CSLB #472017, C-7 Low Voltage Systems

Company

License, Bond and Insurance

Our license number and classification are below, with what the C-7 license covers, how to look it up at cslb.ca.gov, and the bond and insurance we carry. Everything here is written to match the public CSLB record, and that record is the version that governs.

Updated
September 11, 2026

No obligation. If the work is outside our license, we'll tell you.

CSLB #472017 · Licensed C-7 contractor Columns and dome of the California State Capitol
License record
BusinessTelelink Business Services
License number#472017
ClassificationC-7 Low Voltage Systems
Issued byCalifornia Contractors State License Board
Contractor bond$25,000Statutory amount, on file with CSLB
General liability$2,000,000
Workers compensationActive
DIR registrationIncluded in our packet

You can verify it at cslb.ca.gov (Check a License) using license number 472017. The public record shows the classification, the license bond and workers' compensation coverage.

The license statement

Telelink Business Services is a licensed C-7 Low Voltage Systems Contractor, CSLB License #472017. We’ve been in business since 1983. You’ll find that number in our footer, on our proposals and in the prequalification packet, and it’s the one to check. Our about page covers our history and what we install.

What the C-7 classification covers

The C-7 Low Voltage Systems classification is defined in Title 16 of the California Code of Regulations. It covers communication and low voltage systems that are energy limited and do not exceed 91 volts: telephone, sound, CATV, CCTV, satellite, instrumentation and temperature controls, and low voltage landscape lighting. For our work, that covers everything on the services page: structured copper and fiber cabling, network rooms, wireless, IP cameras, access control, intercom and entry, CATV distribution, phone systems, audio visual and nurse call.

ScopeWho carries it
Structured cabling, fiber, wireless, network roomsTelelink, self-performed
Video surveillance, access control, intercom, entry systemsTelelink, self-performed
CATV and MDU distribution, phone systems, AV, nurse callTelelink, self-performed
Burglar or intrusion alarm, alarm monitoringA licensed alarm company, under a BSIS Alarm Company Operator license
Electrified door hardware (strikes, maglocks, panic devices, operators)Division 08, or a licensed C-28 contractor
Line voltage, dedicated circuits, telecom room bondingThe electrician, C-10. Handoff shown on drawings

We do this work in commercial and institutional buildings, multifamily included. Cameras and access control are installed under the C-7 classification. Alarm monitoring runs under a separate BSIS Alarm Company Operator license. So a monitored account goes to a licensed alarm company, while the low voltage infrastructure underneath it stays with us.

How to verify the license at cslb.ca.gov

Go to cslb.ca.gov and open Check a License from the main menu. You can search by license number, business name or personnel name, but the license number, 472017, is the fastest. On the results page, select the license number to open the detail record. It shows the business name, the issue and expiration dates, the current status, the classifications held, the contractor bond with surety and amount, the workers compensation carrier and policy dates, the personnel on the license, and any disciplinary history. Save a copy for your prequalification file. If anything on that record doesn’t match this site, please call us at (916) 340-7503 before award.

License bond and insurance

The CSLB record shows the $25,000 contractor license bond that California has required of every active licensee since January 1, 2023. General liability coverage is $2,000,000, and workers compensation is active. Certificates of insurance, with additional insured endorsements naming the GC and owner and waiver of subrogation where the subcontract requires it, are issued per project. They’re included in the prequalification packet described on the for general contractors page.

Certifications and how they’re documented

This page lists only what can be verified. DIR public works registration, any BICSI credentials held by individual technicians, and any manufacturer training records are furnished in the prequalification packet as copies of the documents, rather than as claims on a web page. The manufacturers whose equipment we install and configure, such as Cisco Meraki, Yealink, ButterflyMX and DoorKing, are named on the service pages in plain words, without any dealer or partner claim.

Why the license number is on every page

California Business and Professions Code section 7030.5 requires a licensed contractor to include the license number in all advertising, and CSLB treats a website as advertising. So you’ll see CSLB #472017 in the footer of every page on this site, and in the license statement above.

What to ask any low voltage bidder

Before you put a low voltage contractor on a bid list, here’s what we’d suggest checking. Ask for the license number, and check that the classification is C-7 or another classification that actually covers the scope, and that the status is active. Confirm the business name on the bid matches the license record. Ask whether they self-perform or broker the labor. Ask for the workers compensation certificate instead of accepting a verbal assurance. On public work, ask for the DIR registration number and check it on the DIR website. If the scope includes cameras on a federally funded property, ask how they document NDAA compliance. And if they list alarm monitoring as a service under a C-7 license alone, ask what other license covers it. Each of those questions can be answered with a document, and you can ask any bidder to produce it. Our C-7 license explainer goes deeper if you’d like more detail.

Next step

Verify license 472017 at cslb.ca.gov, then send the drawings and the Division 27 and 28 sections through the request a bid page or to carson@telelinkca.com. Our bid comes back with the license number, the classification, the insurance summary and the scope handoffs on the first page, so your compliance desk can find them right away.

If you’re a general contractor and need the full prequalification packet, ask for it by email. A complete packet contains the CSLB printout, the bond and insurance certificates, the workers compensation certificate, the carrier’s experience modification rate letter, DIR public works registration and the written safety program. Ours is assembled to that list, and the for general contractors page sets out the full contents.

FAQ

Questions we get asked

Is your license active?

You can check it live at cslb.ca.gov using license number 472017. The record there shows status, classification, bond and workers compensation, and it's the authoritative version.

Link to this answer
Does a C-7 license cover access control and cameras?

Yes. C-7 covers communication and low voltage systems, including CCTV and the low voltage side of access control. Electrified door hardware is coordinated with Division 08 or a C-28 contractor, and line voltage is the electrician's scope.

Link to this answer
Are you BICSI certified?

We provide credentials as documents instead of making claims about them on a web page. Any BICSI credentials held by individual technicians and any manufacturer training records are furnished in the prequalification packet as copies.

Link to this answer
Do you have a DIR registration number?

DIR registration and current certificates are provided in the prequalification packet. On public works, you can also verify a contractor's registration on the DIR website.

Link to this answer

Didn't find your question? Ask us, and you'll talk to someone who does this work.

Call (916) 340-7503Email usOr send drawings to bid
TelelinkBusiness Services, home

Have a project coming up? Let’s talk.

Send over a drawing set or just describe what you need. We'll tell you what we can take on, what to plan for and how soon we can get there.