CSLB #472017, C-7 Low Voltage Systems

Legal

Accessibility Statement

We want every visitor, including people with disabilities, to be able to look through our work, read our resources and request a bid. This statement covers the standard we work to, what's built into the site, how to get anything here in a different format, and how to reach us if something doesn't work for you.

Effective
September 28, 2026
Summary
Target standardWCAG 2.2 Level AA
Display preferencesTheme, text size, contrast, spacing, read aloud
Alternate formatsProvided on request at no charge
Feedbackcarson@telelinkca.com or (916) 340-7503

How this site is built for assistive technology

We’ve built this site to work with screen readers, keyboard-only navigation, magnification, voice control and other assistive technology.

The standard we work to

We design, build and test this site against the Web Content Accessibility Guidelines (WCAG) 2.2, Level AA. We check accessibility when pages are built and again when content changes. Testing is ongoing, and we fix issues as we find them or as visitors report them. If something here doesn’t meet that standard for you, please tell us. We’ll review what you report and let you know what we can do about it.

What’s built into the site

  • We build and test the site so pages and controls can be reached and operated with a keyboard alone, with a visible focus indicator on the active element. When we find one that can’t, we work to fix it.
  • Images carry text alternatives, and decorative images are marked so screen readers skip them.
  • We choose and check text and interface colors against the WCAG Level AA contrast minimum in both the light and the dark theme. The high contrast setting targets the stricter Level AAA ratio for body text, captions and links.
  • The site reads your device settings for color scheme, contrast and reduced motion and follows them before you change anything. When a setting is coming from your device rather than from you, the preferences panel says so on the control.
  • You can resize text to at least 200 percent with your browser zoom, or up to 132 percent from the preferences panel, without losing content or function. The panel scales the whole page, not only the body copy.
  • Pages use consistent headings, landmarks and a skip link, so you can move straight to the main content.
  • Longer pages have an on-this-page menu, so you can jump straight to a section. Each section heading also has a small link you can copy with a mouse to send someone to that exact spot.
  • Wider tables scroll sideways on small screens. Each one is labeled and can be scrolled with the keyboard.
  • Forms have visible labels, clear error messages, and instructions that don’t rely on color alone.
  • A pause button in the floating buttons at the lower right of every page stops all animation and background video, and it stays stopped as you move around the site.
  • The display preferences panel opens from the accessibility button in the same place. From there you can:
    • switch to a dark theme, change the text size, turn on high contrast or make menus and overlays solid instead of translucent
    • switch to Atkinson Hyperlegible Next, a highly legible font, widen the line, letter and word spacing, and highlight every link in the text
    • turn on a reading guide that follows your pointer or keyboard focus, or have the page read aloud by your device’s built-in voice, at a slower or faster speed
    • turn on a strong black and yellow focus outline or a large mouse pointer
  • These settings are extras. The site is built to work with your own assistive technology without them. Your choices are stored only on your device. They contain no personal information, they’re never sent anywhere, and they’re applied before the page draws so nothing flashes. Read aloud uses the speech voices your browser or device provides, so the page text isn’t sent to us. Some browsers offer online voices run by the browser maker, under that company’s own privacy terms. Our Privacy Policy has the details.

Alternate formats on request

If any page, guide, form or document on this site doesn’t work for you, we’ll provide the same information another way, at no cost to you. That includes:

  • Large print, or a plain text version of any page, guide or calculator on this site
  • An accessible electronic document, or a printed copy if that’s easier for you
  • A proposal, bid, submittal or closeout document in a format your assistive technology can read
  • Information read to you over the phone, and form answers taken down over the phone instead of typed into a form
  • A different arrangement that works better for you, if none of the above fits

Just email carson@telelinkca.com or call (916) 340-7503 and tell us which page or document you need and the format you’d like it in. We’ll confirm the request promptly and send the material as soon as we can produce it. You don’t need to explain why you’re asking.

Content we don’t fully control

Some of the content we link to, such as manufacturer specification sheets and standards documents, is hosted by third parties and built to their standards rather than ours. If a linked document isn’t accessible to you, let us know. We’ll work to get you the information another way, in the formats described above.

Tell us if something doesn’t work

If you’re having trouble with any part of this site, or you need a page, a document or a form in another format, please get in touch:

It helps to know the page, what you were trying to do, and the browser or assistive technology you were using. We’ll respond as quickly as we can and work with you to get you what you need.

Next step

To get anything on this site in another format, email carson@telelinkca.com or call (916) 340-7503 with the page or document name and the format you need. Large print, plain text, an accessible electronic document, a printed copy, or having the information read to you over the phone are all available at no cost, and you don’t need to give a reason. You’re also welcome to request a bid or ask a question the same way, by phone or email, without using a form at all.