Cable drop estimator

Get a first-pass drop count and planning range for a structured cabling scope, and change any assumption you like. The ranges are the same California 2026 planning ranges published in our cost guide. They aren't a quote.

CSLB #472017 · Licensed C-7 contractor

Estimator

The counts start from common specification practice: two drops per workstation, one per camera and one Cat6A drop per access point. You can edit any of them.

Filled in from the square footage and building type. Type over it if you know the number.

Cat6A, one drop each, or two if the spec calls for redundancy.

Printers, displays, phones without a workstation, door controllers.

Applies to workstation, camera and device drops. Access point drops are priced as Cat6A either way.

The percent added to the labor portion of each line. This tool treats labor as 60 percent of a drop. Leave it at 0 for private work. Otherwise, set it from the applicable DIR determination, because the premium isn't a published figure.

One run from each telecom room back to the MDF, terminated and tested.

Planning estimate

0 drops

Planning estimate by line item
Workstation and device drops
Camera drops
Access point drops (Cat6A)
Telecom room buildout
Backbone fiber
Permits and inspection
Planning range
All-in per drop

These ranges come from our structured cabling cost guide (California commercial planning ranges as of 2026). They don't include switching, wireless hardware, cameras or the devices themselves. For a real number, we need to see plans.