with residents in place
Our San Diego work has been senior housing renovation with residents in place. Horton House, in downtown San Diego, was that project. We installed Wi-Fi, CATV, surveillance, access control and a nurse call system, all while seniors lived in the building.
Senior housing comes with requirements that ordinary multifamily doesn’t have. The licensing or funding program and the owner’s operating standards commonly require an emergency call system, which usually means:
- Pull cords in bathrooms and bedrooms
- Pendant transmitters for residents who move around the building
- Corridor dome lights at the unit door
- Annunciation at a staff station or on staff mobile devices
In licensed healthcare settings, UL 1069 listing is the expectation, and in senior and assisted living the owner’s standard usually points to a listed system as well. In an occupied building, we sequence the cutover so each unit stays on the existing system until its new station is installed and tested.
Resident notification, in-unit work windows, shared elevators and closed ceilings at the end of each shift work the same way they do on any occupied rehab. Federal funding brings NDAA Section 889 and 2 CFR 200.216 into the camera and network specification, so we document the actual manufacturer of every device on the submittal. Our senior living market page and nurse call systems guide go into how we handle this in more detail.
Prevailing wage and labor requirements in San Diego County
Public work and publicly funded housing in the region are prevailing wage work under Labor Code 1720 and following. The Department of Industrial Relations publishes general prevailing wage determinations by county and classification and updates them twice a year. San Diego County has its own set.
| Where the work is | Wage determination priced | IBEW jurisdiction |
|---|---|---|
| San Diego County, low voltage scope | Sound and Signal Technician | Local 569 |
| San Diego County, scope crossing into electrical | Inside Wireman, and Technician as a separate classification in the same determination | Local 569 |
| Imperial County | The county’s own determinations, read on the bid date | Local 569 |
| HUD-funded housing in either county | Federal Davis-Bacon alongside the state determination, with the higher rate governing per classification | Same as the county |
We price each public bid against the determination in force for the project’s county on the bid date. Public projects also require DIR contractor registration under Labor Code 1725.5, electronic certified payroll, and apprenticeship compliance under Labor Code 1777.5, and registration and current certificates are in the prequalification packet.
Project labor agreements and project stabilization agreements show up on public work in the region, including school district bond programs, county and city capital projects, and port and transit work. Some publicly funded housing owners have labor requirements as well. Where one of those applies, we carry it in the bid and say so clearly in the scope letter before award.
Downtown access, Gaslamp streets and staging
In the Gaslamp Quarter and East Village, the streets are narrow and several are one-way. Curb space is metered or posted for valet and loading, and evening foot traffic starts early. Padres home games at Petco Park and convention center events, including Comic-Con, close streets and fill the garages within walking distance. So we check the ballpark and convention calendars when we lay out work dates, and we plan deliveries for mornings.
An occupied building rehab doesn’t have a yard. Material is delivered to the building’s loading area in a scheduled window, goes up in the reserved elevator, and is staged in a room the property manager assigns on the floor being worked. Crews park in a paid structure, and that cost is in the bid. Any lane or sidewalk use beyond a posted loading zone needs a city permit, which the GC typically holds.
North County, East County and South Bay projects can be covered under the same mobilization as downtown work instead of as separate ones. Imperial County work adds the Interstate 8 drive and summer heat that shortens the working day, and we account for both in the bid.
Horton House: what we delivered
Horton House in San Diego was a senior housing renovation in an occupied building. Our scope was Wi-Fi, CATV, surveillance, access control and a nurse call system. We phased the work around the residents and coordinated it with the GC’s renovation schedule. Each unit stayed on the existing call system until its new station was installed and tested, and the existing entry system stayed in service until the new access control was commissioned. The project page has the full write-up, and the nurse call systems and access control service pages explain how those systems are specified for senior housing.
Counties and cities we cover
| County | Cities we cover |
|---|---|
| San Diego | San Diego, Chula Vista, Oceanside, Escondido, Carlsbad, El Cajon, Vista, San Marcos, National City, La Mesa |
| Imperial | El Centro, Brawley, Calexico |
Next step
Send the drawings, the Division 27 and 28 sections and the bid date through the request a bid page or by email to carson@telelinkca.com. Please also tell us which licensing or funding program the emergency call system has to satisfy, and if residents are staying in place, include the property manager’s unit access plan. Our bid will name the DSD or city permit track for that address and the San Diego County determination we priced the labor against. It’ll also include a unit-by-unit call system cutover sequence and work dates checked against the Petco Park and convention center calendars. For Imperial County scope, the Interstate 8 drive shows up as its own line. If you’re a GC building a San Diego bid list, the for general contractors page covers our prequalification packet and how we split door hardware and line voltage scope with the other trades.